Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 100 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 76 contractor selection plans with a total of 70 bidding packages, of which 76 prequalification documents have not found the investment project.
- Has invited bids for 78 packages (with 81 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 57 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 18 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.15 contractors.
- Breakdown by bidding field: Goods 65.43%, Construction 17.28%, Consultancy 6.17%, Non-consultancy 7.41%, Mixed 3.70%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 116,833,124,799 VND, of which the total winning bid value is: 101,056,907,542 VND.
- The savings rate is: 13.50%.
Data analysis results of DauThau.info software for bid solicitors SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY as follows:
- Has relationships with 100 contractor.
- The average number of contractors participating in each bidding package is: 3.15 contractors.
- Proportion of bidding fields: Goods 65.43%, Construction 17.28%, Consulting 6.17%, Non-consulting 7.41%, Mixed 3.70%, Other 0%.
- The total value according to the bidding package with valid IMP is: 116,833,124,799 VND, in which the total winning value is: 101,056,907,542 VND.
- The savings rate is: 13.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 75 contractor selection plans, of which 70 were self-published, and 5 were published by other entities.
- Is the investor of 70 Tender Notices, of which 66 were self-invited, and 4 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 48 bidding packages, of which 30 were won, 17 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 53.99% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 85.65% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (10), Đà Nẵng (8), Quảng Ngãi (8), Đồng Nai (4), Nghệ An (3), Lâm Đồng (3), Quảng Trị (2), Vĩnh Long (2), Lai Châu (1), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (8), Gia Lai (8), Quảng Ngãi (7), Nghệ An (3), Bình Định (2), Quảng Trị (2), Lâm Đồng (2), Trà Vinh (2), Bình Phước (2), Đồng Nai (1), Kon Tum (1), Lai Châu (1), Đắk Nông (1), Undefined (8)
- Has relationships with 24 Bid Solicitors
- Has competed against 55 contractors in 27 bidding packages, won 9 packages, lost 17 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 8 contractors in 9 bidding packages, won 5 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 26 bidding packages with 27 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Tender package No 01: Treatment of downstream riverbed of Se San 3A hydropower plant - Phase 2 in the form Open bidding .
27/11/2025 09:24
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Provide equipment and install configuration to enhance the information security system security of Se San 3A hydroelectric plant .
- Winning bidder: VIDANA TECHNOLOGICAL DEVELOPMENT COMPANY LIMITTED
26/11/2025 16:20
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan Package No. 01: Treatment of downstream riverbed of Se San 3A hydropower plant - Phase 2 with 1 bidding package .
17/10/2025 14:40
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Bidding package to buy supplies for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 .
- Winning bidder: HUDE VIETNAM COMPANY LIMITED
13/10/2025 16:35
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Provide equipment and install configuration to enhance the information security system security of Se San 3A hydroelectric plant in the form Competitive Offer .
30/09/2025 13:32
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Supply and install information and transmission equipment to operate the water discharge of Se San 3A hydroelectric plant in the form Competitive Offer .
30/09/2025 10:51
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Bidding package to buy supplies for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 in the form Open bidding .
18/09/2025 08:58
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan Plan for contractor selection package to supply equipment and install configuration to enhance the security of the information system of Se San 3A hydroelectric plant with 1 bidding package .
09/09/2025 09:47
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan The plan to select contractors to buy materials for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 with 1 bidding package .
09/09/2025 09:18
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan The plan to select contractors to buy materials for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 with 1 bidding package .
08/09/2025 13:37
The data sheet has been partially hidden, to see the full information please Login or Register
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Monitoring the situation of sedimentation and landslides on the lake, reservoir - cycle 4 and monitoring of the work of the building - cycle of 4 San San 3a hydropower plants .
- Winning bidder: THONG VIET CONSTRUCTION CONSULTING JOINT STOCK COMPANY
28/08/2025 15:06
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bidding package Monitoring the situation of sedimentation and landslides on the lake, reservoir - cycle 4 and monitoring of the work of the building - cycle of 4 San San 3a hydropower plants with 3 participating contractors .
21/07/2025 11:19
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Package No. 01: Handling the right shoulder landslide on the lower side of Se San 3A hydroelectric project .
- Winning bidder: CÔNG TY TNHH HƯNG TÍN
01/07/2025 13:44
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Monitoring the situation of sedimentation and landslides on the lake, reservoir - cycle 4 and monitoring of the work of the building - cycle of 4 San San 3a hydropower plants in the form Open bidding .
30/06/2025 17:00
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan Monitoring the situation of sedimentation and landslides on the lake, reservoir - cycle 4 and monitoring of the work of the building - cycle of 4 San San 3a hydropower plants with 1 bidding package .
19/06/2025 08:09
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bidding package Tender package No 01: Handling the right shoulder landslide on the lower side of Se San 3A hydroelectric project with 2 participating contractors .
25/04/2025 14:13
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Equipped with 7-seat cars to serve production and business activities .
- Winning bidder: CITY AUTO CORPORATION
25/04/2025 11:03
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bidding package Tender package No 01: Handling the upper river of Se San 3A hydroelectric plant - phase 2 with 2 participating contractors .
23/04/2025 09:09
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Tender package No 01: Handling the right shoulder landslide on the lower side of Se San 3A hydroelectric project in the form Open bidding .
16/04/2025 10:45
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bidding package Equipped with 7-seat cars to serve production and business activities with 2 participating contractors .
14/04/2025 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Tender package No 01: Treatment of downstream riverbed of Se San 3A hydropower plant - Phase 2 in the form Open bidding .
27/11/2025 09:24
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Provide equipment and install configuration to enhance the information security system security of Se San 3A hydroelectric plant .
- Winning bidder: VIDANA TECHNOLOGICAL DEVELOPMENT COMPANY LIMITTED
26/11/2025 16:20
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan Package No. 01: Treatment of downstream riverbed of Se San 3A hydropower plant - Phase 2 with 1 bidding package .
17/10/2025 14:40
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY announced the results of the bid package Bidding package to buy supplies for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 .
- Winning bidder: HUDE VIETNAM COMPANY LIMITED
13/10/2025 16:35
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Provide equipment and install configuration to enhance the information security system security of Se San 3A hydroelectric plant in the form Competitive Offer .
30/09/2025 13:32
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Supply and install information and transmission equipment to operate the water discharge of Se San 3A hydroelectric plant in the form Competitive Offer .
30/09/2025 10:51
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes Tender Notice Bidding package to buy supplies for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 in the form Open bidding .
18/09/2025 08:58
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan Plan for contractor selection package to supply equipment and install configuration to enhance the security of the information system of Se San 3A hydroelectric plant with 1 bidding package .
09/09/2025 09:47
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan The plan to select contractors to buy materials for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 with 1 bidding package .
09/09/2025 09:18
SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY publishes the plan The plan to select contractors to buy materials for repair and maintenance of H1, H2 H2 San San 3A hydroelectric plant in 2026 with 1 bidding package .
08/09/2025 13:37
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has posted 76 of the contractor selection plan, which contains 70 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has posted 81 Tender Notices in 78 bidding packages. Among these, 54 Tender Notices were self-invited, and 27 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has posted 57 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 57 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has a relationship with 100 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects