Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors QL53 LONG HO BA SI BOT INVESTMENT CORPORATION as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 20 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 20 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors QL53 LONG HO BA SI BOT INVESTMENT CORPORATION as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
QL53 LONG HO BA SI BOT INVESTMENT CORPORATION publishes the plan Construction investment project to upgrade and renovate National Highway 53, section Long Ho - Ba Si, in Vinh Long and Tra Vinh provinces (including Nga Tu bridge) in the form of BOT contract with 0 bidding package .
27/11/2017 15:19
QL53 LONG HO BA SI BOT INVESTMENT CORPORATION publishes the plan Construction investment project to upgrade and renovate National Highway 53, section Long Ho - Ba Si, in Vinh Long and Tra Vinh provinces (including Nga Tu bridge) in the form of BOT contract with 10 bidding package .
27/11/2017 14:22
QL53 LONG HO BA SI BOT INVESTMENT CORPORATION publishes the plan Invest in construction of works to upgrade and renovate National Highway 53, section Long Ho - Ba Si in Vinh Long and Tra Vinh provinces (including Nga Tu bridge) in the form of Build - Operate - Transfer Contract (BOT) with 10 bidding package .
27/11/2017 10:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s QL53 LONG HO BA SI BOT INVESTMENT CORPORATION has posted 3 of the contractor selection plan, which contains 20 of the bidding package. See full list here
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects