Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PROJECT MANAGEMENT UNIT NO 1 as follows:
- Has relationships with 0 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 1 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 13 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 13 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 25.00%, Consultancy 25.00%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 72,948,749,765 VND, of which the total winning bid value is: 35,714,106,495 VND.
- The savings rate is: 51.04%.
Data analysis results of DauThau.info software for bid solicitors PROJECT MANAGEMENT UNIT NO 1 as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 25.00%, Consulting 25.00%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 72,948,749,765 VND, in which the total winning value is: 35,714,106,495 VND.
- The savings rate is: 51.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor PROJECT MANAGEMENT UNIT NO 1 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 1 contractor selection plans, of which 0 were self-published, and 1 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package No. 8: Surveying, making plans to clear mines and explosives of the investor PROJECT MANAGEMENT UNIT NO 1.
02/03/2017 17:50
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 9: Construction quality inspection consultancy of the investor PROJECT MANAGEMENT UNIT NO 1.
02/03/2017 17:16
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package CSM-4: Capacity Building Consulting Service for Inspectors of MOT of the investor PROJECT MANAGEMENT UNIT NO 1.
17/08/2016 10:38
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1.
- Winning bidder: Công ty TNHH MTV Tư vấn và khảo sát thiết kế xây dựng
08/07/2016 16:31
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 06: Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1.
08/07/2016 16:28
Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted Tender Notice Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1 with the form National competitive bidding.
28/04/2016 09:50
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package CSM-1: Advisory Service Capacity Building and Policy Support for Expressway Network Planning and Management of the investor PROJECT MANAGEMENT UNIT NO 1.
26/01/2016 14:59
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the request The 2nd Northern Greater Mekong Subregion (GMS) Upgrading Project - Upgrading National Highway 217, Thanh Hoa Province Phase 1 of the investor PROJECT MANAGEMENT UNIT NO 1 with 1 bidding package.
15/01/2016 14:21
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 06: Surveying consultancy, construction drawing design - cost estimate of section Km32+00 -:- Km46+316 of the investor PROJECT MANAGEMENT UNIT NO 1.
01/01/2016 20:30
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package No. 5: Construction of Hung Ha Bridge and the road at both ends of the bridge of the investor PROJECT MANAGEMENT UNIT NO 1.
30/12/2015 11:13
The data sheet has been partially hidden, to see the full information please Login or Register
PROJECT MANAGEMENT UNIT NO 1 publishes Tender Notice Tender package No 7: Independent consultant to supervise site clearance and resettlement in the form Open bidding (Only select domestic contractors) .
03/04/2017 16:10
PROJECT MANAGEMENT UNIT NO 1 publishes Tender Notice Tender package No 5: Building Thinh Long Bridge in the form Open bidding (Select domestic & international contractors) .
24/03/2017 15:26
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package Package No. 8: Surveying, making plans to clear mines and explosives .
- Winning bidder: Tổng công ty Hợp tác kinh tế (Quân khu 4)
02/03/2017 17:50
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package Package 9: Construction quality inspection consultancy .
- Winning bidder: Trung tâm Kỹ thuật đường bộ 3
02/03/2017 17:16
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package CSM-4: Capacity Building Consulting Service for Inspectors of MOT .
17/08/2016 10:38
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design .
- Winning bidder: Công ty TNHH MTV Tư vấn và khảo sát thiết kế xây dựng
08/07/2016 16:31
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package Package 06: Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design .
- Winning bidder: Công ty TNHH MTV Tư vấn và khảo sát thiết kế xây dựng
08/07/2016 16:28
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package CSM-1: Advisory Service Capacity Building and Policy Support for Expressway Network Planning and Management .
- Winning bidder: Tư vấn GETINSA INGENIERIA S.L (Tây Ban Nha) liên kết với tư vấn phụ Công ty cổ phần Tư vấn thiết kế Giao thông vận tải phía Nam (TEDI-South) (Việt Nam)
26/01/2016 14:59
PROJECT MANAGEMENT UNIT NO 1 announced the results of the bid package Package 06: Surveying consultancy, construction drawing design - cost estimate of section Km32+00 -:- Km46+316 .
- Winning bidder: Công ty cổ phần đầu tư xây dựng Đường Việt
01/01/2016 20:30
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package No. 8: Surveying, making plans to clear mines and explosives of the investor PROJECT MANAGEMENT UNIT NO 1.
02/03/2017 17:50
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 9: Construction quality inspection consultancy of the investor PROJECT MANAGEMENT UNIT NO 1.
02/03/2017 17:16
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package CSM-4: Capacity Building Consulting Service for Inspectors of MOT of the investor PROJECT MANAGEMENT UNIT NO 1.
17/08/2016 10:38
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1.
- Winning bidder: Công ty TNHH MTV Tư vấn và khảo sát thiết kế xây dựng
08/07/2016 16:31
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 06: Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1.
08/07/2016 16:28
Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted Tender Notice Consultancy on verification of technical design, cost estimate and traffic safety verification step of technical design of the investor PROJECT MANAGEMENT UNIT NO 1 with the form National competitive bidding.
28/04/2016 09:50
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package CSM-1: Advisory Service Capacity Building and Policy Support for Expressway Network Planning and Management of the investor PROJECT MANAGEMENT UNIT NO 1.
26/01/2016 14:59
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the request The 2nd Northern Greater Mekong Subregion (GMS) Upgrading Project - Upgrading National Highway 217, Thanh Hoa Province Phase 1 of the investor PROJECT MANAGEMENT UNIT NO 1 with 1 bidding package.
15/01/2016 14:21
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package 06: Surveying consultancy, construction drawing design - cost estimate of section Km32+00 -:- Km46+316 of the investor PROJECT MANAGEMENT UNIT NO 1.
01/01/2016 20:30
The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted the results of the bidding package Package No. 5: Construction of Hung Ha Bridge and the road at both ends of the bridge of the investor PROJECT MANAGEMENT UNIT NO 1.
30/12/2015 11:13
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted 4 Tender Notices in 4 bidding packages. Among these, 0 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has posted 13 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 13 package, canceled the bid 0 package (among the bidding packages above).
- There are 13 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PROJECT MANAGEMENT UNIT NO 1 has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects