Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Electric Power Consulting Development Center as follows:
- Has relationships with 0 project owners.
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 2 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,640,443,000 VND, of which the total winning bid value is: 3,586,865,000 VND.
- The savings rate is: 1.47%.
Data analysis results of DauThau.info software for bid solicitors Electric Power Consulting Development Center as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,640,443,000 VND, in which the total winning value is: 3,586,865,000 VND.
- The savings rate is: 1.47%.
You need to Login or Sign up to view all informations.
- Participated in 638 bidding packages, of which 349 were won, 270 were lost, 3 are pending results, and 16 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 8.77% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 79.73% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (510), Đồng Nai (12), Khánh Hòa (8), Tây Ninh (7), Cà Mau (3), Cần Thơ (3), Lâm Đồng (2), Hải Phòng (1), An Giang (1), Vĩnh Long (1), Undefined (90)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (431), Đồng Nai (10), Khánh Hòa (5), Long An (5), Bình Dương (3), Hậu Giang (3), Bạc Liêu (2), Ninh Thuận (2), Tây Ninh (2), Bình Phước (2), Bà Rịa - Vũng Tàu (1), Hải Phòng (1), Vĩnh Long (1), Undefined (170)
- Has relationships with 75 Bid Solicitors
- Has relationships with 56 Bid Investors
- Has competed against 105 contractors in 450 bidding packages, won 170 packages, lost 270 packages, 3 are pending results, and 7 were canceled.
- Has collaborated with 12 contractors in 15 bidding packages, won 6 packages, lost 9 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 316 bidding packages with 62 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Electric Power Consulting Development Center announced the results of the bid package Construction and relocation of high voltage pole No. 33 110kV line (172 Long An - 171 Tan Huong) .
- Winning bidder: IEC ELECTRIC POWER SERVICE CORPORATION
12/06/2024 16:57
Electric Power Consulting Development Center announced the results of the bidding package Construction and relocation of high voltage pole No. 33 110kV line (172 Long An - 171 Tan Huong) with 2 participating contractors .
17/11/2022 11:53
Electric Power Consulting Development Center publishes Tender Notice Construction and relocation of high voltage pole No. 33 110kV line (172 Long An - 171 Tan Huong) in the form Open bidding .
05/11/2022 12:22
Electric Power Consulting Development Center publishes the plan Project: Renovating and upgrading SCADA-RTU system of 110kV South Saigon 2 and Linh Trung 2 substations (equipped with compartment level controller and connection port to the second Control Center of HCMC Power Center) .HCM) with 1 bidding package .
03/11/2022 13:20
Electric Power Consulting Development Center publishes the plan Project: Renovating and upgrading SCADA system (RTU) for converting IEC 60870 -5-101 channel connection to IEC 60870-5-104 for A2 and opening connection port according to IEC 60870-5- 104 to the second Control Center of the HCMC Power Center with 1 bidding package .
02/11/2022 18:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Electric Power Consulting Development Center has posted 2 of the contractor selection plan, which contains 2 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Electric Power Consulting Development Center has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Electric Power Consulting Development Center has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Electric Power Consulting Development Center has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Electric Power Consulting Development Center has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects