Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VGU Project Management Unit as follows:
- Has relationships with 5 project owners.
- Has relationships with 64 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 80 contractor selection plans with a total of 159 bidding packages, of which 78 prequalification documents have not found the investment project.
- Has invited bids for 97 packages (with 97 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 57 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 104 packages that have not fully posted the contractor selection results. Of these 87 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.72 contractors.
- Breakdown by bidding field: Goods 45.36%, Construction 0%, Consultancy 10.31%, Non-consultancy 43.30%, Mixed 1.03%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 540,312,633,450 VND, of which the total winning bid value is: 272,962,370,232 VND.
- The savings rate is: 49.48%.
Data analysis results of DauThau.info software for bid solicitors VGU Project Management Unit as follows:
- Has relationships with 64 contractor.
- The average number of contractors participating in each bidding package is: 1.72 contractors.
- Proportion of bidding fields: Goods 45.36%, Construction 0%, Consulting 10.31%, Non-consulting 43.30%, Mixed 1.03%, Other 0%.
- The total value according to the bidding package with valid IMP is: 540,312,633,450 VND, in which the total winning value is: 272,962,370,232 VND.
- The savings rate is: 49.48%.
This Bid solicitor is also an investor. The analysis results of data for the investor VGU Project Management Unit are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 1 contractor selection plans, of which 1 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor VGU Project Management Unit has posted an investment and development project Relocating equipment, supplies and management records from the rented premises at Eastern International University to the new campus of Viet Duc University.
30/05/2022 07:00
Bid solicitor VGU Project Management Unit has posted Tender Notice VGU-P38-Y19-G: Procurement of additional equipment and supplies for VGU's laboratories and classrooms of the investor VGU Project Management Unit with the form Competitive Bidding.
08/01/2021 10:08
The Bid solicitor VGU Project Management Unit has posted the request CONTRACTOR SELECTION PLAN FOR 6 MONTHS extension of the project of the investor VGU Project Management Unit with 1 bidding package.
08/01/2021 09:45
Investor VGU Project Management Unit has posted an investment and development project Construction project of Vietnam-Germany University.
08/01/2021 07:00
Investor VGU Project Management Unit has posted an investment and development project Construction project of Vietnam-Germany University.
03/03/2020 07:00
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Procurement of textbooks for VGU library” (Published in the auction newspaper No. 169 dated September 8, 2017) of the investor VGU Project Management Unit.
18/10/2017 09:48
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Procurement of auxiliary equipment and water treatment, automation equipment for Mechatronics and Sensor Technology (MSST)” (Published in bidding newspaper No. 247 on December 26, 2016) of the investor VGU Project Management Unit.
26/12/2016 09:42
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Purchase of equipment for thermal analysis, electromechanical testing and non-destructive testing for Mechanical Engineering” (3 lots) (Posted on bidding newspaper No. 206 dated October 28, 2016) of the investor VGU Project Management Unit.
28/10/2016 10:59
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package Purchase of high-tech processing machines for Global Manufacturing Engineering and Management (GPEM) (Posted on bidding newspaper No. 121 on 30/06/2016) of the investor VGU Project Management Unit.
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HẠT NHÂN NEAD
30/06/2016 07:13
The data sheet has been partially hidden, to see the full information please Login or Register
VGU Project Management Unit announced the results of the bidding package Service of dismantling, transporting, re-installing and calibrating machinery and equipment of Mechanical Engineering (MEN); cargo insurance, installation insurance and 3rd party liability with 2 participating contractors .
16/07/2022 08:54
VGU Project Management Unit announced the results of the bidding package Services for dismantling, transporting, reinstalling, and calibrating specialized machines and systems (1 OD ID cylindrical grinder; 1 ultrafine grinder; 1 Markforged 3D printing system); cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
04/07/2022 09:54
VGU Project Management Unit announced the results of the bidding package Services of dismantling, transporting, reinstalling, calibrating machinery and equipment of the Global Engineering and Production Administration (GPE); cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
04/07/2022 09:20
VGU Project Management Unit announced the results of the bidding package Service of dismantling, transporting, reinstalling, calibrating the electrochemical processing system (ECM PEM600); cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
04/07/2022 09:08
VGU Project Management Unit announced the results of the bidding package Service of dismantling, transporting, reinstalling, calibrating machines and equipment of the fields of Electronic and Computer Engineering – Mechatronics and Sensor Technology – Computational Engineering and Computer Simulation (ECE – MST – COM); cargo insurance services, installation insurance and with 1 participating contractors .
28/06/2022 17:39
VGU Project Management Unit announced the results of the bidding package Service of dismantling, transporting, reinstalling and calibrating machinery and equipment of the fields of Construction Engineering - Architecture - Computer Science - Viet Duc Traffic Research Center (BCE-ARC-CSE) -VGTRC); cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
28/06/2022 15:09
VGU Project Management Unit announced the results of the bidding package Services of dismantling, transporting, reinstalling and calibrating machinery and equipment of the Water Technology, Management and Reuse (WTE) industry; cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
21/06/2022 16:08
VGU Project Management Unit announced the results of the bidding package Services of dismantling, transporting and re-installing library equipment, office equipment and records management; cargo insurance, installation insurance and 3rd party liability with 1 participating contractors .
16/06/2022 16:09
VGU Project Management Unit publishes Tender Notice Services of dismantling, transporting and re-installing library equipment, office equipment and records management; cargo insurance, installation insurance and 3rd party liability in the form National Competitive Bidding .
13/06/2022 14:25
VGU Project Management Unit publishes Tender Notice Services of dismantling, transporting and re-installing library equipment, office equipment and records management; cargo insurance, installation insurance and 3rd party liability in the form National Competitive Bidding .
30/05/2022 14:02
The data sheet has been partially hidden, to see the full information please Login or Register
Investor VGU Project Management Unit has posted an investment and development project Relocating equipment, supplies and management records from the rented premises at Eastern International University to the new campus of Viet Duc University.
30/05/2022 07:00
Bid solicitor VGU Project Management Unit has posted Tender Notice VGU-P38-Y19-G: Procurement of additional equipment and supplies for VGU's laboratories and classrooms of the investor VGU Project Management Unit with the form Competitive Bidding.
08/01/2021 10:08
The Bid solicitor VGU Project Management Unit has posted the request CONTRACTOR SELECTION PLAN FOR 6 MONTHS extension of the project of the investor VGU Project Management Unit with 1 bidding package.
08/01/2021 09:45
Investor VGU Project Management Unit has posted an investment and development project Construction project of Vietnam-Germany University.
08/01/2021 07:00
Investor VGU Project Management Unit has posted an investment and development project Construction project of Vietnam-Germany University.
03/03/2020 07:00
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Procurement of textbooks for VGU library” (Published in the auction newspaper No. 169 dated September 8, 2017) of the investor VGU Project Management Unit.
18/10/2017 09:48
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Procurement of auxiliary equipment and water treatment, automation equipment for Mechatronics and Sensor Technology (MSST)” (Published in bidding newspaper No. 247 on December 26, 2016) of the investor VGU Project Management Unit.
26/12/2016 09:42
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package “Purchase of equipment for thermal analysis, electromechanical testing and non-destructive testing for Mechanical Engineering” (3 lots) (Posted on bidding newspaper No. 206 dated October 28, 2016) of the investor VGU Project Management Unit.
28/10/2016 10:59
The Bid solicitor VGU Project Management Unit has posted the results of the bidding package Purchase of high-tech processing machines for Global Manufacturing Engineering and Management (GPEM) (Posted on bidding newspaper No. 121 on 30/06/2016) of the investor VGU Project Management Unit.
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT BỊ VÀ CÔNG NGHỆ HẠT NHÂN NEAD
30/06/2016 07:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VGU Project Management Unit has posted 80 of the contractor selection plan, which contains 159 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VGU Project Management Unit has posted 97 Tender Notices in 97 bidding packages. Among these, -61 Tender Notices were self-invited, and 158 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VGU Project Management Unit has posted 57 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 57 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VGU Project Management Unit has a relationship with 64 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VGU Project Management Unit has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VGU Project Management Unit has a relationship with 7 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects