Data analysis results of DauThau.info software for bid solicitors PMU2 as follows:
- Has relationships with 75 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 24 contractor selection plans with a total of 39 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 23 packages (with 34 tender notices), and conducted prequalification for 2 packages.
- Announced the results of 41 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 20 packages with results that do not have tender notice or prequalification notice.
- There are 14 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.18 contractors.
- Breakdown by bidding field: Goods 2.94%, Construction 5.88%, Consultancy 70.59%, Non-consultancy 20.59%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 8,966,925,930,992 VND, of which the total winning bid value is: 8,434,436,352,893 VND.
- The savings rate is: 5.94%.
Data analysis results of DauThau.info software for bid solicitors PMU2 as follows:
- Has relationships with 75 contractor.
- The average number of contractors participating in each bidding package is: 3.18 contractors.
- Proportion of bidding fields: Goods 2.94%, Construction 5.88%, Consulting 70.59%, Non-consulting 20.59%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 8,966,925,930,992 VND, in which the total winning value is: 8,434,436,352,893 VND.
- The savings rate is: 5.94%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 5 investment and development projects.
- As the owner of 24 Contractor selection plan in which 22 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 38 bidding packages in which 34 packages are self-invited, and 4 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor PMU2 has posted the request Decision on approving additional contractor selection plans for a number of bidding packages under the Cho Moi - Bac Kan route construction investment project, Bac Kan province of the investor PMU2 with 4 bidding package.
25/10/2024 10:10
The Bid solicitor PMU2 has posted the results of the bidding package Package TV09C: Construction supervision consultancy for bomb, mine and explosive material clearance. of the investor PMU2.
- Winning bidder: TIỂU ĐOÀN 544
21/10/2024 16:52
The Bid solicitor PMU2 has posted the results of the bidding package Package 09B: Construction of clearing mines and explosives of the investor PMU2.
- Winning bidder: 319 CORPORATION MINISTRY OF NATIONAL DEFENCE
21/10/2024 16:46
Bid solicitor PMU2 has posted Tender Notice Package TV-09: Consulting on traffic safety verification before putting the project into operation. of the investor PMU2 with the form Open bidding.
16/10/2024 16:37
The Bid solicitor PMU2 has posted the request Decision to approve adjustments to the contractor selection plan Package TV-09: Consulting on traffic safety verification before putting the project into operation Project traffic connection in the Northern mountainous provinces of the investor PMU2 with 1 bidding package.
14/10/2024 15:44
The Bid solicitor PMU2 has posted the request Decision approving the additional contractor selection plan for the construction investment component project of National Highway 45 Nghi Son of the investor PMU2 with 6 bidding package.
08/10/2024 14:37
The Bid solicitor PMU2 has posted the results of the bidding package Tender package TV08: Consultancy for verification of technical design and cost estimate of the investor PMU2.
- Winning bidder: VIET NAM EXPRESSWAY CONSULTANT JOINT STOCK COMPANY
07/10/2024 16:22
Bid solicitor PMU2 has posted Tender Notice Bidding package TV20: Consulting on auditing and finalizing completed projects of the investor PMU2 with the form Open bidding.
04/10/2024 16:50
The Bid solicitor PMU2 has posted the results of the bidding package XL: Renovating and repairing the roof of the 6th floor of Project Management Board2's office of the investor PMU2.
- Winning bidder: CÔNG TY TNHH GIANG TRƯỜNG THỌ
18/09/2024 14:09
The Bid solicitor PMU2 has posted the results of the bidding package Bidding package TV07: Consulting and supervision of the survey work of the technical design step. of the investor PMU2.
- Winning bidder: TRANSPORT ENGINEERING CONSULTANT INTERNATIONAL JOINT STOCK COMPANY
11/09/2024 11:37
The data sheet has been partially hidden, to see the full information please Login or Register
PMU2 publishes the plan Decision on approving additional contractor selection plans for a number of bidding packages under the Cho Moi - Bac Kan route construction investment project, Bac Kan province with 4 bidding package .
25/10/2024 10:10
PMU2 announced the results of the bidding package Bidding package TV20: Consulting on auditing and finalizing completed projects with 1 participating contractors .
24/10/2024 10:08
PMU2 announced the results of the bid package Package TV09C: Construction supervision consultancy for bomb, mine and explosive material clearance. .
- Winning bidder: TIỂU ĐOÀN 544
21/10/2024 16:52
PMU2 announced the results of the bid package Package 09B: Construction of clearing mines and explosives .
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION, LUNG LO CONSTRUCTION CORPORATION, 319 CORPORATION MINISTRY OF NATIONAL DEFENCE
21/10/2024 16:46
PMU2 publishes Tender Notice Package TV-09: Consulting on traffic safety verification before putting the project into operation. in the form Open bidding .
16/10/2024 16:37
PMU2 publishes the plan Decision to approve adjustments to the contractor selection plan Package TV-09: Consulting on traffic safety verification before putting the project into operation Project traffic connection in the Northern mountainous provinces with 1 bidding package .
14/10/2024 15:44
PMU2 publishes the plan Decision approving the additional contractor selection plan for the construction investment component project of National Highway 45 Nghi Son with 6 bidding package .
08/10/2024 14:37
PMU2 announced the results of the bid package Tender package TV08: Consultancy for verification of technical design and cost estimate .
- Winning bidder: TRANSPORTATION INVESTMENT AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY, VIET NAM EXPRESSWAY CONSULTANT JOINT STOCK COMPANY
07/10/2024 16:22
PMU2 publishes Tender Notice Bidding package TV20: Consulting on auditing and finalizing completed projects in the form Open bidding .
04/10/2024 16:50
PMU2 announced the results of the bid package XL: Renovating and repairing the roof of the 6th floor of Project Management Board2's office .
- Winning bidder: CÔNG TY TNHH GIANG TRƯỜNG THỌ
18/09/2024 14:09
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PMU2 has posted the request Decision on approving additional contractor selection plans for a number of bidding packages under the Cho Moi - Bac Kan route construction investment project, Bac Kan province of the investor PMU2 with 4 bidding package.
25/10/2024 10:10
The Bid solicitor PMU2 has posted the results of the bidding package Package TV09C: Construction supervision consultancy for bomb, mine and explosive material clearance. of the investor PMU2.
- Winning bidder: TIỂU ĐOÀN 544
21/10/2024 16:52
The Bid solicitor PMU2 has posted the results of the bidding package Package 09B: Construction of clearing mines and explosives of the investor PMU2.
- Winning bidder: 319 CORPORATION MINISTRY OF NATIONAL DEFENCE
21/10/2024 16:46
Bid solicitor PMU2 has posted Tender Notice Package TV-09: Consulting on traffic safety verification before putting the project into operation. of the investor PMU2 with the form Open bidding.
16/10/2024 16:37
The Bid solicitor PMU2 has posted the request Decision to approve adjustments to the contractor selection plan Package TV-09: Consulting on traffic safety verification before putting the project into operation Project traffic connection in the Northern mountainous provinces of the investor PMU2 with 1 bidding package.
14/10/2024 15:44
The Bid solicitor PMU2 has posted the request Decision approving the additional contractor selection plan for the construction investment component project of National Highway 45 Nghi Son of the investor PMU2 with 6 bidding package.
08/10/2024 14:37
The Bid solicitor PMU2 has posted the results of the bidding package Tender package TV08: Consultancy for verification of technical design and cost estimate of the investor PMU2.
- Winning bidder: VIET NAM EXPRESSWAY CONSULTANT JOINT STOCK COMPANY
07/10/2024 16:22
Bid solicitor PMU2 has posted Tender Notice Bidding package TV20: Consulting on auditing and finalizing completed projects of the investor PMU2 with the form Open bidding.
04/10/2024 16:50
The Bid solicitor PMU2 has posted the results of the bidding package XL: Renovating and repairing the roof of the 6th floor of Project Management Board2's office of the investor PMU2.
- Winning bidder: CÔNG TY TNHH GIANG TRƯỜNG THỌ
18/09/2024 14:09
The Bid solicitor PMU2 has posted the results of the bidding package Bidding package TV07: Consulting and supervision of the survey work of the technical design step. of the investor PMU2.
- Winning bidder: TRANSPORT ENGINEERING CONSULTANT INTERNATIONAL JOINT STOCK COMPANY
11/09/2024 11:37
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PMU2 has posted 24 of the contractor selection plan, which contains 39 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PMU2 posted 2 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PMU2 has posted 34 Tender Notice in the 23 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PMU2 has posted 41 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 41 package, canceled the bid 0 package (among the bidding packages above).
- There are 20 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PMU2 has a relationship with 75 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is the investor of 38 package, of which 34 package is self-invited, other units invite bid 4 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is the owner of 24 contractor selection plan. In which, they self-invite 22 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor PMU2 is an investor with 87 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register