Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Project Managerment Unit for Infrastructure Construction as follows:
- Has relationships with 20 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 71 bidding packages, of which 25 prequalification documents have not found the investment project.
- Has invited bids for 24 packages (with 24 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 71 packages that have not fully posted the contractor selection results. Of these 71 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 8.33%, Construction 37.50%, Consultancy 25.00%, Non-consultancy 12.50%, Mixed 16.67%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,684,547,464,450 VND, of which the total winning bid value is: 1,591,459,912,000 VND.
- The savings rate is: 5.53%.
Data analysis results of DauThau.info software for bid solicitors Project Managerment Unit for Infrastructure Construction as follows:
- Has relationships with 20 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 8.33%, Construction 37.50%, Consulting 25.00%, Non-consulting 12.50%, Mixed 16.67%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,684,547,464,450 VND, in which the total winning value is: 1,591,459,912,000 VND.
- The savings rate is: 5.53%.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the request Improvement of Tuan Cung River - Nghi Son Economic Zone of the investor Project Managerment Unit for Infrastructure Construction with 4 bidding package.
18/05/2017 10:33
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 03: Construction insurance of the investor Project Managerment Unit for Infrastructure Construction.
08/05/2017 07:41
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Tender package No 5: Construction and equipment installation of the investor Project Managerment Unit for Infrastructure Construction with the form Open bidding (Only select domestic contractors).
27/03/2017 15:19
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Package 03: Construction insurance of the investor Project Managerment Unit for Infrastructure Construction with the form Open bidding (Only select domestic contractors).
22/03/2017 16:08
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 13: Construction and installation of additional items (Rainwater drainage route and road improvement HY5, HY6) of the investor Project Managerment Unit for Infrastructure Construction.
30/12/2016 14:52
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package No. 1: Consulting, Surveying, setting up TKB VTC - Estimation, construction and installation (EC) of the investor Project Managerment Unit for Infrastructure Construction.
28/12/2016 09:22
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package No. 8: Construction and installation of items: Crossroads at Km234 +053 of the investor Project Managerment Unit for Infrastructure Construction.
26/12/2016 14:20
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Construction of the remaining volume is under package 7 (section from Km1+318.42-Km3+114.28) and package number 8 (section from Km3+114.28-Km3+581.44; Km4+). 200 - Km4+321.05) of the investor Project Managerment Unit for Infrastructure Construction.
02/12/2016 15:46
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 1: Consulting survey, making feasibility study report for construction investment and site clearance, project: Investment in construction of main traffic routes connecting Western industrial zones - Economic zone Nghi Son economy of the investor Project Managerment Unit for Infrastructure Construction.
23/11/2016 15:53
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Tender package No 8: Construction and installation of items: Crossroads at Km234 +053 of the investor Project Managerment Unit for Infrastructure Construction with the form National competitive bidding.
23/11/2016 14:29
The data sheet has been partially hidden, to see the full information please Login or Register
Project Managerment Unit for Infrastructure Construction publishes the plan Improvement of Tuan Cung River - Nghi Son Economic Zone with 4 bidding package .
18/05/2017 10:33
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Package 03: Construction insurance .
- Winning bidder: Tổng Công ty Bảo hiểm PVI, Công ty cổ phần bảo hiểm Viễn Đông
08/05/2017 07:41
Project Managerment Unit for Infrastructure Construction publishes Tender Notice Tender package No 5: Construction and equipment installation in the form Open bidding (Only select domestic contractors) .
27/03/2017 15:19
Project Managerment Unit for Infrastructure Construction publishes Tender Notice Package 03: Construction insurance in the form Open bidding (Only select domestic contractors) .
22/03/2017 16:08
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Package 13: Construction and installation of additional items (Rainwater drainage route and road improvement HY5, HY6) .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VẬN TẢI ANH CƯỜNG, CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI LONG THÀNH ĐẠT
30/12/2016 14:52
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Package No. 1: Consulting, Surveying, setting up TKB VTC - Estimation, construction and installation (EC) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN KIỂM ĐỊNH VÀ XÂY DỰNG THỊNH PHÁT, CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG PHÚ, Liên danh công ty cổ phần tập đoàn xây dựng Miền Trung - Công ty cổ phần tư vấn kiểm định và xây dựng Thịnh Phát - Công ty cổ phần tư vấn xây dựng và thương mại Hưng Phú
28/12/2016 09:22
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Package No. 8: Construction and installation of items: Crossroads at Km234 +053 .
- Winning bidder: Công ty cổ phần đường sắt Thanh Hóa
26/12/2016 14:20
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Construction of the remaining volume is under package 7 (section from Km1+318.42-Km3+114.28) and package number 8 (section from Km3+114.28-Km3+581.44; Km4+). 200 - Km4+321.05) .
- Winning bidder: Tổng công ty cổ phần đầu tư xây dựng Minh Tuấn
02/12/2016 15:46
Project Managerment Unit for Infrastructure Construction announced the results of the bid package Package 1: Consulting survey, making feasibility study report for construction investment and site clearance, project: Investment in construction of main traffic routes connecting Western industrial zones - Economic zone Nghi Son economy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VINASEAN, Liên danh Công ty cổ phần Việt Thanh - Công ty cổ phần tư vấn xây dựng Vinasean
23/11/2016 15:53
Project Managerment Unit for Infrastructure Construction publishes Tender Notice Tender package No 8: Construction and installation of items: Crossroads at Km234 +053 in the form National competitive bidding .
23/11/2016 14:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the request Improvement of Tuan Cung River - Nghi Son Economic Zone of the investor Project Managerment Unit for Infrastructure Construction with 4 bidding package.
18/05/2017 10:33
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 03: Construction insurance of the investor Project Managerment Unit for Infrastructure Construction.
08/05/2017 07:41
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Tender package No 5: Construction and equipment installation of the investor Project Managerment Unit for Infrastructure Construction with the form Open bidding (Only select domestic contractors).
27/03/2017 15:19
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Package 03: Construction insurance of the investor Project Managerment Unit for Infrastructure Construction with the form Open bidding (Only select domestic contractors).
22/03/2017 16:08
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 13: Construction and installation of additional items (Rainwater drainage route and road improvement HY5, HY6) of the investor Project Managerment Unit for Infrastructure Construction.
30/12/2016 14:52
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package No. 1: Consulting, Surveying, setting up TKB VTC - Estimation, construction and installation (EC) of the investor Project Managerment Unit for Infrastructure Construction.
28/12/2016 09:22
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package No. 8: Construction and installation of items: Crossroads at Km234 +053 of the investor Project Managerment Unit for Infrastructure Construction.
26/12/2016 14:20
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Construction of the remaining volume is under package 7 (section from Km1+318.42-Km3+114.28) and package number 8 (section from Km3+114.28-Km3+581.44; Km4+). 200 - Km4+321.05) of the investor Project Managerment Unit for Infrastructure Construction.
02/12/2016 15:46
The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted the results of the bidding package Package 1: Consulting survey, making feasibility study report for construction investment and site clearance, project: Investment in construction of main traffic routes connecting Western industrial zones - Economic zone Nghi Son economy of the investor Project Managerment Unit for Infrastructure Construction.
23/11/2016 15:53
Bid solicitor Project Managerment Unit for Infrastructure Construction has posted Tender Notice Tender package No 8: Construction and installation of items: Crossroads at Km234 +053 of the investor Project Managerment Unit for Infrastructure Construction with the form National competitive bidding.
23/11/2016 14:29
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Managerment Unit for Infrastructure Construction has posted 25 of the contractor selection plan, which contains 71 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted 24 Tender Notice in the 24 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Managerment Unit for Infrastructure Construction has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Managerment Unit for Infrastructure Construction has a relationship with 20 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Managerment Unit for Infrastructure Construction is an investor with 20 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code