- The project is built to prepare the daily water source and booster facilities to meet the high demand for both flow and pressure of Vinh Thanh Industrial Park being built, but the existing transfer pipeline along Highway 80 is unable to meet.
- Completing infrastructure to promote the investment of enterprises in industrial parks, contributing to socio -economic development for the region.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QUYET DINH 69.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 9
1.No. 1: Making bidding documents, required documents; Evaluation of bids, proposals
Static pile test (2 hearts); Clean water tanks; Pumping station; House for generators, chemicals and WC; Fence; Technical and technological pipes; Internal roads, drainage systems; Electricity and lighting; 03 LTTĐ pumps: Q = 120m3/h, h = 35m, n = 22kw; 03 turbin pumps q = 650m3/h, h = 35m, n = 90kW; 01 system of turbidity, chlorine and indicators display; 01 chlorine magnet 0-2 kg/h, install the tip of the bottle, 500kg chlorine bottles; 01 250 kW generator; 03 ATV630 22KW inverters; 03 variables to pump Turbin ATV630 90kW; 01 electronic flow meter D300; 01 250 KVA transformer station; Run the device test.
Capital source details
Depreciation of CB, Development Fund and other mobilization
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Vinh Thanh Industrial Pump Station Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Vinh Thanh Industrial Pump Station Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.