Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk as follows:
- Has relationships with 2 project owners.
- Has relationships with 332 contractor.
- Announced 86 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 237 contractor selection plans with a total of 827 bidding packages, of which 48 prequalification documents have not found the investment project.
- Has invited bids for 314 packages (with 342 tender notices), and conducted prequalification for 4 packages.
- There are 24 bidding packages with content that needs clarification.
- Announced the results of 374 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 74 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 471 packages that have not fully posted the contractor selection results. Of these 467 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.95 contractors.
- Breakdown by bidding field: Goods 12.57%, Construction 35.09%, Consultancy 38.30%, Non-consultancy 8.19%, Mixed 5.85%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,808,269,934,416 VND, of which the total winning bid value is: 12,253,941,447,858 VND.
- The savings rate is: 4.33%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk as follows:
- Has relationships with 332 contractor.
- The average number of contractors participating in each bidding package is: 1.95 contractors.
- Proportion of bidding fields: Goods 12.57%, Construction 35.09%, Consulting 38.30%, Non-consulting 8.19%, Mixed 5.85%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,808,269,934,416 VND, in which the total winning value is: 12,253,941,447,858 VND.
- The savings rate is: 4.33%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk are as follows:
- Is the investor of 86 development investment projects.
- Is the investor of 252 contractor selection plans, of which 154 were self-published, and 98 were published by other entities.
- Is the investor of 343 Tender Notices, of which 303 were self-invited, and 40 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package No. 03XL .
- Winning bidder: CÔNG TY TNHH XÂY LẮP TRUNG THUẬN
25/08/2026 15:20
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package 02xl .
- Winning bidder: PHU YEN TOWN ENVIRONMENT JOINT STOCK COMPANY
25/08/2026 14:15
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Bidding package No. 01XL .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT - XÂY DỰNG VÀ THƯƠNG MẠI HUY PHƯƠNG
25/08/2026 14:09
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package 06TV .
- Winning bidder: DAT VIET CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
15/08/2026 15:31
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the procurement plan (round 11), Project: Landscape construction for the Lieu Van Chan temple site. with 1 bidding package .
10/08/2026 14:33
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the procurement plan (round 10), Project: Landscape construction for the Lieu Van Chan temple site. with 5 bidding package .
06/08/2026 08:25
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes Tender Notice Bid package number 04TB in the form Open bidding .
26/07/2026 14:28
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Bidding package 09TV .
- Winning bidder: Công ty Cổ phần Thẩm định giá và Dịch vụ tài sản Toàn Cầu
24/07/2026 10:00
The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has posted the results of the bidding package Package PY-CW05: Construction of clean water supply system for Krong Pa commune of the investor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk.
- Winning bidder: NO 10 ROAD BRIDGE JOINT STOCK COMPANY
23/07/2026 11:06
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the contractor selection plan (phase 3), Project: Relocation of Medium and Low Voltage lines and Transformer Station out of site clearance area under the project Infrastructure investment in land plots marked CC1 and CC3 east of Hung Vuong street, Binh Kien commune, Tuy Hoa city, Phu Yen province with 1 bidding package .
21/07/2026 16:32
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW05: Construction of clean water supply system for Krong Pa commune .
- Winning bidder: NO 10 ROAD BRIDGE JOINT STOCK COMPANY
23/07/2026 11:06
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW06: Construction of clean water supply system for Phuoc Tan commune .
- Winning bidder: NGHI TAM CONSTRUCTION CONSULTANCY AND TRADE JOINT STOCK COMPANY
22/06/2026 21:08
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW04: Construction of clean water supply system for Ca Lui commune .
- Winning bidder: PUMPS EUROPE JOINT STOCK COMPANY
12/05/2026 14:32
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW03: Upgrading traffic route from Ma Y village - Ma Giay village, Phuoc Tan commune, Son Hoa district .
- Winning bidder: CÔNG TY TNHH TÂN LẬP
12/05/2026 14:27
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW02: Upgrading 04 roads in Song Hinh district (including: Route 1: Upgrading the inter-commune traffic road Son Giang to Duc Binh Dong; Route 2: Upgrading the road from EaBia commune to Duc Binh Tay commune; Route 3: Upgrading traffic roads from Buon Thu, EaBar commune to Buon Bach (Tan Binh), EaLy commune; Route 4: Upgrading traffic roads from Buon Chung, EaBar commune to Buon Hello Ea Ba commune) .
- Winning bidder: MIEN TRUNG INFRASTRUCTURE INVESTMENT JOINT STOCK COMPANY, MIEN TRUNG INFRASTRUCTURE INVESTMENT JOINT STOCK COMPANY
11/05/2026 10:30
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW01: Upgrading the road between Xuan Lanh - Phu Hai commune, Dong Xuan district .
- Winning bidder: NANG BAN MAI INVESTMENT GROUP CORPORATION, NANG BAN MAI INVESTMENT GROUP CORPORATION
13/04/2026 10:07
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package PY-CW07: Construction of a centralized water supply system for Da Loc commune - Xuan Lanh commune, Dong Xuan district .
- Winning bidder: SAI GON ENVIRONMENTAL TECHNOLOGY AND CONSTRUCTION CORPORATION, SAI GON ENVIRONMENTAL TECHNOLOGY AND CONSTRUCTION CORPORATION
08/04/2026 14:31
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package PY-CS02 bidding package .
- Winning bidder: TRANSPORT ENGINEERING CONULTANTS COMPANY N0.4, BINHDINH HYDRAULIC HYDROELECTRIC ENGINEERING CONSULTANT JOINT STOCK COMPANY
04/03/2026 10:52
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bidding package Package PY-CW03: Upgrading traffic route from Ma Y village - Ma Giay village, Phuoc Tan commune, Son Hoa district with 5 participating contractors .
25/02/2026 15:01
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bidding package Package PY-CW02: Upgrading 04 roads in Song Hinh district (including: Route 1: Upgrading the inter-commune traffic road Son Giang to Duc Binh Dong; Route 2: Upgrading the road from EaBia commune to Duc Binh Tay commune; Route 3: Upgrading traffic roads from Buon Thu, EaBar commune to Buon Bach (Tan Binh), EaLy commune; Route 4: Upgrading traffic roads from Buon Chung, EaBar commune to Buon Hello Ea Ba commune) with 3 participating contractors .
13/02/2026 16:30
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package No. 03XL .
- Winning bidder: CÔNG TY TNHH XÂY LẮP TRUNG THUẬN
25/08/2026 15:20
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package 02xl .
- Winning bidder: PHU YEN TOWN ENVIRONMENT JOINT STOCK COMPANY
25/08/2026 14:15
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Bidding package No. 01XL .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT - XÂY DỰNG VÀ THƯƠNG MẠI HUY PHƯƠNG
25/08/2026 14:09
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Package 06TV .
- Winning bidder: DAT VIET CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
15/08/2026 15:31
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the procurement plan (round 11), Project: Landscape construction for the Lieu Van Chan temple site. with 1 bidding package .
10/08/2026 14:33
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the procurement plan (round 10), Project: Landscape construction for the Lieu Van Chan temple site. with 5 bidding package .
06/08/2026 08:25
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes Tender Notice Bid package number 04TB in the form Open bidding .
26/07/2026 14:28
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk announced the results of the bid package Bidding package 09TV .
- Winning bidder: Công ty Cổ phần Thẩm định giá và Dịch vụ tài sản Toàn Cầu
24/07/2026 10:00
The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has posted the results of the bidding package Package PY-CW05: Construction of clean water supply system for Krong Pa commune of the investor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk.
- Winning bidder: NO 10 ROAD BRIDGE JOINT STOCK COMPANY
23/07/2026 11:06
Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk publishes the plan Approval of the contractor selection plan (phase 3), Project: Relocation of Medium and Low Voltage lines and Transformer Station out of site clearance area under the project Infrastructure investment in land plots marked CC1 and CC3 east of Hung Vuong street, Binh Kien commune, Tuy Hoa city, Phu Yen province with 1 bidding package .
21/07/2026 16:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has posted 237 of the contractor selection plan, which contains 827 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk posted 4 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has posted 342 Tender Notices in 314 bidding packages. Among these, 304 Tender Notices were self-invited, and 38 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has posted 374 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 374 package, canceled the bid 0 package (among the bidding packages above).
- There are 74 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has a relationship with 332 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has a relationship with 101 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý các dự án đầu tư xây dựng khu vực phía Đông tỉnh Đắk Lắk has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects