Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Hue Monuments Conservation Centre as follows:
- Has relationships with 1 project owners.
- Has relationships with 194 contractor.
- Announced 14 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 699 contractor selection plans with a total of 1080 bidding packages, of which 695 prequalification documents have not found the investment project.
- Has invited bids for 33 packages (with 33 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 931 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 902 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 128 packages that have not fully posted the contractor selection results. Of these 126 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.14 contractors.
- Breakdown by bidding field: Goods 21.21%, Construction 72.73%, Consultancy 3.03%, Non-consultancy 3.03%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 78,860,915,119 VND, of which the total winning bid value is: 77,287,333,494 VND.
- The savings rate is: 2.00%.
Data analysis results of DauThau.info software for bid solicitors Hue Monuments Conservation Centre as follows:
- Has relationships with 194 contractor.
- The average number of contractors participating in each bidding package is: 1.14 contractors.
- Proportion of bidding fields: Goods 21.21%, Construction 72.73%, Consulting 3.03%, Non-consulting 3.03%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 78,860,915,119 VND, in which the total winning value is: 77,287,333,494 VND.
- The savings rate is: 2.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hue Monuments Conservation Centre are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 826 contractor selection plans, of which 609 were self-published, and 217 were published by other entities.
- Is the investor of 173 Tender Notices, of which 33 were self-invited, and 140 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 99.03% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.12% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Huế (3)
- Provinces before the merger where the contractor has participated in bidding : Huế (3)
- Has relationships with 1 Bid Solicitors
- Has relationships with 3 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 3 bidding packages with 4 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hue Monuments Conservation Centre publishes the plan Care and cultivation of ancient trees at historical sites; includes activities such as fertilizing, pruning, and root maintenance. with 1 bidding package .
26/08/2026 16:47
Hue Monuments Conservation Centre announced the results of the bid package All pest control and prevention work in the Tam Toa area. .
- Winning bidder: Công ty TNHH MTV Phòng Chống Mối Đoàn Vũ Gia
26/08/2026 10:10
Hue Monuments Conservation Centre announced the results of the bid package All work involved in repairing the damaged tile roof of the connecting corridors to the ancient artifact storage area. .
- Winning bidder: CÔNG TY TNHH MTV THƯƠNG MẠI DỊCH VỤ VÀ XÂY DỰNG NGỌC TÍN
25/08/2026 15:16
Hue Monuments Conservation Centre announced the results of the bid package The entire construction and repair work for the ancient artifact exhibition hall. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN QUANG ANH
24/08/2026 17:36
Hue Monuments Conservation Centre announced the results of the bid package Repair and renovation of roof structures at the Co Ha garden area. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
24/08/2026 17:28
Hue Monuments Conservation Centre announced the results of the bid package Removal of undergrowth, clearing the tree trunks, and site preparation for reforestation at the King Gia Long Mausoleum. .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN CHÍ TÂM
24/08/2026 17:25
Hue Monuments Conservation Centre announced the results of the bid package Installation of an automated irrigation system for the rose garden at Dien Kien Trung Park. .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ CÔNG NGHỆ HOME PLUS
24/08/2026 16:02
Hue Monuments Conservation Centre announced the results of the bid package The entire construction and repair work for upgrading drainage covers, seating, and wooden bridges in the historical areas. .
- Winning bidder: công ty TNHH TM và DV minh Thảo Đan
24/08/2026 16:00
Hue Monuments Conservation Centre announced the results of the bid package The whole construction part .
- Winning bidder: EVERGREEN INVESTMENT AND CONSTRUCTION LIMITED LIABILITY COMPANY
24/08/2026 15:55
Hue Monuments Conservation Centre announced the results of the bid package Provide supplementary cleaning and maintenance services for restrooms in the Tam Toa area. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
24/08/2026 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
Hue Monuments Conservation Centre announced the results of the bid package Construction of ancient trees support .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN QUANG ANH
10/07/2025 16:32
Hue Monuments Conservation Centre announced the results of the bid package Eyer repair of King Minh Mang - Hue Nam - Western Dien Dien Dai .
- Winning bidder: CÔNG TY TNHH MTV THƯƠNG MẠI DỊCH VỤ VÀ XÂY DỰNG NGỌC TÍN
01/07/2025 14:53
Hue Monuments Conservation Centre announced the results of the bid package Providing shipping services to Hue City Mission attended the 47th meeting of the UNESCO World Heritage Committee in Paris, France Republic; Combining a number of other activities in the Kingdom of Belgium and the Italian Republic. .
- Winning bidder: VIETRAVEL HUE ONE MEMBER LIMITED COMPANY
01/07/2025 14:49
Hue Monuments Conservation Centre publishes the plan Providing shipping services to Hue City Mission attended the 47th meeting of the UNESCO World Heritage Committee in Paris, France Republic; Combining a number of other activities in the Kingdom of Belgium and the Italian Republic with 1 bidding package .
30/06/2025 15:55
Hue Monuments Conservation Centre publishes the plan Planted 3 -leaf grass and planted some trees and ornamental plants to create landscapes in the area with 1 bidding package .
25/06/2025 11:05
Hue Monuments Conservation Centre announced the results of the bid package The whole construction part .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
25/06/2025 11:02
Hue Monuments Conservation Centre publishes the plan Eyer repair of King Minh Mang - Hue Nam - Western Dien Dien Dai with 1 bidding package .
25/06/2025 10:47
Hue Monuments Conservation Centre announced the results of the bid package Rent the sound and light system to serve the closing program of the Hue Community Ao Dai 2025 .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN DỊCH VỤ VÀ THƯƠNG MẠI HUY CƯỜNG
23/06/2025 16:27
Hue Monuments Conservation Centre publishes the plan Rent the sound and light system to serve the closing program of the Hue Community Ao Dai 2025 with 1 bidding package .
23/06/2025 16:18
Hue Monuments Conservation Centre announced the results of the bid package Replace battery battery for two electric cars 75HC-00033 and 75HC-00098 .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN CỬU PHƯỚC LONG
19/06/2025 10:01
The data sheet has been partially hidden, to see the full information please Login or Register
Hue Monuments Conservation Centre publishes the plan Care and cultivation of ancient trees at historical sites; includes activities such as fertilizing, pruning, and root maintenance. with 1 bidding package .
26/08/2026 16:47
Hue Monuments Conservation Centre announced the results of the bid package All pest control and prevention work in the Tam Toa area. .
- Winning bidder: Công ty TNHH MTV Phòng Chống Mối Đoàn Vũ Gia
26/08/2026 10:10
Hue Monuments Conservation Centre announced the results of the bid package All work involved in repairing the damaged tile roof of the connecting corridors to the ancient artifact storage area. .
- Winning bidder: CÔNG TY TNHH MTV THƯƠNG MẠI DỊCH VỤ VÀ XÂY DỰNG NGỌC TÍN
25/08/2026 15:16
Hue Monuments Conservation Centre announced the results of the bid package The entire construction and repair work for the ancient artifact exhibition hall. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN QUANG ANH
24/08/2026 17:36
Hue Monuments Conservation Centre announced the results of the bid package Repair and renovation of roof structures at the Co Ha garden area. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
24/08/2026 17:28
Hue Monuments Conservation Centre announced the results of the bid package Removal of undergrowth, clearing the tree trunks, and site preparation for reforestation at the King Gia Long Mausoleum. .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN CHÍ TÂM
24/08/2026 17:25
Hue Monuments Conservation Centre announced the results of the bid package Installation of an automated irrigation system for the rose garden at Dien Kien Trung Park. .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ CÔNG NGHỆ HOME PLUS
24/08/2026 16:02
Hue Monuments Conservation Centre announced the results of the bid package The entire construction and repair work for upgrading drainage covers, seating, and wooden bridges in the historical areas. .
- Winning bidder: công ty TNHH TM và DV minh Thảo Đan
24/08/2026 16:00
Hue Monuments Conservation Centre announced the results of the bid package The whole construction part .
- Winning bidder: EVERGREEN INVESTMENT AND CONSTRUCTION LIMITED LIABILITY COMPANY
24/08/2026 15:55
Hue Monuments Conservation Centre announced the results of the bid package Provide supplementary cleaning and maintenance services for restrooms in the Tam Toa area. .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG BẢO
24/08/2026 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hue Monuments Conservation Centre has posted 699 of the contractor selection plan, which contains 1080 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hue Monuments Conservation Centre has posted 33 Tender Notices in 33 bidding packages. Among these, 33 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hue Monuments Conservation Centre has posted 931 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 931 package, canceled the bid 0 package (among the bidding packages above).
- There are 902 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hue Monuments Conservation Centre has a relationship with 194 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hue Monuments Conservation Centre has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hue Monuments Conservation Centre has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects