Data analysis results of DauThau.info software for bid solicitors Project Management Unit 8 as follows:
- Has relationships with 290 contractor.
- Announced 22 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 508 contractor selection plans with a total of 887 bidding packages, of which 165 prequalification documents have not found the investment project.
- Has invited bids for 460 packages (with 605 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 684 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 327 packages with results that do not have tender notice or prequalification notice.
- There are 521 packages that have not fully posted the contractor selection results. Of these 442 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.90 contractors.
- Breakdown by bidding field: Goods 0.17%, Construction 59.50%, Consultancy 39.67%, Non-consultancy 0.17%, Mixed 0%, Other fields 0.5%.
- The total value according to the packages with valid contractor selection results is: 2,977,135,055,191 VND, of which the total winning bid value is: 2,798,045,099,888 VND.
- The savings rate is: 6.02%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit 8 as follows:
- Has relationships with 290 contractor.
- The average number of contractors participating in each bidding package is: 1.90 contractors.
- Proportion of bidding fields: Goods 0.17%, Construction 59.50%, Consulting 39.67%, Non-consulting 0.17%, Mixed 0%, Other 0.5%.
- The total value according to the bidding package with valid IMP is: 2,977,135,055,191 VND, in which the total winning value is: 2,798,045,099,888 VND.
- The savings rate is: 6.02%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 22 investment and development projects.
- As the owner of 70 Contractor selection plan in which 69 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 77 bidding packages in which 77 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 5 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.55% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Undefined (5)
- Has relationships with 3 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: BAN QUẢN LÝ DỰ ÁN 8
- Code of capacity certificate of construction activities: 00020025
- Issuer: Tổng cục đường bộ Việt Nam
- Fields:
⚬ Giám sát thi công xây dựng công trình: giao thông đường bộ
⚬ Giám sát thi công xây dựng công trình: giao thông cầu
⚬ Quản lý dự án đầu tư xây dựng: Giao thông (đường bộ)
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:22
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:21
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:20
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
24/10/2024 10:33
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 2: Survey consultancy, design and cost estimate of the investor Project Management Unit 8 with the form Open bidding.
23/10/2024 16:24
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
18/10/2024 15:06
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 3: Construction supervision consultancy of the investor Project Management Unit 8.
- Winning bidder: TRUONG PHAT CONSULTALT JOINT STOCK COMPANY
17/10/2024 15:11
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
16/10/2024 16:15
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
14/10/2024 11:15
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Advise
survey,
make a report
study
Feasibility head
construction investment of the investor Project Management Unit 8.
08/10/2024 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit 8 publishes Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works in the form Open bidding .
24/10/2024 16:22
Project Management Unit 8 publishes Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works in the form Open bidding .
24/10/2024 16:21
Project Management Unit 8 publishes Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works in the form Open bidding .
24/10/2024 16:20
Project Management Unit 8 announced the results of the bid package Package No. 5: Consulting on auditing and finalization of completed works .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
24/10/2024 10:33
Project Management Unit 8 publishes Tender Notice Tender package No 2: Survey consultancy, design and cost estimate in the form Open bidding .
23/10/2024 16:24
Project Management Unit 8 announced the results of the bidding package Bidding package no
2: Consulting
survey,
design
BVTC and attendance
maths with 1 participating contractors .
20/10/2024 09:40
Project Management Unit 8 announced the results of the bid package Package No. 5: Consulting on auditing and finalization of completed works .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
18/10/2024 15:06
Project Management Unit 8 announced the results of the bid package Package 3: Construction supervision consultancy .
- Winning bidder: TRUONG PHAT CONSULTALT JOINT STOCK COMPANY
17/10/2024 15:11
Project Management Unit 8 publishes Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works in the form Open bidding .
16/10/2024 16:15
Project Management Unit 8 publishes Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works in the form Open bidding .
14/10/2024 11:15
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:22
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:21
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
24/10/2024 16:20
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
24/10/2024 10:33
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 2: Survey consultancy, design and cost estimate of the investor Project Management Unit 8 with the form Open bidding.
23/10/2024 16:24
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
18/10/2024 15:06
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 3: Construction supervision consultancy of the investor Project Management Unit 8.
- Winning bidder: TRUONG PHAT CONSULTALT JOINT STOCK COMPANY
17/10/2024 15:11
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
16/10/2024 16:15
Bid solicitor Project Management Unit 8 has posted Tender Notice Tender package No 5: Consulting on auditing and finalization of completed works of the investor Project Management Unit 8 with the form Open bidding.
14/10/2024 11:15
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Advise
survey,
make a report
study
Feasibility head
construction investment of the investor Project Management Unit 8.
08/10/2024 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit 8 has posted 508 of the contractor selection plan, which contains 887 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Unit 8 has posted 605 Tender Notice in the 460 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit 8 has posted 684 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 684 package, canceled the bid 0 package (among the bidding packages above).
- There are 327 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit 8 has a relationship with 290 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 is the investor of 77 package, of which 77 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 is the owner of 70 contractor selection plan. In which, they self-invite 69 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor Project Management Unit 8 is an investor with 178 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 is the investor of 22 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code