Data analysis results of DauThau.info software for bid solicitors Project management traffic Phu Tho as follows:
- Has relationships with 3 project owners.
- Has relationships with 146 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 77 contractor selection plans with a total of 246 bidding packages, of which 24 prequalification documents have not found the investment project.
- Has invited bids for 128 packages (with 145 tender notices), and conducted prequalification for 0 packages.
- There are 8 bidding packages with content that needs clarification.
- Announced the results of 235 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 112 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 70 packages that have not fully posted the contractor selection results. Of these 69 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.84 contractors.
- Breakdown by bidding field: Goods 2.76%, Construction 46.90%, Consultancy 31.72%, Non-consultancy 18.62%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,319,646,253,630 VND, of which the total winning bid value is: 3,203,119,749,480 VND.
- The savings rate is: 3.51%.
Data analysis results of DauThau.info software for bid solicitors Project management traffic Phu Tho as follows:
- Has relationships with 146 contractor.
- The average number of contractors participating in each bidding package is: 1.84 contractors.
- Proportion of bidding fields: Goods 2.76%, Construction 46.90%, Consulting 31.72%, Non-consulting 18.62%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,319,646,253,630 VND, in which the total winning value is: 3,203,119,749,480 VND.
- The savings rate is: 3.51%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project management traffic Phu Tho are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 6 contractor selection plans, of which 6 were self-published, and 0 were published by other entities.
- Is the investor of 42 Tender Notices, of which 33 were self-invited, and 9 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 94.83% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.67% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Phú Thọ (3)
- Provinces before the merger where the contractor has participated in bidding : Phú Thọ (3)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 12 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package No. 01: Consulting on making tasks, estimates for surveying, design and design for construction investment research reports of the investor Project management traffic Phu Tho.
29/03/2025 10:49
The Bid solicitor Project management traffic Phu Tho has posted the request The contractor selection plan package 01: Consulting on making tasks, cost estimates of surveys, designs for making a report of construction investment and construction, projects: reinforcing, upgrading dykes, crucial embankments and a flood partition system of Ta dike, Huu Song Thao (combining Highway 2D and 32C) of the investor Project management traffic Phu Tho with 1 bidding package.
26/03/2025 13:36
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho.
19/11/2024 15:09
Bid solicitor Project management traffic Phu Tho has posted Tender Notice Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho with the form Competitive Offer.
06/11/2024 15:17
The Bid solicitor Project management traffic Phu Tho has posted the request Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho with 1 bidding package.
04/11/2024 08:24
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 10: Insurance for construction of work items Relocating power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:17
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 09: Construction supervision of work items Moving power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:11
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 08: Construction of work items Relocating power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:04
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 05: Consulting for environmental monitoring and supervision during construction of the investor Project management traffic Phu Tho.
26/08/2022 08:06
The Bid solicitor Project management traffic Phu Tho has posted the request Roads connecting from provincial road 323 to national highway 2, Phu Ninh district, Phu Tho province of the investor Project management traffic Phu Tho with 4 bidding package.
24/08/2022 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
Project management traffic Phu Tho announced the results of the bid package Package No. 19: Construction insurance .
- Winning bidder: Sai Gon Ha Noi Insurance Corpration, Tổng công ty Cổ phần Bảo hiểm Hàng không
10/06/2025 16:34
Project management traffic Phu Tho announced the results of the bid package Package No. 01: Consulting on making tasks, estimates for surveying, design and design for construction investment research reports .
- Winning bidder: HA NOI SURVEY AND CONSTRUCTION JOINT STOCK COMPANY
29/03/2025 10:49
Project management traffic Phu Tho publishes the plan The contractor selection plan package 01: Consulting on making tasks, cost estimates of surveys, designs for making a report of construction investment and construction, projects: reinforcing, upgrading dykes, crucial embankments and a flood partition system of Ta dike, Huu Song Thao (combining Highway 2D and 32C) with 1 bidding package .
26/03/2025 13:36
Project management traffic Phu Tho announced the results of the bid package Package No. 01: Procurement of materials, audio equipment, meeting room screen .
- Winning bidder: SÔNG LAM TRADING AND SERVICE COMPANY LIMITED
21/03/2025 15:54
Project management traffic Phu Tho announced the results of the bidding package Tender package No 01: Procurement of materials, audio equipment, meeting room screen with 2 participating contractors .
28/02/2025 14:26
Project management traffic Phu Tho announced the results of the bid package Package 17: Construction supervision consultancy .
- Winning bidder: THANG LONG ENGINEERING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
24/02/2025 08:52
Project management traffic Phu Tho announced the results of the bid package Package No. 54: Consulting on surveying, preparing construction drawing designs, construction estimates and placing piles for site clearance for extended routes .
- Winning bidder: PHUTHAI CONSULTANCY JOINT STOCK COMPANY
21/02/2025 15:42
Project management traffic Phu Tho publishes Tender Notice Tender package No 01: Procurement of materials, audio equipment, meeting room screen in the form Competitive Offer .
21/02/2025 13:24
Project management traffic Phu Tho announced the results of the bid package Package 16: Construction work .
- Winning bidder: Tư Lâp Contruction Company Limited
18/02/2025 16:51
Project management traffic Phu Tho announced the results of the bidding package Tender package No 19: Construction insurance with 5 participating contractors .
17/02/2025 11:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package No. 01: Consulting on making tasks, estimates for surveying, design and design for construction investment research reports of the investor Project management traffic Phu Tho.
29/03/2025 10:49
The Bid solicitor Project management traffic Phu Tho has posted the request The contractor selection plan package 01: Consulting on making tasks, cost estimates of surveys, designs for making a report of construction investment and construction, projects: reinforcing, upgrading dykes, crucial embankments and a flood partition system of Ta dike, Huu Song Thao (combining Highway 2D and 32C) of the investor Project management traffic Phu Tho with 1 bidding package.
26/03/2025 13:36
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho.
19/11/2024 15:09
Bid solicitor Project management traffic Phu Tho has posted Tender Notice Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho with the form Competitive Offer.
06/11/2024 15:17
The Bid solicitor Project management traffic Phu Tho has posted the request Purchased 01 new 07-seat car with 02 axles to serve the general work of the Management Board of investment and construction projects for traffic, civil and industrial works in Phu Tho province of the investor Project management traffic Phu Tho with 1 bidding package.
04/11/2024 08:24
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 10: Insurance for construction of work items Relocating power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:17
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 09: Construction supervision of work items Moving power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:11
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 08: Construction of work items Relocating power lines and substations for site clearance for project implementation of the investor Project management traffic Phu Tho.
22/09/2022 11:04
The Bid solicitor Project management traffic Phu Tho has posted the results of the bidding package Package 05: Consulting for environmental monitoring and supervision during construction of the investor Project management traffic Phu Tho.
26/08/2022 08:06
The Bid solicitor Project management traffic Phu Tho has posted the request Roads connecting from provincial road 323 to national highway 2, Phu Ninh district, Phu Tho province of the investor Project management traffic Phu Tho with 4 bidding package.
24/08/2022 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project management traffic Phu Tho has posted 77 of the contractor selection plan, which contains 246 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project management traffic Phu Tho has posted 145 Tender Notices in 128 bidding packages. Among these, 34 Tender Notices were self-invited, and 111 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project management traffic Phu Tho has posted 235 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 235 package, canceled the bid 0 package (among the bidding packages above).
- There are 112 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project management traffic Phu Tho has a relationship with 146 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project management traffic Phu Tho has a relationship with 47 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project management traffic Phu Tho has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects