Data analysis results of DauThau.info software for bid solicitors Ban Đầu tư và Xây dựng 307 as follows:
- Has relationships with 1 project owners.
- Has relationships with 12 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 18 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 12 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 33.33%, Consultancy 66.67%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 107,315,366,000 VND, of which the total winning bid value is: 100,166,415,000 VND.
- The savings rate is: 6.66%.
Data analysis results of DauThau.info software for bid solicitors Ban Đầu tư và Xây dựng 307 as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 33.33%, Consulting 66.67%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 107,315,366,000 VND, in which the total winning value is: 100,166,415,000 VND.
- The savings rate is: 6.66%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Đầu tư và Xây dựng 307 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 6 contractor selection plans, of which 6 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the request Plan to select contractors to provide car rental services in 2025 of the investor Ban Đầu tư và Xây dựng 307 with 1 bidding package.
15/01/2025 08:34
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 57: "Interior construction of Village Pagoda" (including 5% contingency fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: URBAN ARCHITECTURE DEVELOPMENT CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
21/10/2024 15:09
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: VINACITY - VIETNAM CITY CONSULTANT JOINT STOCK COMPANY
12/07/2024 15:18
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 56: “Interior construction: Lang Communal House, Lang Temple; Hue Garden House; Quang Nam communal house; Southern garden house; Dong Nai traditional house; The house belongs to the foreign guests; Bac Ninh traditional house; Village Market; Ha Tay traditional house, Nam Dinh sedge house” (including 5% reserve fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: DAI DOAN KET EXPORT IMPORT JOINT STOCK COMPANY
04/07/2024 17:28
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 55: “Interior construction: Hoa, Ngai, San Diu ethnic houses; Thanh Hoa traditional house; Nghe An traditional house” (including 5% reserve fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: HOA LAC HITECH PARK DEVELOPMENT ONE-MEMBER LIMITED LIABILITY COMPANY
04/07/2024 17:26
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 54: "Interior construction of Nhi Phu Temple" (including 5% contingency fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: Công ty cổ phần xây dựng số 9
04/07/2024 17:24
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 52: "Consulting on contractor selection for bidding packages under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN VÀ CHI PHÍ ĐẦU TƯ - AFO
13/06/2024 15:36
Bid solicitor Ban Đầu tư và Xây dựng 307 has posted Tender Notice Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307 with the form Open bidding.
12/06/2024 08:50
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the request 6th contractor selection plan, phase II of the Ethnic Villages Area Construction Investment Project IV of the investor Ban Đầu tư và Xây dựng 307 with 6 bidding package.
05/06/2024 09:22
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 51: "Consulting on verification of construction drawing design documents and interior estimates for folk, religious and belief houses" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: VINAREMON - THE CENTRAL RESTORATION OF MONUMENTS JOINT STOCK COMPANY
21/05/2024 11:14
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Đầu tư và Xây dựng 307 publishes the plan Plan to select contractors to provide car rental services in 2025 with 1 bidding package .
15/01/2025 08:34
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Package No. 57: "Interior construction of Village Pagoda" (including 5% contingency fee) .
- Winning bidder: TUNG LAM TRADE INVESTMENT AND CONSTRUCTION COMPANY LIMITED, URBAN ARCHITECTURE DEVELOPMENT CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
21/10/2024 15:09
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" .
- Winning bidder: VINACITY - VIETNAM CITY CONSULTANT JOINT STOCK COMPANY
12/07/2024 15:18
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Package No. 56: “Interior construction: Lang Communal House, Lang Temple; Hue Garden House; Quang Nam communal house; Southern garden house; Dong Nai traditional house; The house belongs to the foreign guests; Bac Ninh traditional house; Village Market; Ha Tay traditional house, Nam Dinh sedge house” (including 5% reserve fee) .
- Winning bidder: DAI DOAN KET EXPORT IMPORT JOINT STOCK COMPANY
04/07/2024 17:28
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Package No. 55: “Interior construction: Hoa, Ngai, San Diu ethnic houses; Thanh Hoa traditional house; Nghe An traditional house” (including 5% reserve fee) .
- Winning bidder: HOA LAC HITECH PARK DEVELOPMENT ONE-MEMBER LIMITED LIABILITY COMPANY
04/07/2024 17:26
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Package No. 54: "Interior construction of Nhi Phu Temple" (including 5% contingency fee) .
- Winning bidder: TUNG LAM TRADE INVESTMENT AND CONSTRUCTION COMPANY LIMITED, Công ty cổ phần xây dựng số 9
04/07/2024 17:24
Ban Đầu tư và Xây dựng 307 announced the results of the bidding package Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" with 1 participating contractors .
01/07/2024 11:23
Ban Đầu tư và Xây dựng 307 announced the results of the bid package Bidding package No. 52: "Consulting on contractor selection for bidding packages under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" .
- Winning bidder: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN VÀ CHI PHÍ ĐẦU TƯ - AFO
13/06/2024 15:36
Ban Đầu tư và Xây dựng 307 publishes Tender Notice Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" in the form Open bidding .
12/06/2024 08:50
Ban Đầu tư và Xây dựng 307 publishes the plan 6th contractor selection plan, phase II of the Ethnic Villages Area Construction Investment Project IV with 6 bidding package .
05/06/2024 09:22
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the request Plan to select contractors to provide car rental services in 2025 of the investor Ban Đầu tư và Xây dựng 307 with 1 bidding package.
15/01/2025 08:34
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 57: "Interior construction of Village Pagoda" (including 5% contingency fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: URBAN ARCHITECTURE DEVELOPMENT CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
21/10/2024 15:09
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: VINACITY - VIETNAM CITY CONSULTANT JOINT STOCK COMPANY
12/07/2024 15:18
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 56: “Interior construction: Lang Communal House, Lang Temple; Hue Garden House; Quang Nam communal house; Southern garden house; Dong Nai traditional house; The house belongs to the foreign guests; Bac Ninh traditional house; Village Market; Ha Tay traditional house, Nam Dinh sedge house” (including 5% reserve fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: DAI DOAN KET EXPORT IMPORT JOINT STOCK COMPANY
04/07/2024 17:28
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 55: “Interior construction: Hoa, Ngai, San Diu ethnic houses; Thanh Hoa traditional house; Nghe An traditional house” (including 5% reserve fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: HOA LAC HITECH PARK DEVELOPMENT ONE-MEMBER LIMITED LIABILITY COMPANY
04/07/2024 17:26
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Package No. 54: "Interior construction of Nhi Phu Temple" (including 5% contingency fee) of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: Công ty cổ phần xây dựng số 9
04/07/2024 17:24
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 52: "Consulting on contractor selection for bidding packages under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN VÀ CHI PHÍ ĐẦU TƯ - AFO
13/06/2024 15:36
Bid solicitor Ban Đầu tư và Xây dựng 307 has posted Tender Notice Bidding package No. 53: "Consulting and supervising the construction of bidding packages No. 54, 55, 56, 57 under the 6th contractor selection plan, phase II of the Ethnic Villages Area IV construction investment project" of the investor Ban Đầu tư và Xây dựng 307 with the form Open bidding.
12/06/2024 08:50
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the request 6th contractor selection plan, phase II of the Ethnic Villages Area Construction Investment Project IV of the investor Ban Đầu tư và Xây dựng 307 with 6 bidding package.
05/06/2024 09:22
The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted the results of the bidding package Bidding package No. 51: "Consulting on verification of construction drawing design documents and interior estimates for folk, religious and belief houses" of the investor Ban Đầu tư và Xây dựng 307.
- Winning bidder: VINAREMON - THE CENTRAL RESTORATION OF MONUMENTS JOINT STOCK COMPANY
21/05/2024 11:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Đầu tư và Xây dựng 307 has posted 8 of the contractor selection plan, which contains 18 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted 3 Tender Notices in 3 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Đầu tư và Xây dựng 307 has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 12 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Đầu tư và Xây dựng 307 has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Đầu tư và Xây dựng 307 has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Đầu tư và Xây dựng 307 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects