Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors 49 ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 11,179,669,000 VND, of which the total winning bid value is: 11,059,351,000 VND.
- The savings rate is: 1.08%.
Data analysis results of DauThau.info software for bid solicitors 49 ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 11,179,669,000 VND, in which the total winning value is: 11,059,351,000 VND.
- The savings rate is: 1.08%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 3 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 87 bidding packages, of which 86 were won, 0 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 99.96% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.78% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (18), Ninh Bình (1), Nam Định (1), Yên Bái (1), Undefined (66)
- Has relationships with 51 Bid Solicitors
- Has competed against 5 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 11 bidding packages, won 11 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: CÔNG TY TNHH MỘT THÀNH VIÊN 49
- Code of capacity certificate of construction activities: 00012531
- Issuer: Sở Kế hoạch và Đầu tư Thành phố Hà Nội
- Fields:
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng, nhà công nghiệp
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình hạ tầng kỹ thuật cấp nước, thoát nước
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình giao thông đường bộ; cầu
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn thủy lợi
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình dân dụng, nhà công nghiệp
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình hạ tầng kỹ thuật (cấp nước, thoát nước),
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình giao thông đường bộ
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Package 3: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
26/06/2024 19:03
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 1: Prepare Bidding Documents, evaluate bids for equipment procurement of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
20/06/2024 14:33
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the request Repair, synchronize, supplement and upgrade workshop equipment of Factory Z49 in 2024 of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with 3 bidding package.
18/06/2024 16:49
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Providing materials to repair engineering machinery of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HỘ KINH DOANH CƠ GIỚI 262
11/06/2024 15:54
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Providing materials to repair engineering machinery of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Competitive Offer.
24/05/2024 08:42
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the request Providing materials to repair military motorbikes at Z49 Factory in the second quarter of 2024 of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with 1 bidding package.
22/05/2024 14:23
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 03: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: TECHNO CORPORATION JOINT STOCK COMPANY
20/09/2023 11:41
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Package 03: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
28/08/2023 16:36
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 02: Supervision of equipment installation of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: APCHITECH TURE CONSULTANCY AND INDUSTRIAL CONSTRUCTION JOINT STOCK COMPANY
24/08/2023 15:02
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Bidding package 01: Prepare bidding documents, evaluate bids for equipment procurement of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
24/08/2023 14:34
The data sheet has been partially hidden, to see the full information please Login or Register
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bidding package Package 3: Procurement and installation of equipment with 4 participating contractors .
05/07/2024 10:02
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Package 3: Procurement and installation of equipment in the form Open bidding .
26/06/2024 19:03
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 1: Prepare Bidding Documents, evaluate bids for equipment procurement .
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
20/06/2024 14:33
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Repair, synchronize, supplement and upgrade workshop equipment of Factory Z49 in 2024 with 3 bidding package .
18/06/2024 16:49
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Providing materials to repair engineering machinery .
- Winning bidder: HỘ KINH DOANH CƠ GIỚI 262
11/06/2024 15:54
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bidding package Providing materials to repair engineering machinery with 1 participating contractors .
05/06/2024 16:18
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Providing materials to repair engineering machinery in the form Competitive Offer .
24/05/2024 08:42
49 ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Providing materials to repair military motorbikes at Z49 Factory in the second quarter of 2024 with 1 bidding package .
22/05/2024 14:23
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 03: Procurement and installation of equipment .
- Winning bidder: TECHNO CORPORATION JOINT STOCK COMPANY
20/09/2023 11:41
49 ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bidding package Package 03: Procurement and installation of equipment with 2 participating contractors .
07/09/2023 10:07
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Package 3: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
26/06/2024 19:03
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 1: Prepare Bidding Documents, evaluate bids for equipment procurement of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
20/06/2024 14:33
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the request Repair, synchronize, supplement and upgrade workshop equipment of Factory Z49 in 2024 of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with 3 bidding package.
18/06/2024 16:49
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Providing materials to repair engineering machinery of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HỘ KINH DOANH CƠ GIỚI 262
11/06/2024 15:54
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Providing materials to repair engineering machinery of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Competitive Offer.
24/05/2024 08:42
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the request Providing materials to repair military motorbikes at Z49 Factory in the second quarter of 2024 of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with 1 bidding package.
22/05/2024 14:23
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 03: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: TECHNO CORPORATION JOINT STOCK COMPANY
20/09/2023 11:41
Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Package 03: Procurement and installation of equipment of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
28/08/2023 16:36
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 02: Supervision of equipment installation of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: APCHITECH TURE CONSULTANCY AND INDUSTRIAL CONSTRUCTION JOINT STOCK COMPANY
24/08/2023 15:02
The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Bidding package 01: Prepare bidding documents, evaluate bids for equipment procurement of the investor 49 ONE MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: HA NOI TECHNOLOGY AND ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
24/08/2023 14:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 3 of the contractor selection plan, which contains 7 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 3 Tender Notice in the 3 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 49 ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 49 ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 49 ONE MEMBER LIMITED LIABILITY COMPANY is the investor of 3 package, of which 3 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 49 ONE MEMBER LIMITED LIABILITY COMPANY is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor 49 ONE MEMBER LIMITED LIABILITY COMPANY is an investor with 7 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code