Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PMUR as follows:
- Has relationships with 1 project owners.
- Has relationships with 211 contractor.
- Announced 28 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 141 contractor selection plans with a total of 263 bidding packages, of which 52 prequalification documents have not found the investment project.
- Has invited bids for 212 packages (with 262 tender notices), and conducted prequalification for 1 packages.
- There are 17 bidding packages with content that needs clarification.
- Announced the results of 259 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 66 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 47 packages that have not fully posted the contractor selection results. Of these 44 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.65 contractors.
- Breakdown by bidding field: Goods 0.76%, Construction 29.77%, Consultancy 59.54%, Non-consultancy 8.40%, Mixed 1.53%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,105,705,967,822 VND, of which the total winning bid value is: 10,889,895,367,175 VND.
- The savings rate is: 16.91%.
Data analysis results of DauThau.info software for bid solicitors PMUR as follows:
- Has relationships with 211 contractor.
- The average number of contractors participating in each bidding package is: 1.65 contractors.
- Proportion of bidding fields: Goods 0.76%, Construction 29.77%, Consulting 59.54%, Non-consulting 8.40%, Mixed 1.53%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,105,705,967,822 VND, in which the total winning value is: 10,889,895,367,175 VND.
- The savings rate is: 16.91%.
This Bid solicitor is also an investor. The analysis results of data for the investor PMUR are as follows:
- Is the investor of 28 development investment projects.
- Is the investor of 156 contractor selection plans, of which 112 were self-published, and 44 were published by other entities.
- Is the investor of 271 Tender Notices, of which 260 were self-invited, and 11 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PMUR announced the results of the bid package Package TV-CL-08: Consulting on traffic safety verification before putting the project into operation .
- Winning bidder: Northern Road Engineering and Technology Center
27/08/2026 08:40
PMUR publishes the plan Adjusting and supplementing the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 15 bidding package .
24/08/2026 14:51
PMUR publishes the plan Adjusting the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 13 bidding package .
18/08/2026 10:11
PMUR announced the results of the bid package Package KT01: Consulting on auditing the final settlement report of completed projects .
- Winning bidder: /
13/08/2026 10:59
PMUR publishes the plan Tender Selection Plan: Repair, Maintenance, and Replacement of Parts for 6 Cars owned by the Railway Project Management Board. with 1 bidding package .
07/08/2026 14:54
PMUR publishes the plan Plan for selecting contractors for several packages within the "Upgrade of the Duong River Transport Route (Duong Railway Bridge)" project. with 1 bidding package .
06/08/2026 09:08
PMUR publishes the plan Adjusting and supplementing the contractor selection plan for Cam Ly railway bridge project Km24+134 Kep - Ha Long railway line with 11 bidding package .
10/07/2026 11:19
PMUR publishes Tender Notice Package KT01: Consulting on auditing the final settlement report of completed projects in the form Open bidding .
26/06/2026 09:23
PMUR announced the results of the bid package Procurement of Electronic Office software for the Railway Project Management Board .
- Winning bidder: VIETNAM SOFTWARE SOLUTION COMPANY LIMITED
29/05/2026 16:05
PMUR publishes the plan Adjusting the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 13 bidding package .
22/05/2026 15:38
The data sheet has been partially hidden, to see the full information please Login or Register
PMUR announced the results of the bid package XL-HDTL: Surveying, designing construction drawings, construction of construction items and buying construction insurance .
05/02/2026 11:25
PMUR publishes the plan Supplementing the plan to select the contractor to renovate the Hoa Duyet area - purifying, the Hanoi - Ho Chi Minh City Railway. Ho Chi Minh with 9 bidding package .
05/02/2026 10:50
PMUR publishes the plan Supplementing the plan to select the contractor to renovate the Hoa Duyet area - purifying, the Hanoi - Ho Chi Minh City Railway. Ho Chi Minh with 9 bidding package .
28/01/2026 17:45
PMUR announced the results of the bid package TV-HDTL-08: Environmental monitoring and monitoring advice .
- Winning bidder: INSTITUTE OF ENVIRONMENTAL STUDIES
20/01/2026 14:49
PMUR announced the results of the bid package TV-01 bidding package: Project management advice on project preparation .
- Winning bidder: ARTELIA SAS, ARTELIA VIETNAM COMPANY LIMITED, INECO, RAILWAY CONSTRUCTION AND INVESTMENT CONSULTANT JOINT STOCK COMPANY
14/01/2026 11:22
PMUR publishes the plan Contractor selection plan for the project to upgrade and expand a number of bridges and tunnels on National Highway 1 (Xuong Giang, Gianh, Quan Hau bridges and Deo Ngang tunnel) with 18 bidding package .
01/11/2025 10:32
PMUR announced the results of the bidding package TV-01 bidding package: Project management advice on project preparation with 2 participating contractors .
24/10/2025 10:30
PMUR announced the results of the bid package Bidding package BM-HDTL-03: Supervising construction and construction of mines and explosive objects. .
- Winning bidder: Technology Centre for Bomb and Mine Disposal
26/09/2025 23:04
PMUR publishes Tender Notice TV-01 bidding package: Project management advice on project preparation in the form Open bidding .
21/09/2025 10:44
PMUR announced the results of the bid package TV-CĐ-09 bidding package: Auditing consultancy, completed project settlement .
- Winning bidder: VACO AUDITING COMPANY LIMITED
20/09/2025 16:50
The data sheet has been partially hidden, to see the full information please Login or Register
PMUR announced the results of the bid package Package TV-CL-08: Consulting on traffic safety verification before putting the project into operation .
- Winning bidder: Northern Road Engineering and Technology Center
27/08/2026 08:40
PMUR publishes the plan Adjusting and supplementing the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 15 bidding package .
24/08/2026 14:51
PMUR publishes the plan Adjusting the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 13 bidding package .
18/08/2026 10:11
PMUR announced the results of the bid package Package KT01: Consulting on auditing the final settlement report of completed projects .
- Winning bidder: /
13/08/2026 10:59
PMUR publishes the plan Tender Selection Plan: Repair, Maintenance, and Replacement of Parts for 6 Cars owned by the Railway Project Management Board. with 1 bidding package .
07/08/2026 14:54
PMUR publishes the plan Plan for selecting contractors for several packages within the "Upgrade of the Duong River Transport Route (Duong Railway Bridge)" project. with 1 bidding package .
06/08/2026 09:08
PMUR publishes the plan Adjusting and supplementing the contractor selection plan for Cam Ly railway bridge project Km24+134 Kep - Ha Long railway line with 11 bidding package .
10/07/2026 11:19
PMUR publishes Tender Notice Package KT01: Consulting on auditing the final settlement report of completed projects in the form Open bidding .
26/06/2026 09:23
PMUR announced the results of the bid package Procurement of Electronic Office software for the Railway Project Management Board .
- Winning bidder: VIETNAM SOFTWARE SOLUTION COMPANY LIMITED
29/05/2026 16:05
PMUR publishes the plan Adjusting the contractor selection plan for component project 2: Investment in construction of railway works under the Lao Cai - Hanoi - Hai Phong railway construction investment project with 13 bidding package .
22/05/2026 15:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PMUR has posted 141 of the contractor selection plan, which contains 263 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PMUR posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PMUR has posted 262 Tender Notices in 212 bidding packages. Among these, 260 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PMUR has posted 259 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 259 package, canceled the bid 0 package (among the bidding packages above).
- There are 66 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PMUR has a relationship with 211 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PMUR has a relationship with 40 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity PMUR has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects