Bidder Selection Plan

Upgrading Tran Phu street, Bac Lieu city

  Watching      
Find: 10:34 10/02/2025
Contractor Selection Plan ID
PL2400304174-01
Publishing time
10:33 10/02/2025
Posting Status
Published
Contractor selection plan name
Upgrading Tran Phu street, Bac Lieu city
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400075059-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
4 Years
Authority that issues the decision
Ủy ban nhân dân tỉnh Bạc Liêu.
Approval date
27/03/2024
Approval ID
458/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 13
1.TV01: Construction survey consulting (stage of making construction drawing design and estimate) and making construction drawing design and - estimate.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Carry out topographic surveys to provide data to prepare construction drawing design documents. - Prepare construction drawing design documents and estimates
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
2.TV02: Topographic survey supervision consulting (construction drawing design and estimate phase).
Tender/ Prequalification Notice ID
Contract execution period
5 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out supervision and inspection of topographic survey work
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
3.TV03: Consulting on valuation
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out appraisal and issue price certificates for materials and equipment as required by the investor
Capital source details
The Provincial budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
4.TV04: Consulting on verification of construction drawing design and estimates.
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify and check construction drawing design documents and estimates
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
5.TV05: Consulting on preparing bidding documents and evaluating bid documents for construction packages | project
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents and evaluate bid documents for construction packages
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
6.TV06: Consulting on appraisal of bidding documents and contractor selection results for construction packages | construction works
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out appraisal of bidding documents and results of contractor selection for construction packages
Capital source details
The Provincial budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
7.TV07: Consulting on preparing bidding documents and evaluating bid documents for construction supervision consulting packages.
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents and evaluate bids for construction supervision consulting packages
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021-2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
8.TV08: Consulting on appraisal of bidding documents and contractor selection results for construction supervision consulting packages
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform lake appraisal | Bidding documents and results of contractor selection for the construction supervision consulting package
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025.
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
9.TV09: Consulting on traffic safety verification.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out traffic safety inspection.
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
10.TV10: Consulting on construction supervision
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out supervision and inspection of construction works
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
11.TV11: Independent audit consultancy.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform project audits.
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
12.BH01: Consulting on construction insurance
Tender/ Prequalification Notice ID
Contract execution period
605 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Implement construction project insurance
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No
13.XL01: Construction of Tran Phu Street Upgrade project.
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction of Tran Phu Street Upgrade project.
Capital source details
Tinh Budget belongs to the medium-term public investment plan for the period 2021 - 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Fixed unit price
Implementation location
Bạc Liêu City, Province Bạc Liêu
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Upgrading Tran Phu street, Bac Lieu city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Upgrading Tran Phu street, Bac Lieu city" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 31

You did not use the site, Click here to remain logged. Timeout: 60 second