Data analysis results of DauThau.info software for bid solicitors NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 1 project owners.
- Has relationships with 372 contractor.
- Announced 344 investment development project, of which 27 projects have not yet announced the prequalification documents.
- Announced 641 contractor selection plans with a total of 721 bidding packages, of which 326 prequalification documents have not found the investment project.
- Has invited bids for 604 packages (with 706 tender notices), and conducted prequalification for 0 packages.
- There are 20 bidding packages with content that needs clarification.
- Announced the results of 659 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 107 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 74 packages that have not fully posted the contractor selection results. Of these 67 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.44 contractors.
- Breakdown by bidding field: Goods 24.08%, Construction 54.82%, Consultancy 13.31%, Non-consultancy 7.79%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,499,143,895,943 VND, of which the total winning bid value is: 2,342,734,378,323 VND.
- The savings rate is: 6.26%.
Data analysis results of DauThau.info software for bid solicitors NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 372 contractor.
- The average number of contractors participating in each bidding package is: 1.44 contractors.
- Proportion of bidding fields: Goods 24.08%, Construction 54.82%, Consulting 13.31%, Non-consulting 7.79%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,499,143,895,943 VND, in which the total winning value is: 2,342,734,378,323 VND.
- The savings rate is: 6.26%.
This Bid solicitor is also an investor. The analysis results of data for the investor NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION are as follows:
- Is the investor of 344 development investment projects.
- Is the investor of 803 contractor selection plans, of which 515 were self-published, and 288 were published by other entities.
- Is the investor of 937 Tender Notices, of which 704 were self-invited, and 233 were invited by other entities.
- Name of construction organization: CÔNG TY ĐIỆN LỰC NGHỆ AN - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
- Code of capacity certificate of construction activities: 00075898
- Issuer:
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: đường dây và trạm biến áp
⚬ Thi công xây dựng công trình: đường dây và trạm biến áp
⚬ Tư vấn giám sát thi công xây dựng công trình: đường dây và trạm biến áp
⚬ Tư vấn quản lý dự án đầu tư xây dựng: đường dây và trạm biến áp
⚬ Tư vấn quản lý dự án đầu tư xây dựng: Đường dây và trạm biến áp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of items Repairing Irrigation Substations, Rao Gang Pump Substation, Ru Ngoc Pump Substation managed by Thanh Chuong Construction Management Team; Repairing Vo Liet NR from column 95 to column 160 of line 374E15.11 managed by Thanh Chuong Management Team; Repairing 0.4kV transmission lines behind Nghi Lam substations 4, 7, 10, 12; Substation No. 1 Nghi Phuong 2 is managed by the Nghi Loc Land Management Team; Repairing 0.4kV transmission lines behind Nghi Van 1 and 10 substations; Quan Hanh 5; Nghi Xa 7.8 is managed by Nghi Loc Management Team; Repair of 0.4kV transmission lines behind Hop Thanh, Thach Tien, Thach Ngan 1, Tong Tien, Thach Ngan 2, 4, 2/9 substations Bong Khe, Bong Khe, Ban To, Ban Xieng, Don Phuc 2, 6, 7, Khe Ran, Thanh Nam, Town 4 managed by Con Cuong Substation Management Team; Repairing branches of Xieng My, Vang Lin, Ban Tat, Dinh Tai, Ban Phay, Cha Hia, Trung Thang belonging to route 375E15.14, managed by the Tuong Duong Management Team; Repair of 35kV transmission lines of Binh Chuan, Tong Tien, Chom Muong transmission lines under transmission line 375E15.48 and Tam Son transmission lines 1, 2, 3 under transmission transmission line 377E15.48 and Ban Dinh transmission lines under transmission transmission line 371E15.48 and Tam Son 1 substation managed by the Con Cuong Management Team in the form Open bidding .
06/01/2026 15:15
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of items Repairing Irrigation Substations, Rao Gang Pump Substation, Ru Ngoc Pump Substation managed by Thanh Chuong Construction Management Team; Repairing Vo Liet NR from column 95 to column 160 of line 374E15.11 managed by Thanh Chuong Management Team; Repairing 0.4kV transmission lines behind Nghi Lam substations 4, 7, 10, 12; Substation No. 1 Nghi Phuong 2 is managed by the Nghi Loc Land Management Team; Repairing 0.4kV transmission lines behind Nghi Van 1 and 10 substations; Quan Hanh 5; Nghi Xa 7.8 is managed by Nghi Loc Management Team; Repair of 0.4kV transmission lines behind Hop Thanh, Thach Tien, Thach Ngan 1, Tong Tien, Thach Ngan 2, 4, 2/9 substations Bong Khe, Bong Khe, Ban To, Ban Xieng, Don Phuc 2, 6, 7, Khe Ran, Thanh Nam, Town 4 managed by Con Cuong Substation Management Team; Repairing branches of Xieng My, Vang Lin, Ban Tat, Dinh Tai, Ban Phay, Cha Hia, Trung Thang belonging to route 375E15.14, managed by the Tuong Duong Management Team; Repair of 35kV transmission lines of Binh Chuan, Tong Tien, Chom Muong transmission lines under transmission line 375E15.48 and Tam Son transmission lines 1, 2, 3 under transmission transmission line 377E15.48 and Ban Dinh transmission lines under transmission transmission line 371E15.48 and Tam Son 1 substation managed by the Con Cuong Management Team in the form Open bidding .
06/01/2026 09:40
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of 35kV transmission line repair items from column 04 NR of TBA 1 Thanh Yen to Substation 1 Thanh Yen, from column 09 NR of Substation 1 Thanh Yen to Yen Binh substation, from column 03 NR of Yen Binh substation to Yen Trung substation of transmission line 375E15.15 managed by Thanh Chuong Electricity Transmission Management Team; Repairing the 0.4kV transmission line behind substations 7 Nam Xuan and 2.6 Thi Tran managed by the Nam Dan Electricity Management Team; Repair of 0.4KV transmission line behind Substation No. 8 Nam Xuan managed by Nam Dan Electricity Management Team; Repairing substations No. 1, 2, 3 Cao Son and No. 1, 2 Lang Son are managed by the Anh Son VPD Management Team; Repairing NR Anh Son Town, NR TBA No. 01 Town and NR No. 01 Town, NR Thach Son 1, 2, 3 Dz 375E15.53 belonging to Anh Son Management Team in the form Open bidding .
06/01/2026 09:39
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of repair items for line 371E15-52 behind Dao 53 Do Thanh from column 51 to Tan Thanh 2 substation and Duc Thanh 4 forest managed by the Yen Thanh Construction Management Team; Repairing Duc Thanh 1, 2, Do Thanh 1 substations; Nam Thanh 1 is managed by the Yen Thanh Land Management Team; Repairing Substations Hong Thanh 1, Phu Thanh 1, Kim Thanh 1, Quang Thanh 2 managed by the Yen Thanh Construction Management Team; Repairing 0.4kV transmission line behind Phu Thanh 4, 6 substations; Do Thanh 6, 8, 12, 14 are managed by the Yen Thanh Land Management Team in the form Open bidding .
06/01/2026 09:39
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 01: Consulting on surveying, designing and preparing the Technical and Technical Report under the Project: Improving the reliability of 35kV medium voltage power grid managed by the Anh Son Electricity Management Team according to the Multiple division - Multiple connection plan in 2026 .
- Winning bidder: NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION
06/01/2026 08:52
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Procurement of materials for production in the first quarter of 2026 in the form Open bidding .
05/01/2026 14:09
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes the plan Procurement of materials for production in the first quarter of 2026 with 1 bidding package .
05/01/2026 09:26
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes the plan KHLCNT Repair substation branch No. 2, 3, 4, 5 Hung Linh, main shaft from column 22 to column 55 and Pump branch No. 10 Line 377E15.1 managed by Hung Nguyen Management Team; Repair of Substations No. 1 Tan Nhuong, No. 1 Hung Khanh, No. 1 Hung Linh, No. 1, 2 Nam Cat managed by Hung Nguyen Management Team; Repairing 0.4kV transmission line behind Substations No. 1 Hung Khanh, No. 1, 2, 3 Hung Phuc managed by Hung Nguyen Electricity Management Team; Repair of 0.4kV transmission line behind Hung Loc 1, Ha Huy Tap 7, Nghi Phu 7, Nghi Phu 1, Hung Manh Tien 2, Hoa Tien 2, Nghi Phu 7, Hung Dong Cooperative, Hung Hoa 7 and Phong Khanh substations managed by Vinh Electricity Management Team; Repairing the 0.4kV transmission line behind the Substations Unit 654, Nghi An 3, 6, 6A, 14, 9, 4A, 2, 2A, 16, 5 managed by the Vinh Power Station Management Team; Repairing 0.4kV transmission lines behind Hai Giang 3 substations; Nghi Khanh 1,2,3,6,7,8,10,11 are managed by Cua Lo Management Team; Repairing 0.4kV transmission lines behind Nghi Thai 6 substations; 12; Nghi Thach 1,4,5,7 are managed by Cua Lo Management Team; Main shaft repair of line 471+473E15.8, Thang Long NR, Truyen Transmission, Hon Ngu managed by Cua Lo Management Team; Repairing substations Xuan Tinh, Xuan Tan, Xuan Giang, Yen Thinh, Xuan Phuc, VT79 of the furnace door QLDLKV team; Repairing Nghi Khanh 2 substations; Nghi Thach 2; Nghi Huong 2; Nghi Tan 1 belongs to the Cua Oven QLDLKV team with 1 bidding package .
31/12/2025 10:38
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of repair items for line 373E15.56 from columns 108 to 154 main shaft; Nghi Thinh NR 5,7,9 DZ 478E15.8; NR Nghi Van 4 DZ 473E15.56 belongs to the Nghi Loc QLDLKV Team; Repairing the 0.4kV transmission line behind Nghi Quang 2, 4, and 7 substations managed by the Nghi Loc Power Generation Management Team; Repairing 0.4kV transmission lines behind Hung Tay 7.13 substations; Nghi Yen 2 and Nghi Trung 19 belong to the Nghi Loc QLDLKV Team; Repairing the 0.4kV transmission line behind Lien Thanh substations 5,6,7,8,9,10 managed by the Yen Thanh Power Station Management Team; Repairing 0.4kV transmission lines behind DC substations No. 2, 3 Thi Tran, Minh Chua, Tho Hop 6, Chau Loc 2, Chau Loc 2 DC, Lien Hop 2 managed by Quy Hop Power Station Management Team; Repairing Substations Chau Hong 2, Chau Ly 2, Tam Hop 3, Lien Hop 1, C6 Farm 3/2 managed by the Quy Hop Management Team; Repair of main shaft of line 373E15.3 from column 01 to column 15 managed by Quy Hop Management Team in the form Open bidding .
31/12/2025 10:30
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 01: Consulting on surveying, designing and preparing the Technical and Technical Report under the project Improving the reliability of 35kV medium voltage power grid power supply managed by Thanh Chuong Construction Management Team according to the Multiple division - Multiple connection plan in 2026 .
- Winning bidder: NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION
30/12/2025 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Power shopping for Nghe An high -voltage grid enterprises for production in 2025 .
- Winning bidder: CÔNG TY TNHH KINH DOANH THƯƠNG MẠI VÀ THIẾT BỊ VĂN PHÒNG VT VIỆT NAM
12/11/2025 09:01
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Shopping tools and tools to prepare the production of Line Projects and 110kV Quy Chau TBA, Nghe An Province .
- Winning bidder: CÔNG TY TNHH VINP
12/11/2025 09:00
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Shopping tools and tools to prepare the production of the project and the 110kV Nghi Loc TBA and Nghe An province .
- Winning bidder: CÔNG TY TNHH MERCURY ELECTRIK VIỆT NAM
12/11/2025 08:59
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package No. 01: Procurement of tools, tools, personal protection vehicles, electric safety signs in 2025 .
- Winning bidder: NHAT MINH INVESTMENT EXPORT IMPORT AND TECHNICAL SERVICES JOINT STOCK COMPANY, THANH CONG TECHNOLOGY ENGINEERING COMPANY LIMITED
14/08/2025 10:43
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 02: Protection equipment for employees in 2025 .
- Winning bidder: HYUNDAI ENTEC VIET NAM JOINT STOCK COMPANY
07/08/2025 15:34
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Bidding package: Construction of 0.4KV Ceremony after the 2.3 XN Tea Tea is managed by Thanh Chuong Electricity; Repair 0.4KV after the 3 -year -old and DC Lam Phu TBA managed by Thanh Chuong Electricity; Repair of 0.4KV Dz after the TBA members of 5; 7; 8; 9 managed by Yen Thanh Electricity Managed by Yen Thanh Electricity .
- Winning bidder: Công ty cổ phần xây dựng VHB Nghệ An
06/08/2025 16:55
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 05: Experimental and adjustment expenses under the construction and renovation project
Power grid capacity in Vinh city in Nghe An province in 2026 .
- Winning bidder: CÔNG TY DỊCH VỤ ĐIỆN LỰC MIỀN BẮC - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
06/08/2025 08:35
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 05: Experiment expenses, project adjustment: Building and improving the capacity of power grid operation in Nghi Loc district in Nghe An province in 2026 .
- Winning bidder: CÔNG TY DỊCH VỤ ĐIỆN LỰC MIỀN BẮC - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
06/08/2025 08:28
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Bidding package: Construction of 0.4KV DZ repair items after Luu Son TBA 1,2,4,5,6, Luu Son NMX is managed by Do Luong Electricity; Repairing 0.4KV after the Southern TBA 1; 2; 4; 5; 6; 8; 9 managed by Yen Thanh Electricity; Repair 0.4KV after the 4.6 Thanh Nho TBA managed by Thanh Chuong Electricity .
- Winning bidder: CÔNG TY CP THÁI ĐẠI DƯƠNG
31/07/2025 15:50
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 05: Experiment expenses, calibration of construction projects, renovating and improving the capacity of power grid operation in Dien Chau district in Nghe An province in 2026 .
- Winning bidder: CÔNG TY DỊCH VỤ ĐIỆN LỰC MIỀN BẮC - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
30/07/2025 07:16
The data sheet has been partially hidden, to see the full information please Login or Register
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of items Repairing Irrigation Substations, Rao Gang Pump Substation, Ru Ngoc Pump Substation managed by Thanh Chuong Construction Management Team; Repairing Vo Liet NR from column 95 to column 160 of line 374E15.11 managed by Thanh Chuong Management Team; Repairing 0.4kV transmission lines behind Nghi Lam substations 4, 7, 10, 12; Substation No. 1 Nghi Phuong 2 is managed by the Nghi Loc Land Management Team; Repairing 0.4kV transmission lines behind Nghi Van 1 and 10 substations; Quan Hanh 5; Nghi Xa 7.8 is managed by Nghi Loc Management Team; Repair of 0.4kV transmission lines behind Hop Thanh, Thach Tien, Thach Ngan 1, Tong Tien, Thach Ngan 2, 4, 2/9 substations Bong Khe, Bong Khe, Ban To, Ban Xieng, Don Phuc 2, 6, 7, Khe Ran, Thanh Nam, Town 4 managed by Con Cuong Substation Management Team; Repairing branches of Xieng My, Vang Lin, Ban Tat, Dinh Tai, Ban Phay, Cha Hia, Trung Thang belonging to route 375E15.14, managed by the Tuong Duong Management Team; Repair of 35kV transmission lines of Binh Chuan, Tong Tien, Chom Muong transmission lines under transmission line 375E15.48 and Tam Son transmission lines 1, 2, 3 under transmission transmission line 377E15.48 and Ban Dinh transmission lines under transmission transmission line 371E15.48 and Tam Son 1 substation managed by the Con Cuong Management Team in the form Open bidding .
06/01/2026 15:15
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of items Repairing Irrigation Substations, Rao Gang Pump Substation, Ru Ngoc Pump Substation managed by Thanh Chuong Construction Management Team; Repairing Vo Liet NR from column 95 to column 160 of line 374E15.11 managed by Thanh Chuong Management Team; Repairing 0.4kV transmission lines behind Nghi Lam substations 4, 7, 10, 12; Substation No. 1 Nghi Phuong 2 is managed by the Nghi Loc Land Management Team; Repairing 0.4kV transmission lines behind Nghi Van 1 and 10 substations; Quan Hanh 5; Nghi Xa 7.8 is managed by Nghi Loc Management Team; Repair of 0.4kV transmission lines behind Hop Thanh, Thach Tien, Thach Ngan 1, Tong Tien, Thach Ngan 2, 4, 2/9 substations Bong Khe, Bong Khe, Ban To, Ban Xieng, Don Phuc 2, 6, 7, Khe Ran, Thanh Nam, Town 4 managed by Con Cuong Substation Management Team; Repairing branches of Xieng My, Vang Lin, Ban Tat, Dinh Tai, Ban Phay, Cha Hia, Trung Thang belonging to route 375E15.14, managed by the Tuong Duong Management Team; Repair of 35kV transmission lines of Binh Chuan, Tong Tien, Chom Muong transmission lines under transmission line 375E15.48 and Tam Son transmission lines 1, 2, 3 under transmission transmission line 377E15.48 and Ban Dinh transmission lines under transmission transmission line 371E15.48 and Tam Son 1 substation managed by the Con Cuong Management Team in the form Open bidding .
06/01/2026 09:40
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of 35kV transmission line repair items from column 04 NR of TBA 1 Thanh Yen to Substation 1 Thanh Yen, from column 09 NR of Substation 1 Thanh Yen to Yen Binh substation, from column 03 NR of Yen Binh substation to Yen Trung substation of transmission line 375E15.15 managed by Thanh Chuong Electricity Transmission Management Team; Repairing the 0.4kV transmission line behind substations 7 Nam Xuan and 2.6 Thi Tran managed by the Nam Dan Electricity Management Team; Repair of 0.4KV transmission line behind Substation No. 8 Nam Xuan managed by Nam Dan Electricity Management Team; Repairing substations No. 1, 2, 3 Cao Son and No. 1, 2 Lang Son are managed by the Anh Son VPD Management Team; Repairing NR Anh Son Town, NR TBA No. 01 Town and NR No. 01 Town, NR Thach Son 1, 2, 3 Dz 375E15.53 belonging to Anh Son Management Team in the form Open bidding .
06/01/2026 09:39
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of repair items for line 371E15-52 behind Dao 53 Do Thanh from column 51 to Tan Thanh 2 substation and Duc Thanh 4 forest managed by the Yen Thanh Construction Management Team; Repairing Duc Thanh 1, 2, Do Thanh 1 substations; Nam Thanh 1 is managed by the Yen Thanh Land Management Team; Repairing Substations Hong Thanh 1, Phu Thanh 1, Kim Thanh 1, Quang Thanh 2 managed by the Yen Thanh Construction Management Team; Repairing 0.4kV transmission line behind Phu Thanh 4, 6 substations; Do Thanh 6, 8, 12, 14 are managed by the Yen Thanh Land Management Team in the form Open bidding .
06/01/2026 09:39
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 01: Consulting on surveying, designing and preparing the Technical and Technical Report under the Project: Improving the reliability of 35kV medium voltage power grid managed by the Anh Son Electricity Management Team according to the Multiple division - Multiple connection plan in 2026 .
- Winning bidder: NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION
06/01/2026 08:52
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Procurement of materials for production in the first quarter of 2026 in the form Open bidding .
05/01/2026 14:09
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes the plan Procurement of materials for production in the first quarter of 2026 with 1 bidding package .
05/01/2026 09:26
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes the plan KHLCNT Repair substation branch No. 2, 3, 4, 5 Hung Linh, main shaft from column 22 to column 55 and Pump branch No. 10 Line 377E15.1 managed by Hung Nguyen Management Team; Repair of Substations No. 1 Tan Nhuong, No. 1 Hung Khanh, No. 1 Hung Linh, No. 1, 2 Nam Cat managed by Hung Nguyen Management Team; Repairing 0.4kV transmission line behind Substations No. 1 Hung Khanh, No. 1, 2, 3 Hung Phuc managed by Hung Nguyen Electricity Management Team; Repair of 0.4kV transmission line behind Hung Loc 1, Ha Huy Tap 7, Nghi Phu 7, Nghi Phu 1, Hung Manh Tien 2, Hoa Tien 2, Nghi Phu 7, Hung Dong Cooperative, Hung Hoa 7 and Phong Khanh substations managed by Vinh Electricity Management Team; Repairing the 0.4kV transmission line behind the Substations Unit 654, Nghi An 3, 6, 6A, 14, 9, 4A, 2, 2A, 16, 5 managed by the Vinh Power Station Management Team; Repairing 0.4kV transmission lines behind Hai Giang 3 substations; Nghi Khanh 1,2,3,6,7,8,10,11 are managed by Cua Lo Management Team; Repairing 0.4kV transmission lines behind Nghi Thai 6 substations; 12; Nghi Thach 1,4,5,7 are managed by Cua Lo Management Team; Main shaft repair of line 471+473E15.8, Thang Long NR, Truyen Transmission, Hon Ngu managed by Cua Lo Management Team; Repairing substations Xuan Tinh, Xuan Tan, Xuan Giang, Yen Thinh, Xuan Phuc, VT79 of the furnace door QLDLKV team; Repairing Nghi Khanh 2 substations; Nghi Thach 2; Nghi Huong 2; Nghi Tan 1 belongs to the Cua Oven QLDLKV team with 1 bidding package .
31/12/2025 10:38
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Package 02: Construction of repair items for line 373E15.56 from columns 108 to 154 main shaft; Nghi Thinh NR 5,7,9 DZ 478E15.8; NR Nghi Van 4 DZ 473E15.56 belongs to the Nghi Loc QLDLKV Team; Repairing the 0.4kV transmission line behind Nghi Quang 2, 4, and 7 substations managed by the Nghi Loc Power Generation Management Team; Repairing 0.4kV transmission lines behind Hung Tay 7.13 substations; Nghi Yen 2 and Nghi Trung 19 belong to the Nghi Loc QLDLKV Team; Repairing the 0.4kV transmission line behind Lien Thanh substations 5,6,7,8,9,10 managed by the Yen Thanh Power Station Management Team; Repairing 0.4kV transmission lines behind DC substations No. 2, 3 Thi Tran, Minh Chua, Tho Hop 6, Chau Loc 2, Chau Loc 2 DC, Lien Hop 2 managed by Quy Hop Power Station Management Team; Repairing Substations Chau Hong 2, Chau Ly 2, Tam Hop 3, Lien Hop 1, C6 Farm 3/2 managed by the Quy Hop Management Team; Repair of main shaft of line 373E15.3 from column 01 to column 15 managed by Quy Hop Management Team in the form Open bidding .
31/12/2025 10:30
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Package 01: Consulting on surveying, designing and preparing the Technical and Technical Report under the project Improving the reliability of 35kV medium voltage power grid power supply managed by Thanh Chuong Construction Management Team according to the Multiple division - Multiple connection plan in 2026 .
- Winning bidder: NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION
30/12/2025 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has posted 641 of the contractor selection plan, which contains 721 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has posted 706 Tender Notices in 604 bidding packages. Among these, 704 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has posted 659 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 659 package, canceled the bid 0 package (among the bidding packages above).
- There are 107 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has a relationship with 372 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has a relationship with 62 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects