Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Electricity of Vietnam as follows:
- Has relationships with 1 project owners.
- Has relationships with 89 contractor.
- Announced 188 investment development project, of which 12 projects have not yet announced the prequalification documents.
- Announced 148 contractor selection plans with a total of 272 bidding packages, of which 84 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 130 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 73 packages that have not fully posted the contractor selection results. Of these 66 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 84,566,257,402 VND, of which the total winning bid value is: 79,302,211,185 VND.
- The savings rate is: 6.22%.
Data analysis results of DauThau.info software for bid solicitors Electricity of Vietnam as follows:
- Has relationships with 89 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 84,566,257,402 VND, in which the total winning value is: 79,302,211,185 VND.
- The savings rate is: 6.22%.
This Bid solicitor is also an investor. The analysis results of data for the investor Electricity of Vietnam are as follows:
- Is the investor of 188 development investment projects.
- Is the investor of 462 contractor selection plans, of which 148 were self-published, and 314 were published by other entities.
- Is the investor of 241 Tender Notices, of which 0 were self-invited, and 241 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Electricity of Vietnam publishes the plan Procurement of Tet calendars for 2026 for staff of Power Project Management Board 2 with 1 bidding package .
06/01/2026 16:27
Electricity of Vietnam publishes the plan Contractor selection plan for package No. 03-SS4TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 4 Hydropower Plant Expansion Project with 1 bidding package .
31/12/2025 17:47
Electricity of Vietnam publishes the plan Procurement of Commemorative badges for the development of Vietnam Electricity and Grassroots Emulation Soldier Badges with 1 bidding package .
31/12/2025 17:00
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Tuyen Quang Hydroelectric Plant Expansion Project with 1 bidding package .
31/12/2025 14:48
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line with 2 bidding package .
31/12/2025 14:35
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Quang Tri 2 500kV Switching Station Project and connecting 500kV lines with 2 bidding package .
31/12/2025 14:35
Electricity of Vietnam publishes the plan Repairing some items of the air conditioning and UPS systems of EVN Building in 2025 with 1 bidding package .
31/12/2025 10:53
Electricity of Vietnam publishes the plan Contractor selection plan (phase 2) of Ban Chat Hydropower Plant expansion project with 1 bidding package .
31/12/2025 10:41
Electricity of Vietnam publishes the plan Major repair of 02 cars to serve work for Vietnam Electricity Corporation in 2025 with 1 bidding package .
29/12/2025 15:32
Electricity of Vietnam publishes the plan Plan for selecting contractors for bidding packages belonging to the operating costs of production preparation work of Quang Trach I Thermal Power Plant Project with 2 bidding package .
25/12/2025 11:26
The data sheet has been partially hidden, to see the full information please Login or Register
Electricity of Vietnam publishes the plan Regarding approval of adjusting the contractor selection plan for a number of bidding packages under the Quang Trach I Thermal Power Plant project with 3 bidding package .
21/10/2025 19:44
Electricity of Vietnam publishes the plan Contractor selection plan (phase 12) - Quang Trach I Thermal Power Plant Project with 14 bidding package .
04/09/2025 16:05
Electricity of Vietnam publishes the plan Plan for contractor selection Consulting package for examining the pre -feasibility study report to adjust Ninh Thuan Nuclear Electric Project 1 with 1 bidding package .
25/07/2025 08:26
Electricity of Vietnam publishes the plan Business data analysis training program with 1 bidding package .
10/07/2025 16:42
Electricity of Vietnam publishes the plan Contractor selection plan (phase 1) - Project on renovation and upgrade of emissions of Thai Binh Thermal Power Plant with 2 bidding package .
30/06/2025 12:11
Electricity of Vietnam publishes the plan Shopping for gifts for the 5th EVN patriotic emulation with 1 bidding package .
30/06/2025 10:51
Electricity of Vietnam publishes the plan Contractor selection plan (phase 12) - Quang Trach I Thermal Power Plant Project with 14 bidding package .
27/06/2025 11:23
Electricity of Vietnam publishes the plan Buy gifts for the Fourth Party Committee of the Vietnam Electricity Group, term 2025-2030 with 1 bidding package .
25/06/2025 16:57
Electricity of Vietnam publishes the plan Program of practical programming and application languages with 1 bidding package .
24/06/2025 11:08
Electricity of Vietnam publishes the plan Equipped with uniforms for the EVN Party Congress with 2 bidding package .
23/06/2025 13:26
The data sheet has been partially hidden, to see the full information please Login or Register
Electricity of Vietnam publishes the plan Procurement of Tet calendars for 2026 for staff of Power Project Management Board 2 with 1 bidding package .
06/01/2026 16:27
Electricity of Vietnam publishes the plan Contractor selection plan for package No. 03-SS4TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 4 Hydropower Plant Expansion Project with 1 bidding package .
31/12/2025 17:47
Electricity of Vietnam publishes the plan Procurement of Commemorative badges for the development of Vietnam Electricity and Grassroots Emulation Soldier Badges with 1 bidding package .
31/12/2025 17:00
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Tuyen Quang Hydroelectric Plant Expansion Project with 1 bidding package .
31/12/2025 14:48
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line with 2 bidding package .
31/12/2025 14:35
Electricity of Vietnam publishes the plan Contractor selection plan (Phase 2) - Quang Tri 2 500kV Switching Station Project and connecting 500kV lines with 2 bidding package .
31/12/2025 14:35
Electricity of Vietnam publishes the plan Repairing some items of the air conditioning and UPS systems of EVN Building in 2025 with 1 bidding package .
31/12/2025 10:53
Electricity of Vietnam publishes the plan Contractor selection plan (phase 2) of Ban Chat Hydropower Plant expansion project with 1 bidding package .
31/12/2025 10:41
Electricity of Vietnam publishes the plan Major repair of 02 cars to serve work for Vietnam Electricity Corporation in 2025 with 1 bidding package .
29/12/2025 15:32
Electricity of Vietnam publishes the plan Plan for selecting contractors for bidding packages belonging to the operating costs of production preparation work of Quang Trach I Thermal Power Plant Project with 2 bidding package .
25/12/2025 11:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Electricity of Vietnam has posted 148 of the contractor selection plan, which contains 272 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Electricity of Vietnam has posted 130 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 130 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Electricity of Vietnam has a relationship with 89 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Electricity of Vietnam has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects