Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors SCI E&C JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 10 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,310,000,000 VND, of which the total winning bid value is: 1,442,000,000 VND.
- The savings rate is: 37.58%.
Data analysis results of DauThau.info software for bid solicitors SCI E&C JOINT STOCK COMPANY as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,310,000,000 VND, in which the total winning value is: 1,442,000,000 VND.
- The savings rate is: 37.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor SCI E&C JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 1 contractor selection plans, of which 1 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 7 bidding packages, of which 4 were won, 3 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 86.4% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.47% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Huế (2), Hưng Yên (1), Khánh Hòa (1), Đồng Nai (1), Quảng Trị (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Huế (2), Hưng Yên (1), Ninh Thuận (1), Đồng Nai (1), Quảng Trị (1), Undefined (1)
- Has relationships with 6 Bid Solicitors
- Has competed against 25 contractors in 4 bidding packages, won 1 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 8 contractors in 4 bidding packages, won 3 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN SCI E&C
- Code of capacity certificate of construction activities: 00009600
- Issuer: Sở kế hoạch và đầu tư Thành phố Hà Nội
- Fields:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Giao thông (đường bộ)
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Thủy lợi
⚬ Thi công xây dựng công trình: Công nghiệp trừ công trình thủy điện
⚬ Thi công xây dựng công trình: Công nghiệp Đường dây & TBA
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted the results of the bidding package Supply 01 self-propelled crawler crane with load from 40-50 tons (Quality 80%) of the investor SCI E&C JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần ENTECO Việt Nam
24/10/2014 09:59
The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted the request Investment project to improve construction equipment capacity in 2014 - Phase3 of the investor SCI E&C JOINT STOCK COMPANY with 10 bidding package.
02/10/2014 11:44
The data sheet has been partially hidden, to see the full information please Login or Register
SCI E&C JOINT STOCK COMPANY announced the results of the bid package Supply 01 self-propelled crawler crane with load from 40-50 tons (Quality 80%) .
- Winning bidder: Công ty cổ phần ENTECO Việt Nam
24/10/2014 09:59
SCI E&C JOINT STOCK COMPANY publishes the plan Investment project to improve construction equipment capacity in 2014 - Phase3 with 10 bidding package .
02/10/2014 11:44
SCI E&C JOINT STOCK COMPANY publishes Tender Notice Provide 01 vibrating roller in the form National Competitive Bidding .
13/02/2014 08:46
SCI E&C JOINT STOCK COMPANY publishes Tender Notice Supply 01 wheel excavator with bucket capacity from 0.70 to 0.75 m3 in the form National competitive bidding .
11/02/2014 08:43
SCI E&C JOINT STOCK COMPANY publishes Tender Notice Provide 5 dump trucks 15-22 tons in the form National competitive bidding .
03/05/2013 16:31
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted the results of the bidding package Supply 01 self-propelled crawler crane with load from 40-50 tons (Quality 80%) of the investor SCI E&C JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần ENTECO Việt Nam
24/10/2014 09:59
The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted the request Investment project to improve construction equipment capacity in 2014 - Phase3 of the investor SCI E&C JOINT STOCK COMPANY with 10 bidding package.
02/10/2014 11:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SCI E&C JOINT STOCK COMPANY has posted 1 of the contractor selection plan, which contains 10 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted 3 Tender Notices in 3 bidding packages. Among these, 0 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SCI E&C JOINT STOCK COMPANY has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SCI E&C JOINT STOCK COMPANY has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity SCI E&C JOINT STOCK COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects