Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây as follows:
- Has relationships with 98 contractor.
- Announced 61 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 163 contractor selection plans with a total of 794 bidding packages, of which 38 prequalification documents have not found the investment project.
- Has invited bids for 147 packages (with 165 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 118 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 660 packages that have not fully posted the contractor selection results. Of these 645 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.57 contractors.
- Breakdown by bidding field: Goods 4.24%, Construction 81.82%, Consultancy 13.33%, Non-consultancy 0.61%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 688,018,598,574 VND, of which the total winning bid value is: 653,402,505,347 VND.
- The savings rate is: 5.03%.
Data analysis results of DauThau.info software for bid solicitors BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây as follows:
- Has relationships with 98 contractor.
- The average number of contractors participating in each bidding package is: 2.57 contractors.
- Proportion of bidding fields: Goods 4.24%, Construction 81.82%, Consulting 13.33%, Non-consulting 0.61%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 688,018,598,574 VND, in which the total winning value is: 653,402,505,347 VND.
- The savings rate is: 5.03%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 61 investment and development projects.
- As the owner of 27 Contractor selection plan in which 27 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 73 bidding packages in which 65 packages are self-invited, and 8 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Regarding the approval of the contractor selection plan (phase 2) Project: Upgrading and repairing DH.83 road (Son Tan - Son Lap). Item: Foundation, road surface, horizontal drainage and vertical drainage, route: Km35+092 – Km44+920. Construction location: Son Lap commune - Son Tay district of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 7 bidding package.
08/10/2024 10:23
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Upgrading and repairing DH.83 road (Son Tan - Son Lap).
08/10/2024 09:09
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Approve the contractor selection plan Project: Ra Manh Road - Long Vot Construction location: Son Long commune - Son Tay district of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 6 bidding package.
15/08/2024 14:52
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Ra Manh Road - Long Vot.
15/08/2024 14:14
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Contractor selection plan Project: Son Tan Commune Sports Center of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
25/06/2024 17:01
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Contractor selection plan Project: Road from Mr. Tham's hamlet to Nuoc Dot Residential Area, Mang Ta Be village of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
25/06/2024 16:30
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Son Tan Commune Sports Center.
25/06/2024 16:16
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project The road from Mr. Tham's hamlet to Nuoc Dot Residential Area, Mang Ta Be village.
25/06/2024 10:10
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Project contractor selection plan: Mang Ta Be village domestic water supply system of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
07/06/2024 15:14
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Domestic water supply system of Mang Ta Be village.
07/06/2024 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Regarding the approval of the contractor selection plan (phase 2) Project: Upgrading and repairing DH.83 road (Son Tan - Son Lap). Item: Foundation, road surface, horizontal drainage and vertical drainage, route: Km35+092 – Km44+920. Construction location: Son Lap commune - Son Tay district with 7 bidding package .
08/10/2024 10:23
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Approve the contractor selection plan Project: Ra Manh Road - Long Vot Construction location: Son Long commune - Son Tay district with 6 bidding package .
15/08/2024 14:52
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Contractor selection plan Project: Son Tan Commune Sports Center with 4 bidding package .
25/06/2024 17:01
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Contractor selection plan Project: Road from Mr. Tham's hamlet to Nuoc Dot Residential Area, Mang Ta Be village with 4 bidding package .
25/06/2024 16:30
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Project contractor selection plan: Mang Ta Be village domestic water supply system with 4 bidding package .
07/06/2024 15:14
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Plan for contractor selection phase 2 with 1 bidding package .
29/05/2024 16:43
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây announced the results of the bid package Package 06: Construction and installation of construction equipment .
- Winning bidder: CÔNG TY CỔ PHẦN QUANG DUY
05/03/2024 16:14
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây publishes the plan Contractor selection plan Project: Expanding TuKaPan kindergarten (main school) with 4 bidding package .
17/01/2024 14:21
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây announced the results of the bid package Tender package No 03: Construction .
- Winning bidder: CÔNG TY TNHH MIỀN TÂY.
15/01/2024 09:57
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây announced the results of the bid package Bidding package No. 06: Providing public services in Son Tay district in 2024 .
- Winning bidder: QUANG NGAI URBAN ENVIRONMENT JOINT STOCK COMPANY
08/01/2024 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Regarding the approval of the contractor selection plan (phase 2) Project: Upgrading and repairing DH.83 road (Son Tan - Son Lap). Item: Foundation, road surface, horizontal drainage and vertical drainage, route: Km35+092 – Km44+920. Construction location: Son Lap commune - Son Tay district of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 7 bidding package.
08/10/2024 10:23
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Upgrading and repairing DH.83 road (Son Tan - Son Lap).
08/10/2024 09:09
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Approve the contractor selection plan Project: Ra Manh Road - Long Vot Construction location: Son Long commune - Son Tay district of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 6 bidding package.
15/08/2024 14:52
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Ra Manh Road - Long Vot.
15/08/2024 14:14
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Contractor selection plan Project: Son Tan Commune Sports Center of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
25/06/2024 17:01
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Contractor selection plan Project: Road from Mr. Tham's hamlet to Nuoc Dot Residential Area, Mang Ta Be village of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
25/06/2024 16:30
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Son Tan Commune Sports Center.
25/06/2024 16:16
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project The road from Mr. Tham's hamlet to Nuoc Dot Residential Area, Mang Ta Be village.
25/06/2024 10:10
The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted the request Project contractor selection plan: Mang Ta Be village domestic water supply system of the investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây with 4 bidding package.
07/06/2024 15:14
BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây Posted Development Investment Project Domestic water supply system of Mang Ta Be village.
07/06/2024 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted 163 of the contractor selection plan, which contains 794 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted 165 Tender Notice in the 147 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has posted 118 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 118 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has a relationship with 98 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây is the investor of 73 package, of which 65 package is self-invited, other units invite bid 8 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây is the owner of 27 contractor selection plan. In which, they self-invite 27 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây is an investor with 83 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BQL dự án Đầu tư Xây dựng và phát triển quỹ đất huyện Sơn Tây is the investor of 61 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code