Bidder Selection Plan

Vinh Thanh Industrial Pump Station Project

  Watching      
Find: 20:58 02/07/2025
Contractor Selection Plan ID
PL2500166055-00
Publishing time
19:12 02/07/2025
Posting Status
Published
Contractor selection plan name
Vinh Thanh Industrial Pump Station Project
Investment objective
- The project is built to prepare the daily water source and booster facilities to meet the high demand for both flow and pressure of Vinh Thanh Industrial Park being built, but the existing transfer pipeline along Highway 80 is unable to meet. - Completing infrastructure to promote the investment of enterprises in industrial parks, contributing to socio -economic development for the region.
Project management forms
Another form
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500040758-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
2 Years
Authority that issues the decision
CÔNG TY CP CẤP NƯỚC THỐT NỐT
Approval date
27/06/2025
Approval ID
69/QĐ-CNTN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 9
1.No. 1: Making bidding documents, required documents; Evaluation of bids, proposals
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, request dossiers; Evaluation of bids, proposals
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.No. 2: Appraisal of bidding documents, request dossiers; Evaluation of contractor selection results
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents, request dossiers; Evaluation of contractor selection results
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Number 3: Equipment valuation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Equipment cost appraisal
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Number 4: + Try static pile (2 hearts) + Construction costs + Supply pumps and equipment.
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Static pile test (2 hearts); Clean water tanks; Pumping station; House for generators, chemicals and WC; Fence; Technical and technological pipes; Internal roads, drainage systems; Electricity and lighting; 03 LTTĐ pumps: Q = 120m3/h, h = 35m, n = 22kw; 03 turbin pumps q = 650m3/h, h = 35m, n = 90kW; 01 system of turbidity, chlorine and indicators display; 01 chlorine magnet 0-2 kg/h, install the tip of the bottle, 500kg chlorine bottles; 01 250 kW generator; 03 ATV630 22KW inverters; 03 variables to pump Turbin ATV630 90kW; 01 electronic flow meter D300; 01 250 KVA transformer station; Run the device test.
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.No. 5: Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Number 6: Monitoring of equipment installation
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Equipment installation supervision
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.No. 7: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.Number 8: Verification of settlement approval
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification and approval of settlement
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.Number 9: Independent audit
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Independent audit
Capital source details
Depreciation of CB, Development Fund and other mobilization
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Vinh Thanh Industrial Pump Station Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Vinh Thanh Industrial Pump Station Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 44

You did not use the site, Click here to remain logged. Timeout: 60 second