Data analysis results of DauThau.info software for bid solicitors Project Management board as follows:
- Has relationships with 7 project owners.
- Has relationships with 68 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 219 contractor selection plans with a total of 501 bidding packages, of which 219 prequalification documents have not found the investment project.
- Has invited bids for 75 packages (with 77 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 186 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 143 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 501 packages that have not fully posted the contractor selection results. Of these 501 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 9.09%, Construction 33.77%, Consultancy 42.86%, Non-consultancy 6.49%, Mixed 7.79%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 342,396,831,314 VND, of which the total winning bid value is: 327,766,094,031 VND.
- The savings rate is: 4.27%.
Data analysis results of DauThau.info software for bid solicitors Project Management board as follows:
- Has relationships with 68 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 9.09%, Construction 33.77%, Consulting 42.86%, Non-consulting 6.49%, Mixed 7.79%, Other 0%.
- The total value according to the bidding package with valid IMP is: 342,396,831,314 VND, in which the total winning value is: 327,766,094,031 VND.
- The savings rate is: 4.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management board are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 87 Tender Notices, of which 44 were self-invited, and 43 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Project Management board has posted an investment and development project 110kV transformer station Thong Nhat Park.
06/05/2018 07:00
The Bid solicitor Project Management board has posted the results of the bidding package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation of the investor Project Management board.
22/02/2018 13:49
The Bid solicitor Project Management board has posted the results of the bidding package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:46
The Bid solicitor Project Management board has posted the results of the bidding package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:45
The Bid solicitor Project Management board has posted the results of the bidding package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:43
The Bid solicitor Project Management board has posted the results of the bidding package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. of the investor Project Management board.
22/01/2018 14:41
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction of the investor Project Management board.
04/12/2017 11:09
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: installation of line deflection protection F87L of the investor Project Management board.
07/11/2017 11:20
The Bid solicitor Project Management board has posted the results of the bidding package Package 9 "Measurement and drawing for site clearance" of the investor Project Management board.
11/10/2017 10:00
The Bid solicitor Project Management board has posted the results of the bidding package Package 7 "Clearing bombs and mines" of the investor Project Management board.
11/10/2017 09:56
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management board announced the results of the bid package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation .
- Winning bidder: Liên danh xây lắp điện lô thầu 01 - J
22/02/2018 13:49
Project Management board announced the results of the bid package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng điện lực.
22/01/2018 14:46
Project Management board announced the results of the bid package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐIỆN PACIFIC, CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN LỰC HÀ NỘI
22/01/2018 14:45
Project Management board announced the results of the bid package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: Công ty cổ phần tư vấn đầu tư thiết kế xây dựng điện và công nghiệp.
22/01/2018 14:43
Project Management board announced the results of the bid package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. .
- Winning bidder: Công ty cổ phần Tư vấn Xây dựng Điện lực Hà Nội
22/01/2018 14:41
Project Management board announced the results of the bid package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction .
- Winning bidder: Công ty TNHH Một thành viên Kiến trúc sư Việt Nam
04/12/2017 11:09
Project Management board announced the results of the bid package Package 11: installation of line deflection protection F87L .
- Winning bidder: Hủy thầu
07/11/2017 11:20
Project Management board announced the results of the bid package Package 9 "Measurement and drawing for site clearance" .
- Winning bidder: Công ty cổ phần đầu tư xây dựng và khảo sát đo đạc Hà Nội
11/10/2017 10:00
Project Management board announced the results of the bid package Package 7 "Clearing bombs and mines" .
- Winning bidder: Công ty TNHH Một thành viên Lũng Lô 3
11/10/2017 09:56
Project Management board announced the results of the bid package Package 11 “Preparing Environmental Impact Assessment Report after adjusting substation location” .
- Winning bidder: Công ty cổ phần Xây dựng và Môi trường Vinahenco
11/10/2017 09:50
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Project Management board has posted an investment and development project 110kV transformer station Thong Nhat Park.
06/05/2018 07:00
The Bid solicitor Project Management board has posted the results of the bidding package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation of the investor Project Management board.
22/02/2018 13:49
The Bid solicitor Project Management board has posted the results of the bidding package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:46
The Bid solicitor Project Management board has posted the results of the bidding package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:45
The Bid solicitor Project Management board has posted the results of the bidding package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:43
The Bid solicitor Project Management board has posted the results of the bidding package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. of the investor Project Management board.
22/01/2018 14:41
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction of the investor Project Management board.
04/12/2017 11:09
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: installation of line deflection protection F87L of the investor Project Management board.
07/11/2017 11:20
The Bid solicitor Project Management board has posted the results of the bidding package Package 9 "Measurement and drawing for site clearance" of the investor Project Management board.
11/10/2017 10:00
The Bid solicitor Project Management board has posted the results of the bidding package Package 7 "Clearing bombs and mines" of the investor Project Management board.
11/10/2017 09:56
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management board has posted 219 of the contractor selection plan, which contains 501 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management board has posted 77 Tender Notices in 75 bidding packages. Among these, 5 Tender Notices were self-invited, and 72 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management board has posted 186 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 186 package, canceled the bid 0 package (among the bidding packages above).
- There are 143 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management board has a relationship with 68 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management board has a relationship with 8 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects