Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Market Management Board No. 3 as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 7 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 92,502,000 VND, of which the total winning bid value is: 92,502,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Market Management Board No. 3 as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 92,502,000 VND, in which the total winning value is: 92,502,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Market Management Board No. 3 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 1 contractor selection plans, of which 1 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Market Management Board No. 3 has posted the results of the bidding package Auditing and finalizing completed projects of the investor Market Management Board No. 3.
- Winning bidder: AADL AUDITING COMPANY LIMITED
05/07/2024 11:49
The Bid solicitor Market Management Board No. 3 has posted the request Project contractor selection plan: Renovating and repairing Chau Long market of the investor Market Management Board No. 3 with 7 bidding package.
20/06/2024 11:26
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Tender package for construction and equipment installation of the investor Market Management Board No. 3.
- Winning bidder: AN VIET INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
19/05/2023 10:21
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Prepare bidding documents, evaluate construction and equipment bids of the investor Market Management Board No. 3.
- Winning bidder: HA NOI AIC JOINT STOCK COMPANY
04/05/2023 11:37
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Project management phase of investment implementation of the investor Market Management Board No. 3.
- Winning bidder: SAO VANG CONSTRUCTION CONSULTING COMPANY LIMITED
04/05/2023 11:22
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Evaluation of Bidding Documents and Construction Code of Construction and Equipment of the investor Market Management Board No. 3.
- Winning bidder: CIC-NG HA NOI JOINT STOCK COMPANY
04/05/2023 11:13
The data sheet has been partially hidden, to see the full information please Login or Register
Market Management Board No. 3 announced the results of the bid package Auditing and finalizing completed projects .
- Winning bidder: AADL AUDITING COMPANY LIMITED
05/07/2024 11:49
Market Management Board No. 3 publishes the plan Project contractor selection plan: Renovating and repairing Chau Long market with 7 bidding package .
20/06/2024 11:26
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Market Management Board No. 3 has posted the results of the bidding package Auditing and finalizing completed projects of the investor Market Management Board No. 3.
- Winning bidder: AADL AUDITING COMPANY LIMITED
05/07/2024 11:49
The Bid solicitor Market Management Board No. 3 has posted the request Project contractor selection plan: Renovating and repairing Chau Long market of the investor Market Management Board No. 3 with 7 bidding package.
20/06/2024 11:26
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Tender package for construction and equipment installation of the investor Market Management Board No. 3.
- Winning bidder: AN VIET INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
19/05/2023 10:21
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Prepare bidding documents, evaluate construction and equipment bids of the investor Market Management Board No. 3.
- Winning bidder: HA NOI AIC JOINT STOCK COMPANY
04/05/2023 11:37
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Project management phase of investment implementation of the investor Market Management Board No. 3.
- Winning bidder: SAO VANG CONSTRUCTION CONSULTING COMPANY LIMITED
04/05/2023 11:22
The Bid solicitor HA NOI AIC JOINT STOCK COMPANY has posted the results of the bidding package Evaluation of Bidding Documents and Construction Code of Construction and Equipment of the investor Market Management Board No. 3.
- Winning bidder: CIC-NG HA NOI JOINT STOCK COMPANY
04/05/2023 11:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Market Management Board No. 3 has posted 1 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor Market Management Board No. 3 has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Market Management Board No. 3 has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Market Management Board No. 3 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects