TV1-JICA3 “Survey, design and supervise project implementation”
Watching
Project
Contractor selection plan
Prequalification Notice
Prequalification results
Bid award
Prequalification Notice ID
20170500522-00
Contractor selection methods
there is an international pre-qualification
Publication status
Offical notice
Notice Status
Notice posted for the first time
Name of Tender Notice
TV1-JICA3 “Survey, design and supervise project implementation”
Prequalifying invitation documents . release time
Place of issue and receipt of Prequalifying invitation documents
Prequalification opening date
Prequalification Document Submission Method
Direct
Name of project
WATER MANAGEMENT BEN TRUE
Contractor Selection Method
Single Stage Single Envelope
Contract Period
72 months
List of attached files:
| Number |
Text type name |
Filename |
Download files |
| 1 |
Notice of invitation for pre-qualification |
TBMQT (lan 2).pdf |
Download
|
| 2 |
Notice of invitation for pre-qualification |
EOI Request (secon time).pdf |
Download
|
| Large files can only be downloaded using Internet Explorer, please see instructions here! |