Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD duyet DA va KHLCNT (2024-2026) so 4809 ngay 29.6.2024.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 13
1.Consulting on topographic surveying step of setting up construction drawing design
8.Consulting on preparing Bidding Documents and evaluating Bidding Documents for the bidding package of physical protection design and cost estimates (Bridge, traffic, drainage, irrigation categories); Construction supervision (Bridge, traffic, drainage and irrigation categories); Construction works (Bridge, traffic, drainage and irrigation categories); Construction and equipment installation (power supply items), construction work insurance.
9.Consulting on appraisal of environmental documents and contractor selection results for the financial protection design package and estimates (Bridge, traffic, drainage, irrigation categories); Construction supervision (Bridge, traffic, drainage and irrigation categories); Construction works (Bridge, traffic, drainage and irrigation categories); Construction and equipment installation (power supply items), construction work insurance.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Upgrading dike lines in Sub-region I, area B, Binh Loi commune". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Upgrading dike lines in Sub-region I, area B, Binh Loi commune" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.