Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 8 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 10,338,636,979 VND, of which the total winning bid value is: 10,245,245,499 VND.
- The savings rate is: 0.90%.
Data analysis results of DauThau.info software for bid solicitors VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 10,338,636,979 VND, in which the total winning value is: 10,245,245,499 VND.
- The savings rate is: 0.90%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 158 bidding packages, of which 128 were won, 20 were lost, 6 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 25.4% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 83.2% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (30), Lâm Đồng (19), Hải Phòng (17), Quảng Ninh (8), Cần Thơ (6), Nghệ An (5), Thanh Hoá (5), Đà Nẵng (4), Khánh Hòa (3), Vĩnh Long (2), Quảng Trị (2), Đồng Nai (1), Gia Lai (1), Quảng Ngãi (1), Hà Nội (1), Undefined (53)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (20), Bình Thuận (19), Hải Phòng (14), Quảng Ninh (8), TP.Hồ Chí Minh (7), Nghệ An (5), Thanh Hoá (5), Cần Thơ (4), Khánh Hòa (3), Đà Nẵng (3), Trà Vinh (2), Quảng Trị (2), Hải Dương (1), Đồng Nai (1), Quảng Nam (1), Hậu Giang (1), Bình Định (1), Quảng Ngãi (1), Hà Nội (1), Undefined (59)
- Has relationships with 63 Bid Solicitors
- Has relationships with 64 Bid Investors
- Has competed against 53 contractors in 46 bidding packages, won 22 packages, lost 20 packages, 2 are pending results, and 2 were canceled.
- Has collaborated with 3 contractors in 3 bidding packages, won 2 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 43 bidding packages with 18 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ CÔNG TRÌNH HÀNG HẢI VIỆT NAM
- Code of capacity certificate of construction activities: 00002896
- Issuer: Sở Kế hoạch và Đầu tư thành phố Hải Phòng
- Fields:
⚬ Khảo sát xây dựng: Khảo sát xây dựng.
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế kết cấu công trình dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế kết cấu công trình công nghiệp nhẹ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế cơ - điện công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế cấp - thoát nước công trình
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình đường thủy nội địa, hàng hải.
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình dân dụng.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the barge wharf at Tan Cang Nhon Trach dry port in 2023 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
18/10/2023 18:36
The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted the request Contractor selection plan for the 2nd phase of the project of repairing the water area in front of the barge wharf at Tan Cang Nhon Trach inland port in 2023 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with 4 bidding package.
18/10/2023 17:52
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
18/10/2023 08:48
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
17/10/2023 17:59
The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted the request Contractor selection plan for the project of repairing the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with 4 bidding package.
17/10/2023 17:30
The data sheet has been partially hidden, to see the full information please Login or Register
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY announced the results of the bid package Construction and maintenance of the water area in front of the barge wharf at Tan Cang Nhon Trach dry port in 2023 .
- Winning bidder: TRI HUNG XAY DUNG JOINT STOCK COMPANY
23/11/2023 08:38
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY announced the results of the bid package Construction and maintenance of the water area in front of the wharf at Brigade 125 .
- Winning bidder: TPL INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
23/11/2023 08:36
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY announced the results of the bidding package Construction and maintenance of the water area in front of the barge wharf at Tan Cang Nhon Trach dry port in 2023 with 1 participating contractors .
30/10/2023 11:09
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY announced the results of the bidding package Construction and maintenance of the water area in front of the wharf at Brigade 125 with 1 participating contractors .
27/10/2023 15:45
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY publishes Tender Notice Construction and maintenance of the water area in front of the barge wharf at Tan Cang Nhon Trach dry port in 2023 in the form Open bidding .
18/10/2023 18:36
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY publishes the plan Contractor selection plan for the 2nd phase of the project of repairing the water area in front of the barge wharf at Tan Cang Nhon Trach inland port in 2023 with 4 bidding package .
18/10/2023 17:52
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY publishes Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 in the form Open bidding .
18/10/2023 08:48
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY publishes Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 in the form Open bidding .
17/10/2023 17:59
VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY publishes the plan Contractor selection plan for the project of repairing the water area in front of the wharf at Brigade 125 with 4 bidding package .
17/10/2023 17:30
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the barge wharf at Tan Cang Nhon Trach dry port in 2023 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
18/10/2023 18:36
The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted the request Contractor selection plan for the 2nd phase of the project of repairing the water area in front of the barge wharf at Tan Cang Nhon Trach inland port in 2023 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with 4 bidding package.
18/10/2023 17:52
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
18/10/2023 08:48
Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted Tender Notice Construction and maintenance of the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with the form Open bidding.
17/10/2023 17:59
The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted the request Contractor selection plan for the project of repairing the water area in front of the wharf at Brigade 125 of the investor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY with 4 bidding package.
17/10/2023 17:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted 2 of the contractor selection plan, which contains 8 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted 3 Tender Notices in 2 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIET NAM MARITIME CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects