Data analysis results of DauThau.info software for bid solicitors THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 as follows:
- Has relationships with 1 project owners.
- Has relationships with 79 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 38 contractor selection plans with a total of 66 bidding packages, of which 37 prequalification documents have not found the investment project.
- Has invited bids for 63 packages (with 76 tender notices), and conducted prequalification for 0 packages.
- There are 10 bidding packages with content that needs clarification.
- Announced the results of 60 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.25 contractors.
- Breakdown by bidding field: Goods 0%, Construction 13.16%, Consultancy 68.42%, Non-consultancy 9.21%, Mixed 9.21%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,966,755,971,550 VND, of which the total winning bid value is: 1,502,777,064,662 VND.
- The savings rate is: 23.59%.
Data analysis results of DauThau.info software for bid solicitors THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 as follows:
- Has relationships with 79 contractor.
- The average number of contractors participating in each bidding package is: 2.25 contractors.
- Proportion of bidding fields: Goods 0%, Construction 13.16%, Consulting 68.42%, Non-consulting 9.21%, Mixed 9.21%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,966,755,971,550 VND, in which the total winning value is: 1,502,777,064,662 VND.
- The savings rate is: 23.59%.
This Bid solicitor is also an investor. The analysis results of data for the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 34 contractor selection plans, of which 31 were self-published, and 3 were published by other entities.
- Is the investor of 77 Tender Notices, of which 73 were self-invited, and 4 were invited by other entities.
- Name of construction organization: BAN QUẢN LÝ DỰ ÁN NHIỆT ĐIỆN 3 - CHI NHÁNH CÔNG TY TNHH MTV TỔNG CÔNG TY PHÁT ĐIỆN 1
- Code of capacity certificate of construction activities: 00051190
- Issuer:
- Fields:
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp năng lượng (nhiệt điện)
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp năng lượng (nhiệt điện)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package Package No. 05TV-GSTTT-2024: Audit consulting on completed project settlement report of Phase 1 - Investment project, installation of online coal volume measurement system at conveyor lines BC1A/B wharf No. 1, 2 and online coal analysis system at wharf No. 1 and wharf No. 2 of Duyen Hai Power Center of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED
14/05/2026 14:01
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 01TV-SXKD-2025: Providing auditing consulting services to finalize the cost of dredging and maintenance of Duyen Hai Power Center in 2024 and 2025 .
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED
14/11/2025 14:00
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package SXKD2023NVDT-02: Construction of dredging and maintenance of Seaport items, cooling water receiving channel of Duyen Hai Power Center in 2023 and Dredging of anchorage area under construction investment project of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: PHU XUAN CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
10/10/2025 09:29
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes Tender Notice 01TV-SXKD-2025: Providing auditing consulting services to finalize the cost of dredging and maintenance of Duyen Hai Power Center in 2024 and 2025 in the form Open bidding .
01/10/2025 15:45
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes the plan Contractor selection plan (phase 1- Corporation) Electricity production in 2025 - Thermal Power Project Management Board 3 with 1 bidding package .
25/09/2025 14:03
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes the plan Contractor selection plan (phase 1- Corporation) Electricity production in 2025 - Thermal Power Project Management Board 3 with 1 bidding package .
25/09/2025 11:26
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 02TV-CBDA-DCSNS1-2025: Consulting on verification of the BCNCKT project upgrade the DCS control system and the control systems-NMDD 1 of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: ENTECH INVESTMENT JOINT STOCK COMPANY
29/08/2025 14:53
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 02TV-CBDA-XLKTDH1 & DH3-2025: Advice on verification of the BCNCKT project upgrade and renovate the emissions treatment system of Duyen Hai 1 and upgrade project of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4
29/07/2025 16:17
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 01TV-CBDA-DODH3 & DH3MR-2025: Survey consultancy, establishment of BcKTKT, E-E-E-Preliminary Invitation for Construction Package-Project "Investment and conversion of HFO oil fuel to oil due to Duyen Hai 3 and Duyen 3 expansion" of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 15:54
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 01TV-CBDA-DCSNS1-2025: Consulting survey, preparation of BCNCKT and preparing bidding documents, evaluating bids and supporting the negotiation of bidding package for construction of DCS control systems and subcontractive stations control systems-Nghi Son 1 of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package Package No. 05TV-GSTTT-2024: Audit consulting on completed project settlement report of Phase 1 - Investment project, installation of online coal volume measurement system at conveyor lines BC1A/B wharf No. 1, 2 and online coal analysis system at wharf No. 1 and wharf No. 2 of Duyen Hai Power Center .
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED
14/05/2026 14:01
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package SXKD2023NVDT-02: Construction of dredging and maintenance of Seaport items, cooling water receiving channel of Duyen Hai Power Center in 2023 and Dredging of anchorage area under construction investment project .
- Winning bidder: PHU XUAN CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
10/10/2025 09:29
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 02TV-CBDA-DCSNS1-2025: Consulting on verification of the BCNCKT project upgrade the DCS control system and the control systems-NMDD 1 .
- Winning bidder: ENTECH INVESTMENT JOINT STOCK COMPANY
29/08/2025 14:53
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 02TV-CBDA-XLKTDH1 & DH3-2025: Advice on verification of the BCNCKT project upgrade and renovate the emissions treatment system of Duyen Hai 1 and upgrade project .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4
29/07/2025 16:17
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 01TV-CBDA-DODH3 & DH3MR-2025: Survey consultancy, establishment of BcKTKT, E-E-E-Preliminary Invitation for Construction Package-Project "Investment and conversion of HFO oil fuel to oil due to Duyen Hai 3 and Duyen 3 expansion" .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 15:54
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 01TV-CBDA-DCSNS1-2025: Consulting survey, preparation of BCNCKT and preparing bidding documents, evaluating bids and supporting the negotiation of bidding package for construction of DCS control systems and subcontractive stations control systems-Nghi Son 1 .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 10:47
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package Bidding package No. 04TV-GTTT-2024: Supervision consultancy and examination of technical design, TKBVTC in phase 1-Investment project, installation of online coal mass measurement system at BC1A/B BC1A/B Ben Cau Tap routes No. 1 and 2 and online coal analysis system at Harbor No. 1 and Harbor No. 2 of Duyen Hai LLD .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 09:54
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package Bidding package No. 03EPC-GSTTT-2024: Designing, supplying equipment and supplies and construction of 04 coal mass measurement systems and monitoring data transmission systems in phase 1-Investment project, installing online coal measurement system at BC1A/B Cau Harbor Conveyor routes No. 1 and 2 (including construction and installation insurance) .
- Winning bidder: HAI ANH TRADING AND TECHNOLOGIES JOINT STOCK COMPANY, VCAPITAL INVESTMENT AND TECHNOLOGY JOINT STOCK COMPANY
11/07/2025 14:15
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package Bidding package No. 08XL-SCL-2025: Construction and dredging of general channels, wharf No. 4 of Duyen Hai Seague Port for the period 2 from 2025 .
- Winning bidder: TPL INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
04/07/2025 15:13
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 01TV-CBDA-XLKTDH1 & DH3-2025: Consulting surveys, making BCNCKT, Making Bidding Bidding, evaluating Bidders and supporting negotiation for contract construction package for upgrading and renovating emissions treatment systems of Duyen Hai 1 and upgrading and improving the emissions treatment system of Duyen Hai 3 NM. .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
04/07/2025 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package Package No. 05TV-GSTTT-2024: Audit consulting on completed project settlement report of Phase 1 - Investment project, installation of online coal volume measurement system at conveyor lines BC1A/B wharf No. 1, 2 and online coal analysis system at wharf No. 1 and wharf No. 2 of Duyen Hai Power Center of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED
14/05/2026 14:01
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 announced the results of the bid package 01TV-SXKD-2025: Providing auditing consulting services to finalize the cost of dredging and maintenance of Duyen Hai Power Center in 2024 and 2025 .
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED
14/11/2025 14:00
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package SXKD2023NVDT-02: Construction of dredging and maintenance of Seaport items, cooling water receiving channel of Duyen Hai Power Center in 2023 and Dredging of anchorage area under construction investment project of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: PHU XUAN CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
10/10/2025 09:29
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes Tender Notice 01TV-SXKD-2025: Providing auditing consulting services to finalize the cost of dredging and maintenance of Duyen Hai Power Center in 2024 and 2025 in the form Open bidding .
01/10/2025 15:45
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes the plan Contractor selection plan (phase 1- Corporation) Electricity production in 2025 - Thermal Power Project Management Board 3 with 1 bidding package .
25/09/2025 14:03
THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 publishes the plan Contractor selection plan (phase 1- Corporation) Electricity production in 2025 - Thermal Power Project Management Board 3 with 1 bidding package .
25/09/2025 11:26
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 02TV-CBDA-DCSNS1-2025: Consulting on verification of the BCNCKT project upgrade the DCS control system and the control systems-NMDD 1 of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: ENTECH INVESTMENT JOINT STOCK COMPANY
29/08/2025 14:53
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 02TV-CBDA-XLKTDH1 & DH3-2025: Advice on verification of the BCNCKT project upgrade and renovate the emissions treatment system of Duyen Hai 1 and upgrade project of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4
29/07/2025 16:17
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 01TV-CBDA-DODH3 & DH3MR-2025: Survey consultancy, establishment of BcKTKT, E-E-E-Preliminary Invitation for Construction Package-Project "Investment and conversion of HFO oil fuel to oil due to Duyen Hai 3 and Duyen 3 expansion" of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 15:54
The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted the results of the bidding package 01TV-CBDA-DCSNS1-2025: Consulting survey, preparation of BCNCKT and preparing bidding documents, evaluating bids and supporting the negotiation of bidding package for construction of DCS control systems and subcontractive stations control systems-Nghi Son 1 of the investor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
17/07/2025 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted 38 of the contractor selection plan, which contains 66 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted 76 Tender Notices in 63 bidding packages. Among these, 76 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has posted 60 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 60 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has a relationship with 79 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has a relationship with 33 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects