Bidder Selection Plan

Upgrading and renovating roundabout O

  Watching      
Find: 10:26 24/05/2024
Contractor Selection Plan ID
PL2400088859-00
Publishing time
10:23 24/05/2024
Posting Status
Published
Contractor selection plan name
Upgrading and renovating roundabout O
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400024600-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
Ủy ban nhân dân huyện Phú Tân
Approval date
20/05/2024
Approval ID
1800/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 33
1.Bidding Tender package No 01: Consulting Bidding Tender package No 01: Consulting on making construction drawing design - estimates Phase 1: section from Km0+00 to Km1+580 (Phu My town section) and Phase 2 section from Km1+580 to Km5+260 (Phu Hung commune section)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction drawing design - estimate Phase 1: section from Km0+00 to Km1+580 (Phu My town pass) and Phase 2, section from Km1+580 to Km5+260 (Phu Hung commune pass) )
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
2.Tender package No 02: Consulting on making construction drawing design - water supply pipeline estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction drawing design - estimate water supply pipeline
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
3.Tender package No 03: Consulting on preparing construction drawing design - estimating low voltage electricity relocation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction drawing designs - estimates for low voltage electrical relocation
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
4.Tender package No 04: Consulting on preparing construction drawing designs - estimates for medium voltage electricity relocation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction drawing designs - estimates for medium voltage electricity relocation
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
5.Tender package No 05: Consulting on verification of construction drawing design - estimates Phase 1: section from Km0+00 to Km1+580 (Phu My town area) and Phase 2 section from Km1+580 to Km5 +260 (Phu Hung commune section)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing design - estimate Phase 1: section from Km0+00 to Km1+580 (section through Phu My town) and Phase 2 section from Km1+580 to Km5+260 (section through Phu commune Hung)
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
6.Tender package No 06: Consulting on verification of construction drawing design - water supply pipeline estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing design - water supply pipeline estimate
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
7.Tender package No 07: Consulting on verification of construction drawing design - estimate of low voltage electricity relocation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing designs - estimates for low voltage electricity relocation
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
8.Tender package No 08: Consulting on verification of construction drawing design - estimate of medium voltage electricity relocation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing designs - estimates for medium voltage electrical relocation
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
9.Bidding package number 09: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package 24
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-Bidding Documents and evaluate E-Bidding Documents for bidding package 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
10.Bidding package No. 10: Consulting on appraisal of E-HSMT and Result of bidding package 24
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of E-Bidding Documents and Result of Bidding Package 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
11.Bidding package No. 11: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package 25
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-Bidding Documents and evaluate E-Bidding Documents for bidding package 25
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
12.Tender package No 12: Consulting on appraisal of E-HSMT and Result of Package 25
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of E-Dossier and Result of Bidding Package 25
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
13.Bidding package No. 13: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package 26
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-Bidding and evaluate E-Bidding package 26
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
14.Tender package No 14: Consulting on appraisal of E-HSMT and Result of Package 26
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of E-Bidding Documents and Result of Bidding Package 26
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
15.Bidding package No. 15: Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding package 24
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-Bidding Documents and evaluate E-Bidding Documents for bidding package 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
16.Tender package No 16: Consulting on appraisal of E-HSMT and Result of Package 24
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of E-Bidding Documents and Result of Bidding Package 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
17.Tender package No 17: Construction supervision consultancy for package 24
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction of package 24
Capital source details
District budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
18.Tender package No 11: Construction supervision consultancy for Tender package No 25
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision of package number 25
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
19.Tender package No 19: Construction supervision consultancy for water supply pipelines
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the construction of water supply pipelines
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
20.Tender package No 20: Consulting on construction supervision and relocation of low voltage electricity
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and relocation of low voltage electricity
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
21.Tender package No 21: Consulting on construction supervision and relocation of medium voltage electricity
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and relocation of medium voltage electricity
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
22.Tender package No 22: Consulting on control experiments for construction of Tender package No 24
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments on construction items to check the quality of works in bidding package No. 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
23.Tender package No 23: Consulting on control experiments for construction of Tender package No 25
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments on construction items to check the quality of works of package No. 25
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
24.Tender package No 24: Construction and installation of Phase 1: From Km0+00 to Km1+580 (section through Phu My town)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Total route length: L=1,580m. - Pavement structure: C12.5 hot asphalt concrete, 7cm thick, Eyc >=149.24Mpa
Capital source details
District budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
25.Tender package No 25: Construction and installation of Phase 2: From Km1+58 to Km5+260 (section through Phu Hung commune)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Total route length: L = 3,680m' - Pavement structure: 3.5cm thick asphalt pavement. BC 4.5kg/m2
Capital source details
District budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
26.Tender package No 26: Construction and installation of water supply pipeline works
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of domestic water supply pipelines
Capital source details
District budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
27.Tender package No 27: Construction of low voltage electricity relocation project
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Relocation of low voltage electrical system
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
28.Tender package No 28: Construction and installation of medium voltage electricity relocation project
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Relocation of medium voltage electrical system
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
29.Tender package No 29: Insurance for construction works for Tender package No 24
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance for construction works for package number 24
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
30.Tender package No 30: Insurance for construction works for Tender package No 25
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance for construction works for package number 25
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
31.Tender package No 31: Insurance for water supply pipeline works
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance for water supply pipelines
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
32.Tender package No 32: Insurance for low-voltage electrical relocation works
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project insurance Relocation of low voltage electricity
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province
33.Tender package No 33: Insurance for medium voltage electrical relocation works
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project insurance Relocation of medium voltage electricity
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phú Tân District, An Giang
Implementation location (Before merge)
An Giang province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Upgrading and renovating roundabout O". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Upgrading and renovating roundabout O" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 18

You did not use the site, Click here to remain logged. Timeout: 60 second