Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Nhà máy quốc phòng A29 as follows:
- Has relationships with 68 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 169 contractor selection plans with a total of 176 bidding packages, of which 167 prequalification documents have not found the investment project.
- Has invited bids for 141 packages (with 144 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 163 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 23 packages with results that do not have tender notice or prequalification notice.
- There are 13 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.40 contractors.
- Breakdown by bidding field: Goods 93.06%, Construction 0%, Consultancy 0%, Non-consultancy 6.94%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 178,319,897,034 VND, of which the total winning bid value is: 176,156,966,984 VND.
- The savings rate is: 1.21%.
Data analysis results of DauThau.info software for bid solicitors Nhà máy quốc phòng A29 as follows:
- Has relationships with 68 contractor.
- The average number of contractors participating in each bidding package is: 1.40 contractors.
- Proportion of bidding fields: Goods 93.06%, Construction 0%, Consulting 0%, Non-consulting 6.94%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 178,319,897,034 VND, in which the total winning value is: 176,156,966,984 VND.
- The savings rate is: 1.21%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 135 Contractor selection plan in which 135 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 147 bidding packages in which 144 packages are self-invited, and 3 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Package TV-02: Consulting and supervision of survey work of the investor Nhà máy quốc phòng A29.
- Winning bidder: LAM GIANG CONSTRUCTION CONSULTING AND PROJECT MANAGEMENT JOINT STOCK COMPANY
08/10/2024 07:26
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Bid TV-01: Topographic and geological survey, preparation of feasibility study report for construction investment project of the investor Nhà máy quốc phòng A29.
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
08/10/2024 07:23
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Inspected 12 lifting equipment, 21 pressure equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: Trung tâm Kiểm định kỹ thuật an toàn quân đội
07/10/2024 14:35
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: VTR TRADING COMPANY LIMITED
04/10/2024 09:43
The Bid solicitor Nhà máy quốc phòng A29 has posted the request Inspection of machines, equipment, and materials with strict requirements on labor safety in 2024 of the investor Nhà máy quốc phòng A29 with 1 bidding package.
01/10/2024 15:59
Bid solicitor Nhà máy quốc phòng A29 has posted Tender Notice Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29 with the form Competitive Offer.
20/09/2024 10:53
The Bid solicitor Nhà máy quốc phòng A29 has posted the request Procurement of materials and goods for factory repair in the 10th phase of 2024 of the investor Nhà máy quốc phòng A29 with 1 bidding package.
18/09/2024 07:54
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 477 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ THƯƠNG MẠI TÂN MINH HUYỀN
20/08/2024 07:40
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 04 categories of equipment to serve the repair of technical equipment of the Factory of the investor Nhà máy quốc phòng A29.
- Winning bidder: DAI HOA MINH DEVELOPMENT AND INVESTMENT COMPANY LIMITED
08/08/2024 10:29
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Bidding package No. TV-04: Appraisal of bidding documents and results of contractor selection for bidding packages of the investor Nhà máy quốc phòng A29.
- Winning bidder: PHU QUY MTV CONSTRUCTION CONSULTING COMPANY LIMITED
08/08/2024 10:14
The data sheet has been partially hidden, to see the full information please Login or Register
Nhà máy quốc phòng A29 announced the results of the bid package Package TV-02: Consulting and supervision of survey work .
- Winning bidder: LAM GIANG CONSTRUCTION CONSULTING AND PROJECT MANAGEMENT JOINT STOCK COMPANY
08/10/2024 07:26
Nhà máy quốc phòng A29 announced the results of the bid package Bid TV-01: Topographic and geological survey, preparation of feasibility study report for construction investment project .
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
08/10/2024 07:23
Nhà máy quốc phòng A29 announced the results of the bid package Inspected 12 lifting equipment, 21 pressure equipment .
- Winning bidder: Trung tâm Kiểm định kỹ thuật an toàn quân đội
07/10/2024 14:35
Nhà máy quốc phòng A29 announced the results of the bid package Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment .
- Winning bidder: VTR TRADING COMPANY LIMITED
04/10/2024 09:43
Nhà máy quốc phòng A29 publishes the plan Inspection of machines, equipment, and materials with strict requirements on labor safety in 2024 with 1 bidding package .
01/10/2024 15:59
Nhà máy quốc phòng A29 announced the results of the bidding package Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment with 1 participating contractors .
27/09/2024 08:07
Nhà máy quốc phòng A29 publishes Tender Notice Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment in the form Competitive Offer .
20/09/2024 10:53
Nhà máy quốc phòng A29 publishes the plan Procurement of materials and goods for factory repair in the 10th phase of 2024 with 1 bidding package .
18/09/2024 07:54
Nhà máy quốc phòng A29 announced the results of the bid package Procurement of 477 lists of materials and goods to serve the repair of the Factory's technical equipment .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ THƯƠNG MẠI TÂN MINH HUYỀN
20/08/2024 07:40
Nhà máy quốc phòng A29 announced the results of the bidding package Procurement of 477 lists of materials and goods to serve the repair of the Factory's technical equipment with 1 participating contractors .
13/08/2024 08:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Package TV-02: Consulting and supervision of survey work of the investor Nhà máy quốc phòng A29.
- Winning bidder: LAM GIANG CONSTRUCTION CONSULTING AND PROJECT MANAGEMENT JOINT STOCK COMPANY
08/10/2024 07:26
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Bid TV-01: Topographic and geological survey, preparation of feasibility study report for construction investment project of the investor Nhà máy quốc phòng A29.
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
08/10/2024 07:23
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Inspected 12 lifting equipment, 21 pressure equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: Trung tâm Kiểm định kỹ thuật an toàn quân đội
07/10/2024 14:35
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: VTR TRADING COMPANY LIMITED
04/10/2024 09:43
The Bid solicitor Nhà máy quốc phòng A29 has posted the request Inspection of machines, equipment, and materials with strict requirements on labor safety in 2024 of the investor Nhà máy quốc phòng A29 with 1 bidding package.
01/10/2024 15:59
Bid solicitor Nhà máy quốc phòng A29 has posted Tender Notice Procurement of 437 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29 with the form Competitive Offer.
20/09/2024 10:53
The Bid solicitor Nhà máy quốc phòng A29 has posted the request Procurement of materials and goods for factory repair in the 10th phase of 2024 of the investor Nhà máy quốc phòng A29 with 1 bidding package.
18/09/2024 07:54
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 477 lists of materials and goods to serve the repair of the Factory's technical equipment of the investor Nhà máy quốc phòng A29.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ THƯƠNG MẠI TÂN MINH HUYỀN
20/08/2024 07:40
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Procurement of 04 categories of equipment to serve the repair of technical equipment of the Factory of the investor Nhà máy quốc phòng A29.
- Winning bidder: DAI HOA MINH DEVELOPMENT AND INVESTMENT COMPANY LIMITED
08/08/2024 10:29
The Bid solicitor Nhà máy quốc phòng A29 has posted the results of the bidding package Bidding package No. TV-04: Appraisal of bidding documents and results of contractor selection for bidding packages of the investor Nhà máy quốc phòng A29.
- Winning bidder: PHU QUY MTV CONSTRUCTION CONSULTING COMPANY LIMITED
08/08/2024 10:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Nhà máy quốc phòng A29 has posted 169 of the contractor selection plan, which contains 176 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Nhà máy quốc phòng A29 has posted 144 Tender Notice in the 141 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Nhà máy quốc phòng A29 has posted 163 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 163 package, canceled the bid 0 package (among the bidding packages above).
- There are 23 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Nhà máy quốc phòng A29 has a relationship with 68 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Nhà máy quốc phòng A29 has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Nhà máy quốc phòng A29 is the investor of 147 package, of which 144 package is self-invited, other units invite bid 3 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Nhà máy quốc phòng A29 is the owner of 135 contractor selection plan. In which, they self-invite 135 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Nhà máy quốc phòng A29 is an investor with 68 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Nhà máy quốc phòng A29 is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code