Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors 49 ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 17 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 17 bidding packages, of which 15 prequalification documents have not found the investment project.
- Has invited bids for 11 packages (with 12 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.40 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 19,550,447,048 VND, of which the total winning bid value is: 19,401,701,620 VND.
- The savings rate is: 0.76%.
Data analysis results of DauThau.info software for bid solicitors 49 ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 1.40 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 19,550,447,048 VND, in which the total winning value is: 19,401,701,620 VND.
- The savings rate is: 0.76%.
This Bid solicitor is also an investor. The analysis results of data for the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 25 contractor selection plans, of which 15 were self-published, and 10 were published by other entities.
- Is the investor of 20 Tender Notices, of which 12 were self-invited, and 8 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 107 bidding packages, of which 107 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 6.94% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.98% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (33), Lào Cai (3), Ninh Bình (2), Bắc Ninh (2), Cần Thơ (1), Nghệ An (1), Quảng Ninh (1), Undefined (64)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (33), Yên Bái (3), Ninh Bình (1), Sóc Trăng (1), Nghệ An (1), Nam Định (1), Quảng Ninh (1), Bắc Giang (1), Bắc Ninh (1), Undefined (64)
- Has relationships with 59 Bid Solicitors
- Has competed against 9 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 17 contractors in 12 bidding packages, won 12 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 3 bidding packages with 1 roles.
- Name of construction organization: CÔNG TY TNHH MỘT THÀNH VIÊN 49
- Code of capacity certificate of construction activities: 00012531
- Issuer: Sở Kế hoạch và Đầu tư Thành phố Hà Nội
- Fields:
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng, nhà công nghiệp
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình hạ tầng kỹ thuật cấp nước, thoát nước
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình giao thông đường bộ; cầu
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn thủy lợi
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình dân dụng, nhà công nghiệp
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình hạ tầng kỹ thuật (cấp nước, thoát nước),
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình giao thông đường bộ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Buying materials to repair motorbikes at the 2026 Army Engineering Sports Festival with 1 bidding package .
13/01/2026 11:18
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop .
- Winning bidder: Hộ Kinh doanh Nguyễn Huy Cường
15/12/2025 14:50
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchase supplies for maintenance and repair of technology line equipment .
- Winning bidder: HỘ KINH DOANH LÊ THỊ HỒNG
02/12/2025 14:15
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop in the form Competitive Offer .
01/12/2025 14:20
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop with 1 bidding package .
30/11/2025 16:14
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchase supplies for maintenance and repair of technology line equipment with 1 bidding package .
25/11/2025 20:18
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchase materials to produce A2 obstacles, phase 2 of 2025 .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ VÂN TUYẾT
21/11/2025 14:19
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchase materials to produce A2 obstacles, phase 2 of 2025 with 1 bidding package .
19/11/2025 09:43
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Buying motorbike repair materials for the 8th period of 2025 .
- Winning bidder: HỘ KINH DOANH NGUYỄN HỮU HOÀNG VŨ
01/11/2025 07:33
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Buying motorbike repair materials for the 8th period of 2025 with 1 bidding package .
27/10/2025 14:41
The data sheet has been partially hidden, to see the full information please Login or Register
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 2: Monitoring of equipment installation .
- Winning bidder: APCHITECH TURE CONSULTANCY AND INDUSTRIAL CONSTRUCTION JOINT STOCK COMPANY
29/08/2025 15:43
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package TV-02: Monitoring of equipment installation .
- Winning bidder: APCHITECH TURE CONSULTANCY AND INDUSTRIAL CONSTRUCTION JOINT STOCK COMPANY
29/08/2025 15:39
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package TV-01 bidding package: Making Bidding Documents, evaluating Bid dossier .
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
04/07/2025 10:34
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Report KTK In depth technology of Z49 factory technology in 2025 with 3 bidding package .
04/07/2025 10:27
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Buy Motorbike repair materials for the 6th period of 2025 with 1 bidding package .
01/07/2025 13:36
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Buy Motorcycle Repair Materials for 525 .
- Winning bidder: HỘ KINH DOANH NGUYỄN HỮU HOÀNG VŨ
19/06/2025 11:29
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bidding package Buy Motorcycle Repair Materials for 525 with 1 participating contractors .
16/06/2025 08:12
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Buying Materials for Production of Defense goods in 2025 .
- Winning bidder: HỘ KINH DOANH TẠ THỊ ĐIỆP
13/06/2025 12:00
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bidding package Buying Materials for Production of Defense goods in 2025 with 1 participating contractors .
09/06/2025 09:13
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Buy Motorcycle Repair Materials for 525 in the form Competitive Offer .
04/06/2025 11:54
The data sheet has been partially hidden, to see the full information please Login or Register
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Buying materials to repair motorbikes at the 2026 Army Engineering Sports Festival with 1 bidding package .
13/01/2026 11:18
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop .
- Winning bidder: Hộ Kinh doanh Nguyễn Huy Cường
15/12/2025 14:50
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchase supplies for maintenance and repair of technology line equipment .
- Winning bidder: HỘ KINH DOANH LÊ THỊ HỒNG
02/12/2025 14:15
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop in the form Competitive Offer .
01/12/2025 14:20
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchasing materials for maintenance and repair of technology line equipment for Hydraulic Mechanical Workshop, Mechanical and Materials Workshop, Thin Shell Structure Workshop, Composite Workshop with 1 bidding package .
30/11/2025 16:14
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchase supplies for maintenance and repair of technology line equipment with 1 bidding package .
25/11/2025 20:18
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Purchase materials to produce A2 obstacles, phase 2 of 2025 .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ VÂN TUYẾT
21/11/2025 14:19
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Purchase materials to produce A2 obstacles, phase 2 of 2025 with 1 bidding package .
19/11/2025 09:43
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Buying motorbike repair materials for the 8th period of 2025 .
- Winning bidder: HỘ KINH DOANH NGUYỄN HỮU HOÀNG VŨ
01/11/2025 07:33
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Buying motorbike repair materials for the 8th period of 2025 with 1 bidding package .
27/10/2025 14:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 15 of the contractor selection plan, which contains 17 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 12 Tender Notices in 11 bidding packages. Among these, 12 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity 49 ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects