Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất thành phố Đà Nẵng as follows:
- Has relationships with 12 contractor.
- Announced 23 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 54 contractor selection plans with a total of 85 bidding packages, of which 23 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 78 packages that have not fully posted the contractor selection results. Of these 77 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.20 contractors.
- Breakdown by bidding field: Goods 0%, Construction 37.50%, Consultancy 37.50%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 11,243,734,853 VND, of which the total winning bid value is: 9,271,706,207 VND.
- The savings rate is: 17.54%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất thành phố Đà Nẵng as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 2.20 contractors.
- Proportion of bidding fields: Goods 0%, Construction 37.50%, Consulting 37.50%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 11,243,734,853 VND, in which the total winning value is: 9,271,706,207 VND.
- The savings rate is: 17.54%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 23 investment and development projects.
- As the owner of 39 Contractor selection plan in which 39 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 6 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Consulting on making investment project proposal documents for Creative Space project in Hoa Xuan ward, Cam Le district of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
08/09/2022 09:27
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Choose a consultant to make an investment project proposal for the land area 522B Nguyen Luong Bang, Hoa Hiep Nam ward, Lien Chieu district, Da Nang city of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
23/08/2022 10:41
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request select a consulting unit to make an investment project proposal for the land area with the symbol TMDV in Area 2 - Northwest New Urban Center, Hoa Minh Ward, Lien Chieu District of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
23/08/2022 10:27
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Decision on approval of urban planning to supplement the technical infrastructure project of Resettlement Area No. 6 in the KTQD streak along the DT602 route (section from Hoa Son Prison to the South bypass of Hai Van tunnel) of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 2 bidding package.
25/07/2022 22:37
Trung tâm phát triển quỹ đất thành phố Đà Nẵng Posted Development Investment Project HTKT Resettlement Area No. 6 belongs to KTQD streak along DT602 road (section from Hoa Son Prison to the South bypass of Hai Van tunnel).
25/07/2022 07:00
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Verification of the estimated value. Additional volume of debris transportation, lower prices of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:20
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Consulting on planning for environmental protection of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:18
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Verification of the estimated value for registration of the environmental protection plan of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:15
Trung tâm phát triển quỹ đất thành phố Đà Nẵng Posted Development Investment Project HTKT Zone No. 4 – Architectural streak of the project of upgrading and expanding Le Van Hien and Tran Dai Nghia streets (area of Vinaford Company).
13/06/2022 07:00
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request The plan to select a legal consultant to organize the auction of land use rights for the Creative Space project in Hoa Xuan ward, Cam Le district of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
08/06/2022 14:27
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Consulting on making investment project proposal documents for Creative Space project in Hoa Xuan ward, Cam Le district with 1 bidding package .
08/09/2022 09:27
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Choose a consultant to make an investment project proposal for the land area 522B Nguyen Luong Bang, Hoa Hiep Nam ward, Lien Chieu district, Da Nang city with 1 bidding package .
23/08/2022 10:41
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan select a consulting unit to make an investment project proposal for the land area with the symbol TMDV in Area 2 - Northwest New Urban Center, Hoa Minh Ward, Lien Chieu District with 1 bidding package .
23/08/2022 10:27
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Decision on approval of urban planning to supplement the technical infrastructure project of Resettlement Area No. 6 in the KTQD streak along the DT602 route (section from Hoa Son Prison to the South bypass of Hai Van tunnel) with 2 bidding package .
25/07/2022 22:37
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Verification of the estimated value. Additional volume of debris transportation, lower prices with 1 bidding package .
13/06/2022 08:20
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Consulting on planning for environmental protection with 1 bidding package .
13/06/2022 08:18
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Verification of the estimated value for registration of the environmental protection plan with 1 bidding package .
13/06/2022 08:15
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan The plan to select a legal consultant to organize the auction of land use rights for the Creative Space project in Hoa Xuan ward, Cam Le district with 1 bidding package .
08/06/2022 14:27
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan The plan to select a legal consultant to organize the auction of land use rights for the Creative Space project in Hoa Xuan ward, Cam Le district with 1 bidding package .
08/06/2022 14:09
Trung tâm phát triển quỹ đất thành phố Đà Nẵng publishes the plan Tender package: Procurement of assets for the Development Center with 1 bidding package .
30/05/2022 13:59
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Consulting on making investment project proposal documents for Creative Space project in Hoa Xuan ward, Cam Le district of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
08/09/2022 09:27
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Choose a consultant to make an investment project proposal for the land area 522B Nguyen Luong Bang, Hoa Hiep Nam ward, Lien Chieu district, Da Nang city of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
23/08/2022 10:41
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request select a consulting unit to make an investment project proposal for the land area with the symbol TMDV in Area 2 - Northwest New Urban Center, Hoa Minh Ward, Lien Chieu District of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
23/08/2022 10:27
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Decision on approval of urban planning to supplement the technical infrastructure project of Resettlement Area No. 6 in the KTQD streak along the DT602 route (section from Hoa Son Prison to the South bypass of Hai Van tunnel) of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 2 bidding package.
25/07/2022 22:37
Trung tâm phát triển quỹ đất thành phố Đà Nẵng Posted Development Investment Project HTKT Resettlement Area No. 6 belongs to KTQD streak along DT602 road (section from Hoa Son Prison to the South bypass of Hai Van tunnel).
25/07/2022 07:00
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Verification of the estimated value. Additional volume of debris transportation, lower prices of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:20
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Consulting on planning for environmental protection of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:18
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request Verification of the estimated value for registration of the environmental protection plan of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
13/06/2022 08:15
Trung tâm phát triển quỹ đất thành phố Đà Nẵng Posted Development Investment Project HTKT Zone No. 4 – Architectural streak of the project of upgrading and expanding Le Van Hien and Tran Dai Nghia streets (area of Vinaford Company).
13/06/2022 07:00
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted the request The plan to select a legal consultant to organize the auction of land use rights for the Creative Space project in Hoa Xuan ward, Cam Le district of the investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng with 1 bidding package.
08/06/2022 14:27
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted 54 of the contractor selection plan, which contains 85 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted 8 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng is the owner of 39 contractor selection plan. In which, they self-invite 39 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng is an investor with 12 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Đà Nẵng is the investor of 23 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code