Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND XÃ ĐAK SMAR as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 9 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 8 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 8 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ ĐAK SMAR as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND XÃ ĐAK SMAR are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 13 contractor selection plans, of which 13 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Road to village production area (Cam village).
12/03/2025 16:16
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Road to village production area (Cam village) of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
12/03/2025 16:08
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Kroi village cultural house of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:11
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Maintenance of roads in Kroi village, Village 1 (Dakkmung village), Village 2 of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:10
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Kroi village cultural house of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:07
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Kroi village cultural house.
27/11/2024 09:09
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Maintenance of roads in Kroi village, Village 1 (Dakkmung village), Village 2.
27/11/2024 09:09
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Construction contractor selection plan: Road to village 1 production area (9 sao area); Category: Foundation, road surface, drainage system of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
10/09/2024 10:03
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Road to village 1 production area (9 sao area).
10/09/2024 09:09
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Commune Center Stadium. Items: Stage, earth embankment, gate, garage of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
15/07/2024 09:26
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ ĐAK SMAR publishes the plan Road to village production area (Cam village) with 1 bidding package .
12/03/2025 16:08
UBND XÃ ĐAK SMAR publishes the plan Kroi village cultural house with 1 bidding package .
27/11/2024 10:11
UBND XÃ ĐAK SMAR publishes the plan Maintenance of roads in Kroi village, Village 1 (Dakkmung village), Village 2 with 1 bidding package .
27/11/2024 10:10
UBND XÃ ĐAK SMAR publishes the plan Kroi village cultural house with 1 bidding package .
27/11/2024 10:07
UBND XÃ ĐAK SMAR publishes the plan Construction contractor selection plan: Road to village 1 production area (9 sao area); Category: Foundation, road surface, drainage system with 1 bidding package .
10/09/2024 10:03
UBND XÃ ĐAK SMAR publishes the plan Commune Center Stadium. Items: Stage, earth embankment, gate, garage with 1 bidding package .
15/07/2024 09:26
UBND XÃ ĐAK SMAR publishes the plan Commune Center Stadium. Items: Stage, earth embankment, gate, garage with 1 bidding package .
09/07/2024 10:50
UBND XÃ ĐAK SMAR publishes the plan Road to village 1 production area (Dakkmung village) with 1 bidding package .
09/07/2024 10:34
UBND XÃ ĐAK SMAR publishes the plan Kroi village internal road project. Category: Drainage ditch repair with 1 bidding package .
09/07/2024 10:14
UBND XÃ ĐAK SMAR publishes the plan Kroi village internal road project. Category: Drainage ditch repair with 1 bidding package .
09/07/2024 10:14
The data sheet has been partially hidden, to see the full information please Login or Register
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Road to village production area (Cam village).
12/03/2025 16:16
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Road to village production area (Cam village) of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
12/03/2025 16:08
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Kroi village cultural house of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:11
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Maintenance of roads in Kroi village, Village 1 (Dakkmung village), Village 2 of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:10
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Kroi village cultural house of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
27/11/2024 10:07
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Kroi village cultural house.
27/11/2024 09:09
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Maintenance of roads in Kroi village, Village 1 (Dakkmung village), Village 2.
27/11/2024 09:09
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Construction contractor selection plan: Road to village 1 production area (9 sao area); Category: Foundation, road surface, drainage system of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
10/09/2024 10:03
Investor UBND XÃ ĐAK SMAR has posted an investment and development project Road to village 1 production area (9 sao area).
10/09/2024 09:09
The Bid solicitor UBND XÃ ĐAK SMAR has posted the request Commune Center Stadium. Items: Stage, earth embankment, gate, garage of the investor UBND XÃ ĐAK SMAR with 1 bidding package.
15/07/2024 09:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND XÃ ĐAK SMAR has posted 13 of the contractor selection plan, which contains 8 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND XÃ ĐAK SMAR has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects