Data analysis results of DauThau.info software for bid solicitors PPMU as follows:
- Has relationships with 6 project owners.
- Has relationships with 158 contractor.
- Announced 15 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 134 contractor selection plans with a total of 344 bidding packages, of which 56 prequalification documents have not found the investment project.
- Has invited bids for 92 packages (with 114 tender notices), and conducted prequalification for 7 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 283 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 202 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 127 packages that have not fully posted the contractor selection results. Of these 122 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.56 contractors.
- Breakdown by bidding field: Goods 0.88%, Construction 62.28%, Consultancy 29.82%, Non-consultancy 6.14%, Mixed 0.88%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,351,866,109,011 VND, of which the total winning bid value is: 1,218,509,262,451 VND.
- The savings rate is: 9.86%.
Data analysis results of DauThau.info software for bid solicitors PPMU as follows:
- Has relationships with 158 contractor.
- The average number of contractors participating in each bidding package is: 1.56 contractors.
- Proportion of bidding fields: Goods 0.88%, Construction 62.28%, Consulting 29.82%, Non-consulting 6.14%, Mixed 0.88%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,351,866,109,011 VND, in which the total winning value is: 1,218,509,262,451 VND.
- The savings rate is: 9.86%.
This Bid solicitor is also an investor. The analysis results of data for the investor PPMU are as follows:
- Is the investor of 15 development investment projects.
- Is the investor of 35 contractor selection plans, of which 29 were self-published, and 6 were published by other entities.
- Is the investor of 41 Tender Notices, of which 37 were self-invited, and 4 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 64 bidding packages, of which 63 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.21% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.91% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Trị (38), Undefined (26)
- Provinces before the merger where the contractor has participated in bidding : Quảng Bình (38), Undefined (26)
- Has relationships with 8 Bid Solicitors
- Has competed against 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PPMU announced the results of the bid package Package No. 02/TV-VD: Verification of Technical Audit Report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
30/12/2025 10:09
PPMU announced the results of the bid package Bidding package No. 01/TV-VD: Survey and preparation of Technical and Technical Report .
- Winning bidder: VIET TIN JOINT STOCK COMPANY
30/12/2025 10:01
PPMU publishes the plan Contractor selection plan for project preparation phase, Emergency landslide protection embankment project in Truong An village, Tra Tri Phu village, Vinh Dinh commune with 3 bidding package .
27/12/2025 16:31
Investor PPMU has posted an investment and development project Emergency landslide protection embankment in Truong An hamlet, Tra Tri Phu hamlet, Vinh Dinh commune.
27/12/2025 16:16
The Bid solicitor PPMU has posted the results of the bidding package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
The Bid solicitor PPMU has posted the results of the bidding package Bidding package 20: Construction quality accreditation advice of the investor PPMU.
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
The Bid solicitor PPMU has posted the results of the bidding package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
PPMU announced the results of the bid package Contract package: Construction of additional items for Trooc Voc lake .
20/11/2025 15:10
PPMU announced the results of the bid package Survey, prepare and adjust the Feasibility Study Report and Design the Estimate .
- Winning bidder: CÔNG TY TNHH NAM VIỆT
20/11/2025 15:04
PPMU publishes the plan Contractor selection plan (phase 2), Project: Upgrading Trooc Voc Lake with 1 bidding package .
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
PPMU announced the results of the bid package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives .
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
PPMU announced the results of the bid package Bidding package 20: Construction quality accreditation advice .
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
PPMU announced the results of the bid package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives .
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
PPMU announced the results of the bid package Package 18: Construction insurance .
- Winning bidder: BaoViet Insurance Corporation, PVI Insurance
15/10/2025 08:03
PPMU announced the results of the bid package Package No. 15/TV-TrV: Operating process .
- Winning bidder: CÔNG TY TNHH TƯ VẤN KHẢO SÁT – THIẾT KẾ HOÀNH SƠN
28/08/2025 16:19
PPMU announced the results of the bid package Package No. 09: Construction of works: embankment; Type 1 vessel anchor; Ship anchor system; Construction roads and works on the route .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP THẮNG LỢI, CÔNG TY TNHH TƯ VẤN XÂY DỰNG XUÂN QUANG, CÔNG TY TNHH XÂY DỰNG TỔNG HỢP TIÊN PHONG, CÔNG TY TNHH XÂY DỰNG TỔNG HỢP TOÀN THẮNG
09/07/2025 16:06
PPMU announced the results of the bid package Bidding package 09: Advice on cadastral measurement and compensation, support and resettlement plan .
- Winning bidder: CÔNG TY TNHH TƯ VẤN DỊCH VỤ THÀNH TUẤN
04/07/2025 08:16
PPMU announced the results of the bid package Package 12: Quality inspection of works .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ CÔNG NGHỆ THIÊN HOÀNG
02/07/2025 09:21
PPMU announced the results of the bid package Package 09: Construction insurance .
- Winning bidder: Công ty cổ phần Tập đoàn bảo hiểm DBV
02/07/2025 09:16
PPMU announced the results of the bid package Package No. 10: Construction of works: Dredging channels and parking areas + System of giving signals; System of vessel float + turtle anchor; San covering the face; Land barrier; Regulatory control to ensure traffic safety .
- Winning bidder: PHU XUAN CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
28/06/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
PPMU announced the results of the bid package Package No. 02/TV-VD: Verification of Technical Audit Report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
30/12/2025 10:09
PPMU announced the results of the bid package Bidding package No. 01/TV-VD: Survey and preparation of Technical and Technical Report .
- Winning bidder: VIET TIN JOINT STOCK COMPANY
30/12/2025 10:01
PPMU publishes the plan Contractor selection plan for project preparation phase, Emergency landslide protection embankment project in Truong An village, Tra Tri Phu village, Vinh Dinh commune with 3 bidding package .
27/12/2025 16:31
Investor PPMU has posted an investment and development project Emergency landslide protection embankment in Truong An hamlet, Tra Tri Phu hamlet, Vinh Dinh commune.
27/12/2025 16:16
The Bid solicitor PPMU has posted the results of the bidding package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
The Bid solicitor PPMU has posted the results of the bidding package Bidding package 20: Construction quality accreditation advice of the investor PPMU.
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
The Bid solicitor PPMU has posted the results of the bidding package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
PPMU announced the results of the bid package Contract package: Construction of additional items for Trooc Voc lake .
20/11/2025 15:10
PPMU announced the results of the bid package Survey, prepare and adjust the Feasibility Study Report and Design the Estimate .
- Winning bidder: CÔNG TY TNHH NAM VIỆT
20/11/2025 15:04
PPMU publishes the plan Contractor selection plan (phase 2), Project: Upgrading Trooc Voc Lake with 1 bidding package .
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PPMU has posted 134 of the contractor selection plan, which contains 344 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PPMU posted 7 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PPMU has posted 114 Tender Notices in 92 bidding packages. Among these, 38 Tender Notices were self-invited, and 76 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PPMU has posted 283 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 283 package, canceled the bid 0 package (among the bidding packages above).
- There are 202 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PPMU has a relationship with 158 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PPMU has a relationship with 75 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity PPMU has a relationship with 8 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects