Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án các công trình xây dựng huyện Phong Điền as follows:
- Has relationships with 53 contractor.
- Announced 46 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 73 contractor selection plans with a total of 426 bidding packages, of which 15 prequalification documents have not found the investment project.
- Has invited bids for 58 packages (with 65 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 48 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 376 packages that have not fully posted the contractor selection results. Of these 376 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.67 contractors.
- Breakdown by bidding field: Goods 4.62%, Construction 89.23%, Consultancy 6.15%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 187,230,722,018 VND, of which the total winning bid value is: 176,990,204,336 VND.
- The savings rate is: 5.47%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án các công trình xây dựng huyện Phong Điền as follows:
- Has relationships with 53 contractor.
- The average number of contractors participating in each bidding package is: 3.67 contractors.
- Proportion of bidding fields: Goods 4.62%, Construction 89.23%, Consulting 6.15%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 187,230,722,018 VND, in which the total winning value is: 176,990,204,336 VND.
- The savings rate is: 5.47%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 46 investment and development projects.
- As the owner of 64 Contractor selection plan in which 62 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 30 bidding packages in which 30 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Civil Works of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
29/07/2022 10:19
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request KHLCNT Archives, platoon housing District Military Command Board of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 8 bidding package.
11/07/2022 10:03
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Construction of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
23/06/2022 14:34
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request KHLCNT Upgrading and renovating Vovinam martial arts training house, Phong Dien district of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 4 bidding package.
21/06/2022 14:44
Ban quản lý dự án các công trình xây dựng huyện Phong Điền Posted Development Investment Project Rural road Vam Xang - Ba Lang.
21/02/2020 08:08
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Consultancy in designing construction drawings and cost estimates of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HATECCO
30/07/2019 11:19
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Construction bidding package (including construction cost + general items) of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
- Winning bidder: Công ty TNHH Một thành viên TV ĐT Xây dựng PCI
12/06/2019 09:44
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Construction (including construction costs + general items) of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
06/06/2019 15:48
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Consultancy in designing construction drawings and cost estimates of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
04/06/2019 16:31
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request Planning for additional construction of Nhon Ai primary school 1 of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 9 bidding package.
04/06/2019 14:12
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bidding package Civil Works with 1 participating contractors .
09/08/2022 09:02
Ban quản lý dự án các công trình xây dựng huyện Phong Điền publishes Tender Notice Civil Works in the form National competitive bidding .
29/07/2022 10:19
Ban quản lý dự án các công trình xây dựng huyện Phong Điền publishes the plan KHLCNT Archives, platoon housing District Military Command Board with 8 bidding package .
11/07/2022 10:03
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bidding package Construction with 3 participating contractors .
04/07/2022 08:00
Ban quản lý dự án các công trình xây dựng huyện Phong Điền publishes Tender Notice Construction in the form National competitive bidding .
23/06/2022 14:34
Ban quản lý dự án các công trình xây dựng huyện Phong Điền publishes the plan KHLCNT Upgrading and renovating Vovinam martial arts training house, Phong Dien district with 4 bidding package .
21/06/2022 14:44
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bid package Consultancy in designing construction drawings and cost estimates .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HATECCO
30/07/2019 11:19
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bidding package Consultancy in designing construction drawings and cost estimates with 3 participating contractors .
19/07/2019 16:05
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bid package Construction bidding package (including construction cost + general items) .
- Winning bidder: Công ty TNHH Một thành viên TV ĐT Xây dựng PCI
12/06/2019 09:44
Ban quản lý dự án các công trình xây dựng huyện Phong Điền announced the results of the bid package Construction (including construction costs + general items) .
- Winning bidder: Công Ty TNHH Xây Dựng Gia Phúc Lộc
06/06/2019 15:48
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Civil Works of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
29/07/2022 10:19
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request KHLCNT Archives, platoon housing District Military Command Board of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 8 bidding package.
11/07/2022 10:03
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Construction of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
23/06/2022 14:34
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request KHLCNT Upgrading and renovating Vovinam martial arts training house, Phong Dien district of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 4 bidding package.
21/06/2022 14:44
Ban quản lý dự án các công trình xây dựng huyện Phong Điền Posted Development Investment Project Rural road Vam Xang - Ba Lang.
21/02/2020 08:08
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Consultancy in designing construction drawings and cost estimates of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HATECCO
30/07/2019 11:19
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Construction bidding package (including construction cost + general items) of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
- Winning bidder: Công ty TNHH Một thành viên TV ĐT Xây dựng PCI
12/06/2019 09:44
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the results of the bidding package Construction (including construction costs + general items) of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền.
06/06/2019 15:48
Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted Tender Notice Consultancy in designing construction drawings and cost estimates of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with the form National competitive bidding.
04/06/2019 16:31
The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted the request Planning for additional construction of Nhon Ai primary school 1 of the investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền with 9 bidding package.
04/06/2019 14:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted 73 of the contractor selection plan, which contains 426 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted 65 Tender Notice in the 58 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has posted 48 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 48 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has a relationship with 53 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền is the investor of 30 package, of which 30 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền is the owner of 64 contractor selection plan. In which, they self-invite 62 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền is an investor with 47 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án các công trình xây dựng huyện Phong Điền is the investor of 46 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code