Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY as follows:
- Has relationships with 20 project owners.
- Has relationships with 216 contractor.
- Announced 11 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 91 contractor selection plans with a total of 441 bidding packages, of which 16 prequalification documents have not found the investment project.
- Has invited bids for 194 packages (with 207 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 184 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 325 packages that have not fully posted the contractor selection results. Of these 323 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.91 contractors.
- Breakdown by bidding field: Goods 7.73%, Construction 68.12%, Consultancy 22.71%, Non-consultancy 1.45%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,120,286,736,174 VND, of which the total winning bid value is: 1,072,281,296,522 VND.
- The savings rate is: 4.29%.
Data analysis results of DauThau.info software for bid solicitors CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY as follows:
- Has relationships with 216 contractor.
- The average number of contractors participating in each bidding package is: 1.91 contractors.
- Proportion of bidding fields: Goods 7.73%, Construction 68.12%, Consulting 22.71%, Non-consulting 1.45%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,120,286,736,174 VND, in which the total winning value is: 1,072,281,296,522 VND.
- The savings rate is: 4.29%.
This Bid solicitor is also an investor. The analysis results of data for the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY are as follows:
- Is the investor of 11 development investment projects.
- Is the investor of 14 contractor selection plans, of which 14 were self-published, and 0 were published by other entities.
- Is the investor of 18 Tender Notices, of which 18 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 111 bidding packages, of which 110 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 54.69% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.32% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Vĩnh Long (97), Undefined (14)
- Provinces before the merger where the contractor has participated in bidding : Trà Vinh (92), Vĩnh Long (3), Undefined (16)
- Has relationships with 27 Bid Solicitors
- Has competed against 16 contractors in 11 bidding packages, won 9 packages, lost 1 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 4 bidding packages, won 3 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 14 bidding packages with 11 roles.
- Name of construction organization: Công ty Cổ phần Tư vấn và Xây dựng Hạ tầng kỹ thuật bền vững Cửu Long
- Code of capacity certificate of construction activities: 00010100
- Issuer: Sở Kế hoạch và Đầu tư Trà Vinh
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package 05: Construction of repair and reinforcement of Ta Huu dike, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
04/07/2023 16:35
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package 05: Construction of repairing and overcoming landslides on Hau river bank to protect residents in Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
04/07/2023 16:27
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Package 05: Construction of repairing and overcoming landslides on Hau river bank to protect residents in Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Competitive Offer.
07/06/2023 08:28
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Package 05: Construction of repair and reinforcement of Ta Huu dike, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Open bidding.
07/06/2023 08:25
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the request About the plan to choose a contractor for the construction of repairing and overcoming landslides on the banks of the Hau river to protect the inhabitants of Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with 5 bidding package.
01/06/2023 08:43
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the request Regarding the approval of the plan to select a contractor to repair and strengthen the landslide at Ta Huu dyke, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with 5 bidding package.
29/05/2023 11:12
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Tender package No 05: Construction work of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
31/03/2023 17:03
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Tender package No 05: Construction work of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Competitive Offer.
17/03/2023 16:53
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package No. 11: Construction equipment of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
07/11/2022 17:16
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Making a plan Adjusting the planning of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
19/10/2022 16:00
The data sheet has been partially hidden, to see the full information please Login or Register
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package No. 66: Procurement and installation of a smart insect monitoring system for agricultural production .
- Winning bidder: RYNAN AGRIFOODS JOINT STOCK COMPANY
28/05/2025 15:07
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package No. 06: Construction of repair works 05 cremation houses in the district in 2025 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG QUỐC BÌNH
26/05/2025 14:41
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bidding package Tender package No 06: Construction of repair works 05 cremation houses in the district in 2025 with 1 participating contractors .
15/05/2025 15:16
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY publishes Tender Notice Tender package No 06: Construction of repair works 05 cremation houses in the district in 2025 in the form Competitive Offer .
08/05/2025 08:14
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bidding package Tender package No 66: Procurement and installation of a smart insect monitoring system for agricultural production with 1 participating contractors .
07/05/2025 16:28
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY publishes Tender Notice Tender package No 66: Procurement and installation of a smart insect monitoring system for agricultural production in the form Open bidding .
28/04/2025 16:18
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package 04: Consulting on making planning projects .
- Winning bidder: ARCHITECTURE AND CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY, SG 69 CO.,LTD
23/01/2025 14:31
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package No. 03: Purchase of lime, alum, soda and polymer chemicals for water quality treatment. .
- Winning bidder: CÔNG TY TNHH PHÁT THIÊN PHÚ
07/01/2025 16:17
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package No. 03: Purchase an oil-free piston air compressor with engine capacity of 7.5Kw - 10HP. .
- Winning bidder: VU ANH TRADING TECHNOLOGY CO.,LTD
02/01/2025 16:03
CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY announced the results of the bid package Package No. 18: Construction of the centralized domestic wastewater treatment plant in Chau Thanh district .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG ĐỒNG BẰNG, NGUYEN KHANG ENVIRONMENTAL TECHNOLOGY COMPANY LIMITED, CÔNG TY TNHH TƯ VẤN- THIẾT KẾ-XÂY DỰNG PHÁT TIẾN
25/12/2024 18:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package 05: Construction of repair and reinforcement of Ta Huu dike, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
04/07/2023 16:35
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package 05: Construction of repairing and overcoming landslides on Hau river bank to protect residents in Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
04/07/2023 16:27
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Package 05: Construction of repairing and overcoming landslides on Hau river bank to protect residents in Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Competitive Offer.
07/06/2023 08:28
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Package 05: Construction of repair and reinforcement of Ta Huu dike, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Open bidding.
07/06/2023 08:25
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the request About the plan to choose a contractor for the construction of repairing and overcoming landslides on the banks of the Hau river to protect the inhabitants of Vam hamlet and Tong Long dike - Bac Trang, An Quang Huu commune, Tra Cu district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with 5 bidding package.
01/06/2023 08:43
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the request Regarding the approval of the plan to select a contractor to repair and strengthen the landslide at Ta Huu dyke, Co Chien river, Long Hoa commune, Chau Thanh district of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with 5 bidding package.
29/05/2023 11:12
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Tender package No 05: Construction work of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
31/03/2023 17:03
Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted Tender Notice Tender package No 05: Construction work of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY with the form Competitive Offer.
17/03/2023 16:53
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Package No. 11: Construction equipment of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
07/11/2022 17:16
The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted the results of the bidding package Making a plan Adjusting the planning of the investor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY.
19/10/2022 16:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted 91 of the contractor selection plan, which contains 441 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted 207 Tender Notices in 194 bidding packages. Among these, 19 Tender Notices were self-invited, and 188 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has posted 184 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 184 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has a relationship with 216 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has a relationship with 117 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CUU LONG CONSTRUCTION OF SUSTAINABLE INFRASTRUCTURE DEVELOPMENT JOINT-STOCK COMPANY has a relationship with 24 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects