Upgrading medium-voltage lines on line 471G, line 474G, line 474G1, line 474G1.1 and improve the line crossing the river without reaching the static level 10B, line 474G, poles 23-24, line 478G
Upgrading medium-voltage lines on line 471G, line 474G, line 474G1, line 474G1.1 and improve the line crossing the river without reaching the static level 10B, line 474G, poles 23-24, line 478G
1.Tender package No 1: Consulting survey, preparation of technical and economic reports for construction works Upgrading the 471G, 474G, 474G1, 474G1.1 and 478G lines.
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2019
Contract Type
All in one
Prequalification
No
Location
2.Package 2: Construction survey supervision to serve the preparation of technical and economic reports for construction work Upgrading the 471G, 474G, 474G1, 474G1.1 and 478G lines
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2019
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Upgrading medium-voltage lines on line 471G, line 474G, line 474G1, line 474G1.1 and improve the line crossing the river without reaching the static level 10B, line 474G, poles 23-24, line 478G". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Upgrading medium-voltage lines on line 471G, line 474G, line 474G1, line 474G1.1 and improve the line crossing the river without reaching the static level 10B, line 474G, poles 23-24, line 478G" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.