Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Công trình Thủ Thiêm as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 9 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 133,021,471,460 VND, of which the total winning bid value is: 131,165,160,000 VND.
- The savings rate is: 1.40%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Công trình Thủ Thiêm as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 133,021,471,460 VND, in which the total winning value is: 131,165,160,000 VND.
- The savings rate is: 1.40%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý Công trình Thủ Thiêm are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 1 were self-published, and 1 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted the results of the bidding package Construction, supply and installation of equipment of the investor Ban Quản lý Công trình Thủ Thiêm.
- Winning bidder: Liên danh Lưu Nguyễn Seen (thành viên đứng đầu liên danh Công ty TNHH Xây dựng Lưu Nguyễn và thành viên liên danh Công ty cổ phần Kỹ thuật Seen)
15/10/2015 16:11
Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted Tender Notice Construction, supply and installation of equipment of the investor Ban Quản lý Công trình Thủ Thiêm with the form National competitive bidding.
07/08/2015 16:10
The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted the request Domestic wastewater treatment station for 38.4ha resettlement residential area Binh Khanh of the investor Ban Quản lý Công trình Thủ Thiêm with 9 bidding package.
30/07/2015 15:46
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Construction of a domestic wastewater treatment station for 38.4 (ha) resettlement residential area in Binh Khanh. of the investor Ban Quản lý Công trình Thủ Thiêm with 10 bidding package.
05/01/2015 11:36
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý Công trình Thủ Thiêm announced the results of the bid package Construction, supply and installation of equipment .
- Winning bidder: Liên danh Lưu Nguyễn Seen (thành viên đứng đầu liên danh Công ty TNHH Xây dựng Lưu Nguyễn và thành viên liên danh Công ty cổ phần Kỹ thuật Seen)
15/10/2015 16:11
Ban Quản lý Công trình Thủ Thiêm publishes Tender Notice Construction supervision consultancy and equipment supply and installation in the form National competitive bidding .
17/09/2015 10:54
Ban Quản lý Công trình Thủ Thiêm publishes Tender Notice Construction, supply and installation of equipment in the form National competitive bidding .
10/08/2015 09:14
Ban Quản lý Công trình Thủ Thiêm publishes Tender Notice Construction, supply and installation of equipment in the form National competitive bidding .
07/08/2015 16:10
Ban Quản lý Công trình Thủ Thiêm publishes the plan Domestic wastewater treatment station for 38.4ha resettlement residential area Binh Khanh with 9 bidding package .
30/07/2015 15:46
Ban Quản lý Công trình Thủ Thiêm publishes Tender Notice Consultancy on design of construction drawings and making estimates in the form National competitive bidding .
06/01/2015 08:50
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted the results of the bidding package Construction, supply and installation of equipment of the investor Ban Quản lý Công trình Thủ Thiêm.
- Winning bidder: Liên danh Lưu Nguyễn Seen (thành viên đứng đầu liên danh Công ty TNHH Xây dựng Lưu Nguyễn và thành viên liên danh Công ty cổ phần Kỹ thuật Seen)
15/10/2015 16:11
Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted Tender Notice Construction, supply and installation of equipment of the investor Ban Quản lý Công trình Thủ Thiêm with the form National competitive bidding.
07/08/2015 16:10
The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted the request Domestic wastewater treatment station for 38.4ha resettlement residential area Binh Khanh of the investor Ban Quản lý Công trình Thủ Thiêm with 9 bidding package.
30/07/2015 15:46
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Construction of a domestic wastewater treatment station for 38.4 (ha) resettlement residential area in Binh Khanh. of the investor Ban Quản lý Công trình Thủ Thiêm with 10 bidding package.
05/01/2015 11:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý Công trình Thủ Thiêm has posted 1 of the contractor selection plan, which contains 9 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted 2 Tender Notices in 2 bidding packages. Among these, -1 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý Công trình Thủ Thiêm has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý Công trình Thủ Thiêm has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects