Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Central Hydropower Joint Stock Company as follows:
- Has relationships with 1 project owners.
- Has relationships with 244 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 376 contractor selection plans with a total of 425 bidding packages, of which 372 prequalification documents have not found the investment project.
- Has invited bids for 433 packages (with 444 tender notices), and conducted prequalification for 0 packages.
- There are 4 bidding packages with content that needs clarification.
- Announced the results of 236 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 84 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 131 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.29 contractors.
- Breakdown by bidding field: Goods 53.60%, Construction 31.31%, Consultancy 2.25%, Non-consultancy 12.61%, Mixed 0.23%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,344,064,522,537 VND, of which the total winning bid value is: 1,275,374,725,505 VND.
- The savings rate is: 5.11%.
Data analysis results of DauThau.info software for bid solicitors Central Hydropower Joint Stock Company as follows:
- Has relationships with 244 contractor.
- The average number of contractors participating in each bidding package is: 2.29 contractors.
- Proportion of bidding fields: Goods 53.60%, Construction 31.31%, Consulting 2.25%, Non-consulting 12.61%, Mixed 0.23%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,344,064,522,537 VND, in which the total winning value is: 1,275,374,725,505 VND.
- The savings rate is: 5.11%.
This Bid solicitor is also an investor. The analysis results of data for the investor Central Hydropower Joint Stock Company are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 448 contractor selection plans, of which 376 were self-published, and 72 were published by other entities.
- Is the investor of 243 Tender Notices, of which 242 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Central Hydropower Joint Stock Company publishes the plan Tender number 26/2026/PTV-ALCJ: Calibration and periodic verification of measuring instruments in 2026 for the A Luoi Hydropower Plant and the Cu Jut Solar Power Plant (round 2). with 1 bidding package .
19/08/2026 14:16
Central Hydropower Joint Stock Company publishes the plan Package No. 33/2026/TB-AL: Supply and installation of additional monitoring equipment for Dam – A Luoi Hydropower Plant with 1 bidding package .
22/07/2026 15:06
Central Hydropower Joint Stock Company publishes the plan Contractor selection plan Procurement estimate of package No. 32/2026/TB-AL: Supply of materials and equipment for renovating the domestic water supply system at the spillway of A Luoi Hydropower Plant with 1 bidding package .
17/07/2026 09:47
Central Hydropower Joint Stock Company publishes the plan Package No. 20/2026/TB-AL: Supply and installation of elevators at A Luoi Hydropower Plant with 1 bidding package .
16/07/2026 15:11
Central Hydropower Joint Stock Company publishes the plan Package No. 26/2026/PTV-ALCJ Periodic inspection and calibration of measuring equipment in 2026 of A Luoi Hydropower Plant and Cu Jut Solar Power Plant with 1 bidding package .
23/06/2026 10:00
Central Hydropower Joint Stock Company publishes the plan Package No. 27/2026/PTV-AL: Clearing the 35kV areas of the factory, Hong Ha Office, the 220kV range, distribution stations and underground cable lines, spillway power supply of A Luoi Hydropower Plant with 1 bidding package .
17/06/2026 10:13
Central Hydropower Joint Stock Company publishes the plan Package No. 04/2026/TB-AL: Procurement of backup power VTTB – A Luoi Hydropower Plant with 1 bidding package .
11/06/2026 08:05
Central Hydropower Joint Stock Company publishes the plan Package No. 11/2026/TB-CJ: Procurement of F87L optical card for feeder 171 110kV substation - Cu Jut Solar Power Plant with 1 bidding package .
10/06/2026 15:36
Central Hydropower Joint Stock Company publishes the plan Package No. 05/2026/TB-VP Equipping personal protective equipment for workers in 2026 at Central Hydropower Joint Stock Company with 1 bidding package .
05/06/2026 08:18
Central Hydropower Joint Stock Company publishes the plan Package No. 04/2026/TV-VP: Review and audit the 2026 financial statements of Central Hydropower Joint Stock Company with 1 bidding package .
04/06/2026 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
Central Hydropower Joint Stock Company publishes the plan Package No. 45/2025/XL-AL Repair and maintenance of construction items Technical infrastructure and auxiliary items Production control area of A Luoi Hydropower Plant - Item: A Co's exterior gate with 1 bidding package .
23/10/2025 08:18
Central Hydropower Joint Stock Company publishes the plan Package No. 33/2025/PTV-Al: Testing and periodic calibration of measuring devices in 2025 with 1 bidding package .
24/06/2025 15:00
Central Hydropower Joint Stock Company publishes the plan Package No. 07/2025/TV-VP: Internal audit in 2025 at Central Hydroelectric Joint Stock Company with 1 bidding package .
19/06/2025 08:52
Central Hydropower Joint Stock Company publishes the plan Package No. 27/2025/XL-Al: Maintenance and maintenance of works in 2025, A Luoi hydroelectric plant with 1 bidding package .
11/06/2025 14:52
Central Hydropower Joint Stock Company publishes the plan Package No. 32/2025/XL-AL: Construction of land barriers to protect the construction of the project, supplement the lake boundaries at A Luoi hydroelectric plant in 2025 with 1 bidding package .
06/06/2025 08:57
Central Hydropower Joint Stock Company publishes the plan Package No. 23/2025/XL-AL: Repair maintenance of works on construction of stairs, railings, ventilation rooms, iron doors of 500kva generator room of A Luoi hydroelectric plant with 1 bidding package .
05/06/2025 15:28
Central Hydropower Joint Stock Company publishes the plan Package No. 34/2025/PTV-Al: Provides CNN diving diving services and superior inspections, A Luoi hydroelectric spill tank in 2025 with 1 bidding package .
04/06/2025 13:36
Central Hydropower Joint Stock Company publishes the plan Supplying equipment and equipment for overcoming the damage of MC4 cable at Cu Jut Solar Power Plant (phase 2) with 1 bidding package .
04/06/2025 09:15
Central Hydropower Joint Stock Company publishes the plan Bidding package No. 32/2025/TB-VP shopping for car production and transportation of employees of A Luoi hydroelectric plant with 1 bidding package .
03/06/2025 13:42
Central Hydropower Joint Stock Company publishes the plan Package 12/2025/TV-VP: Performing the review and audit of financial statements in 2025 of Central Hydroelectric Joint Stock Company with 1 bidding package .
03/06/2025 09:15
The data sheet has been partially hidden, to see the full information please Login or Register
Central Hydropower Joint Stock Company publishes the plan Tender number 26/2026/PTV-ALCJ: Calibration and periodic verification of measuring instruments in 2026 for the A Luoi Hydropower Plant and the Cu Jut Solar Power Plant (round 2). with 1 bidding package .
19/08/2026 14:16
Central Hydropower Joint Stock Company publishes the plan Package No. 33/2026/TB-AL: Supply and installation of additional monitoring equipment for Dam – A Luoi Hydropower Plant with 1 bidding package .
22/07/2026 15:06
Central Hydropower Joint Stock Company publishes the plan Contractor selection plan Procurement estimate of package No. 32/2026/TB-AL: Supply of materials and equipment for renovating the domestic water supply system at the spillway of A Luoi Hydropower Plant with 1 bidding package .
17/07/2026 09:47
Central Hydropower Joint Stock Company publishes the plan Package No. 20/2026/TB-AL: Supply and installation of elevators at A Luoi Hydropower Plant with 1 bidding package .
16/07/2026 15:11
Central Hydropower Joint Stock Company publishes the plan Package No. 26/2026/PTV-ALCJ Periodic inspection and calibration of measuring equipment in 2026 of A Luoi Hydropower Plant and Cu Jut Solar Power Plant with 1 bidding package .
23/06/2026 10:00
Central Hydropower Joint Stock Company publishes the plan Package No. 27/2026/PTV-AL: Clearing the 35kV areas of the factory, Hong Ha Office, the 220kV range, distribution stations and underground cable lines, spillway power supply of A Luoi Hydropower Plant with 1 bidding package .
17/06/2026 10:13
Central Hydropower Joint Stock Company publishes the plan Package No. 04/2026/TB-AL: Procurement of backup power VTTB – A Luoi Hydropower Plant with 1 bidding package .
11/06/2026 08:05
Central Hydropower Joint Stock Company publishes the plan Package No. 11/2026/TB-CJ: Procurement of F87L optical card for feeder 171 110kV substation - Cu Jut Solar Power Plant with 1 bidding package .
10/06/2026 15:36
Central Hydropower Joint Stock Company publishes the plan Package No. 05/2026/TB-VP Equipping personal protective equipment for workers in 2026 at Central Hydropower Joint Stock Company with 1 bidding package .
05/06/2026 08:18
Central Hydropower Joint Stock Company publishes the plan Package No. 04/2026/TV-VP: Review and audit the 2026 financial statements of Central Hydropower Joint Stock Company with 1 bidding package .
04/06/2026 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Central Hydropower Joint Stock Company has posted 376 of the contractor selection plan, which contains 425 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Central Hydropower Joint Stock Company has posted 444 Tender Notices in 433 bidding packages. Among these, 379 Tender Notices were self-invited, and 65 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Central Hydropower Joint Stock Company has posted 236 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 236 package, canceled the bid 0 package (among the bidding packages above).
- There are 84 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Central Hydropower Joint Stock Company has a relationship with 244 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Central Hydropower Joint Stock Company has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Central Hydropower Joint Stock Company has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects