Data analysis results of DauThau.info software for bid solicitors VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY as follows:
- Has relationships with 2 project owners.
- Has relationships with 15 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 17 contractor selection plans with a total of 24 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 77.78%, Construction 0%, Consultancy 22.22%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 33,508,674,274 VND, of which the total winning bid value is: 32,574,203,468 VND.
- The savings rate is: 2.79%.
Data analysis results of DauThau.info software for bid solicitors VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 77.78%, Construction 0%, Consulting 22.22%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 33,508,674,274 VND, in which the total winning value is: 32,574,203,468 VND.
- The savings rate is: 2.79%.
This Bid solicitor is also an investor. The analysis results of data for the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 17 contractor selection plans, of which 15 were self-published, and 2 were published by other entities.
- Is the investor of 14 Tender Notices, of which 9 were self-invited, and 5 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 68.7% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 68.7% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (1)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 2 contractors in 1 bidding packages, won 0 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 2 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes Tender Notice Package number 04: TV - Project Management Consulting in the form Open bidding .
11/12/2025 14:30
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan Contractor selection plan for the investment preparation phase Project: Building the headquarters of Vung Tau Shipping and Services Joint Stock Company at 88 Ha Long, Vung Tau Ward, Ho Chi Minh City with 7 bidding package .
30/11/2025 13:00
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package Package No. 01: TV - Preparation of bidding documents and Evaluation of bid documents Package: Project management consulting .
- Winning bidder: TIN NGHIA CONSTRUCTION CONSULTING CORPORATION
19/11/2025 10:23
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan Contractor selection plan for the investment preparation phase Project: Building the headquarters of Vung Tau Shipping and Services Joint Stock Company at 88 Ha Long, Vung Tau Ward, Ho Chi Minh City with 7 bidding package .
16/10/2025 15:17
The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has posted the results of the bidding package PTV- Insurance to build 02 pilot transport ships (Package No. 13 of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
28/03/2025 10:34
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package TV- Supervision of construction and equipment installation of 02 pilot shuttle ships (Package No. 12) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: SUNRISE PACIFIC COMPANY LIMITED
21/02/2025 15:32
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package XL - New construction of 02 pilot shuttle ships (Package No. 10) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: TAN VIEN DONG TRADING COMPANY LIMITED
18/02/2025 10:19
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package MS - Procurement of main engines and generators for 02 pilot shuttle ships (Package No. 11) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: VAN MINH MANUFACTURING TRADING TECHNOLOGY COMPANY LIMITED
12/02/2025 15:10
Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted Tender Notice TV- Supervision of construction and equipment installation of 02 pilot shuttle ships (Tender package No 12) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY with the form Open bidding.
06/01/2025 15:49
Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted Tender Notice XL - New construction of 02 pilot shuttle ships (Tender package No 10) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY with the form Open bidding.
05/01/2025 15:18
The data sheet has been partially hidden, to see the full information please Login or Register
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package PTV- Insurance to build 02 pilot transport ships (Package No. 13 .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
28/03/2025 10:34
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package Consultant - Consulting on preparing E-Bidding and evaluating E-Bidding for the procurement package of main engines and generators for 02 pilot shuttle ships (Package No. 09 .
- Winning bidder: VIETNAM MARITIME SCIENCE TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY
24/12/2024 14:31
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package Consulting-Consulting on preparing E-Bidding and evaluating E-Bidding for the construction package of 02 new pilot shuttle ships; Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents for bidding packages for construction supervision and equipment installation (Package No. 08) .
- Winning bidder: HOANG HA TRADING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
24/12/2024 14:28
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan Plan to select contractors for the shipbuilding phase of the Project: Building 02 new pilot shuttle ships with 6 bidding package .
19/12/2024 08:46
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package TV - Valuation (Package No. 07) .
- Winning bidder: TRUE VALUE VALUATION JOINT STOCK COMPANY
06/12/2024 11:28
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package TV - Consulting to verify technical design and total estimate (Package No. 06) .
- Winning bidder: SUNRISE PACIFIC COMPANY LIMITED
09/08/2024 16:51
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package TV - Consulting on technical design and total estimate (Package No. 05) .
- Winning bidder: SOAI RAP DESIGN COMPANY LIMITED
12/07/2024 10:55
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan TECHNICAL DESIGN PHASE - TOTAL ESTIMATE UNDER THE PROJECT OF NEW BUILDING 02 PILOT SHUTTLE SHIPS with 3 bidding package .
19/06/2024 10:39
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package TV - VERIFICATION OF FEASIBILITY STUDY REPORT (PACKAGE NO. 04) .
- Winning bidder: Maritime Research Institute (MRI)
05/03/2024 08:57
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package TV - PROJECT MANAGEMENT CONSULTANT (PACKAGE NO. 02) .
- Winning bidder: NORTHERN VIETNAM MARITIME SAFETY CORPORATION
05/03/2024 08:41
The data sheet has been partially hidden, to see the full information please Login or Register
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes Tender Notice Package number 04: TV - Project Management Consulting in the form Open bidding .
11/12/2025 14:30
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan Contractor selection plan for the investment preparation phase Project: Building the headquarters of Vung Tau Shipping and Services Joint Stock Company at 88 Ha Long, Vung Tau Ward, Ho Chi Minh City with 7 bidding package .
30/11/2025 13:00
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY announced the results of the bid package Package No. 01: TV - Preparation of bidding documents and Evaluation of bid documents Package: Project management consulting .
- Winning bidder: TIN NGHIA CONSTRUCTION CONSULTING CORPORATION
19/11/2025 10:23
VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY publishes the plan Contractor selection plan for the investment preparation phase Project: Building the headquarters of Vung Tau Shipping and Services Joint Stock Company at 88 Ha Long, Vung Tau Ward, Ho Chi Minh City with 7 bidding package .
16/10/2025 15:17
The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has posted the results of the bidding package PTV- Insurance to build 02 pilot transport ships (Package No. 13 of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
28/03/2025 10:34
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package TV- Supervision of construction and equipment installation of 02 pilot shuttle ships (Package No. 12) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: SUNRISE PACIFIC COMPANY LIMITED
21/02/2025 15:32
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package XL - New construction of 02 pilot shuttle ships (Package No. 10) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: TAN VIEN DONG TRADING COMPANY LIMITED
18/02/2025 10:19
The Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted the results of the bidding package MS - Procurement of main engines and generators for 02 pilot shuttle ships (Package No. 11) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY.
- Winning bidder: VAN MINH MANUFACTURING TRADING TECHNOLOGY COMPANY LIMITED
12/02/2025 15:10
Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted Tender Notice TV- Supervision of construction and equipment installation of 02 pilot shuttle ships (Tender package No 12) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY with the form Open bidding.
06/01/2025 15:49
Bid solicitor Ban quản lý dự án Bảo đảm an toàn hàng hải miền Bắc has posted Tender Notice XL - New construction of 02 pilot shuttle ships (Tender package No 10) of the investor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY with the form Open bidding.
05/01/2025 15:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has posted 17 of the contractor selection plan, which contains 24 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has posted 9 Tender Notices in 6 bidding packages. Among these, 8 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VUNG TAU SHIPPING AND SERVICES JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects