Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VIETNAM MARITIME AND WATERWAY ADMINISTRATION as follows:
- Has relationships with 1 project owners.
- Has relationships with 128 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 198 contractor selection plans with a total of 732 bidding packages, of which 192 prequalification documents have not found the investment project.
- Has invited bids for 328 packages (with 363 tender notices), and conducted prequalification for 0 packages.
- There are 8 bidding packages with content that needs clarification.
- Announced the results of 315 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 423 packages that have not fully posted the contractor selection results. Of these 402 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 5.23%, Construction 19.01%, Consultancy 33.61%, Non-consultancy 42.15%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,448,730,897,623 VND, of which the total winning bid value is: 2,349,493,462,284 VND.
- The savings rate is: 4.05%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM MARITIME AND WATERWAY ADMINISTRATION as follows:
- Has relationships with 128 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 5.23%, Construction 19.01%, Consulting 33.61%, Non-consulting 42.15%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,448,730,897,623 VND, in which the total winning value is: 2,349,493,462,284 VND.
- The savings rate is: 4.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 190 contractor selection plans, of which 161 were self-published, and 29 were published by other entities.
- Is the investor of 392 Tender Notices, of which 363 were self-invited, and 29 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTUBCCCCCKTTTTTT: Advice on verification of adjustment research reports .
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:11
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTTKCTCNTT: Consulting on verifying detailed design, adjusted estimates .
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:08
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package CCNCNCKTCTT: Advice on adjusting the feasibility study report .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:05
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package DCTKCTCNTT: Consulting on reviewing and adjusting detailed designs and estimates .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:03
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTG-IT: Appraisal of adjusted prices .
- Winning bidder: TRUE VALUE VALUATION JOINT STOCK COMPANY
10/01/2026 15:01
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package KTPM-IT: Software testing .
10/01/2026 14:57
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package HTKTDDCCNTT: Purchasing additional information technology equipment and upgrading internal software .
- Winning bidder: VIETNAM MARITIME COMMUNICATION AND ELECTRONICS SINGLE-MEMBER LIMITED LIABILITY COMPANY
10/01/2026 14:54
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Consultant - IT: Consulting on preparing request documents and evaluating proposal documents for the contract package Technical Support - IT .
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
10/01/2026 14:31
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TVGSHTKTDCCNTT: Consulting and monitoring of adjusted information technology technical infrastructure items .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 14:28
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for selecting contractors for the supervision package of adjusted information technology technical infrastructure items under the project to build an integrated management information system for digital transformation of Vietnam Maritime and Waterways Administration with 1 bidding package .
25/11/2025 09:34
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Contractor selection plan for bidding packages: Project management consultancy; Advice on making bidding documents, evaluating bidding documents for project - project management consulting package: Eliminating KM83+000 stone beach to Km83+215; Km83+600 to Km83+788 River Lo with 2 bidding package .
30/09/2025 19:46
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Contractor selection plan for bidding packages: Project management consultancy; Consulting to prepare bidding documents, evaluate bidding documents for project-project management consultancy package: Eliminate stone beach Km90+100 to Km90+250; Km90+950 to Km91+100 Lo River with 2 bidding package .
30/09/2025 19:34
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consulting package: Dredging to ensure traffic safety Ong Doc River - Trem Trem (section from Ong Doc River to Tan Canal Bang Gao) with 2 bidding package .
29/08/2025 08:37
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
29/08/2025 08:36
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
29/08/2025 08:28
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consulting package: Dredging to ensure traffic safety Ong Doc River - Trem Trem (section from Ong Doc River to Tan Canal Bang Gao) with 2 bidding package .
28/08/2025 15:42
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
28/08/2025 15:42
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy with 2 bidding package .
28/08/2025 15:33
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Making bidding documents and evaluating bidding documents for project management package .
- Winning bidder: HOANG HA TRADING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
28/07/2025 11:13
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Making bidding documents and evaluating bidding documents for project management package .
- Winning bidder: HOANG HA TRADING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
28/07/2025 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTUBCCCCCKTTTTTT: Advice on verification of adjustment research reports .
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:11
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTTKCTCNTT: Consulting on verifying detailed design, adjusted estimates .
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:08
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package CCNCNCKTCTT: Advice on adjusting the feasibility study report .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:05
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package DCTKCTCNTT: Consulting on reviewing and adjusting detailed designs and estimates .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:03
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TTG-IT: Appraisal of adjusted prices .
- Winning bidder: TRUE VALUE VALUATION JOINT STOCK COMPANY
10/01/2026 15:01
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package KTPM-IT: Software testing .
10/01/2026 14:57
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package HTKTDDCCNTT: Purchasing additional information technology equipment and upgrading internal software .
- Winning bidder: VIETNAM MARITIME COMMUNICATION AND ELECTRONICS SINGLE-MEMBER LIMITED LIABILITY COMPANY
10/01/2026 14:54
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Consultant - IT: Consulting on preparing request documents and evaluating proposal documents for the contract package Technical Support - IT .
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
10/01/2026 14:31
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package TVGSHTKTDCCNTT: Consulting and monitoring of adjusted information technology technical infrastructure items .
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 14:28
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for selecting contractors for the supervision package of adjusted information technology technical infrastructure items under the project to build an integrated management information system for digital transformation of Vietnam Maritime and Waterways Administration with 1 bidding package .
25/11/2025 09:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted 198 of the contractor selection plan, which contains 732 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted 363 Tender Notices in 328 bidding packages. Among these, 363 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted 315 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 315 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has a relationship with 128 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has a relationship with 32 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIETNAM MARITIME AND WATERWAY ADMINISTRATION has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects