Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 422 contractor.
- Announced 239 investment development project, of which 24 projects have not yet announced the prequalification documents.
- Announced 480 contractor selection plans with a total of 1443 bidding packages, of which 100 prequalification documents have not found the investment project.
- Has invited bids for 426 packages (with 469 tender notices), and conducted prequalification for 0 packages.
- There are 8 bidding packages with content that needs clarification.
- Announced the results of 1294 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 888 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 419 packages that have not fully posted the contractor selection results. Of these 417 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.34 contractors.
- Breakdown by bidding field: Goods 0%, Construction 61.19%, Consultancy 34.97%, Non-consultancy 3.84%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,164,377,145,019 VND, of which the total winning bid value is: 3,009,780,828,804 VND.
- The savings rate is: 4.89%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn as follows:
- Has relationships with 422 contractor.
- The average number of contractors participating in each bidding package is: 1.34 contractors.
- Proportion of bidding fields: Goods 0%, Construction 61.19%, Consulting 34.97%, Non-consulting 3.84%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,164,377,145,019 VND, in which the total winning value is: 3,009,780,828,804 VND.
- The savings rate is: 4.89%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn are as follows:
- Is the investor of 239 development investment projects.
- Is the investor of 483 contractor selection plans, of which 475 were self-published, and 8 were published by other entities.
- Is the investor of 419 Tender Notices, of which 419 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
- Winning bidder: Công ty cổ phần xây dựng dịch vụ và thương mại An Phát
30/06/2025 12:26
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 11: Consulting and supervision of construction and equipment installation of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
- Winning bidder: VIET NHAT FIRE PROTECTION TRADING AND CONSTRUCTION COMPANY LIMITED
30/06/2025 12:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the request The contractor selection plan for a number of consulting packages of the project: Nui Doi Park, Soc Son District of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn with 7 bidding package.
28/06/2025 18:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 8: The whole construction of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
28/06/2025 15:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
28/06/2025 15:33
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
27/06/2025 20:07
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 1: Consulting on planning tasks of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:24
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 20: Consulting on verification of construction drawing design - additional estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:12
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 19: Consulting on designing construction drawings - additional estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 13: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
25/06/2025 21:41
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package No. 9: Construction supervision .
- Winning bidder: Công ty cổ phần xây dựng dịch vụ và thương mại An Phát
30/06/2025 12:26
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package 11: Consulting and supervision of construction and equipment installation .
- Winning bidder: PHU KHANG ARTCHITECTURE JOINT STOCK COMPANY, VIET NHAT FIRE PROTECTION TRADING AND CONSTRUCTION COMPANY LIMITED
30/06/2025 12:14
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package No. 16: Construction of paragraph from k0+00 to k8+00 .
- Winning bidder:
30/06/2025 11:22
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package No. 17: Construction of paragraph from K8+00 to K20+252 .
- Winning bidder: CONSULTANT TECHNOLOGY TRANSFER & CONSTRUCTION JOINT STOCK COMPANY, SAO DO CONSTRUCTION AND TRADING JOINT STOCK COMPANY
30/06/2025 11:21
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package 18: Construction insurance .
- Winning bidder: BAO MINH INSURANCE CORPORATION, BAO LONG INSURANCE CORPORATION, Tổng Công ty cổ phần bảo hiểm Petrolimex, PVI Insurance, Post - Telecommunication Joint - Stock Insurance Corporation, Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam, Vietinbank Insurance, Agriculture Bank Insurance Joint Stock Corporation, Sai Gon Ha Noi Insurance Corpration, Công ty cổ phần Tập đoàn bảo hiểm DBV, BaoViet Insurance Corporation, military insurance corporation, XUANTHANH INSURANCE JOINT STOCK CORPORATION
30/06/2025 11:20
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bidding package Tender package No 9: Construction supervision with 1 participating contractors .
29/06/2025 10:23
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn publishes the plan The contractor selection plan for a number of consulting packages of the project: Nui Doi Park, Soc Son District with 7 bidding package .
28/06/2025 18:15
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package 8: The whole construction .
- Winning bidder: Công ty cổ phần xây dựng số 9
28/06/2025 15:34
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package No. 9: Construction supervision .
- Winning bidder: Công ty cổ phần xây dựng dịch vụ và thương mại An Phát
28/06/2025 15:33
Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn announced the results of the bid package Package No. 15: The entire additional construction .
- Winning bidder: SAO VIET TRADING DEVELOPMENT AND CONSTRUCTION INVESTMENT COMPANY LIMITED, ARC DESIGN JOINT STOCK COMPANY, LINH GIANG CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
28/06/2025 08:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
- Winning bidder: Công ty cổ phần xây dựng dịch vụ và thương mại An Phát
30/06/2025 12:26
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 11: Consulting and supervision of construction and equipment installation of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
- Winning bidder: VIET NHAT FIRE PROTECTION TRADING AND CONSTRUCTION COMPANY LIMITED
30/06/2025 12:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the request The contractor selection plan for a number of consulting packages of the project: Nui Doi Park, Soc Son District of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn with 7 bidding package.
28/06/2025 18:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 8: The whole construction of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
28/06/2025 15:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
28/06/2025 15:33
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 9: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
27/06/2025 20:07
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 1: Consulting on planning tasks of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:24
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 20: Consulting on verification of construction drawing design - additional estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:12
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package No. 19: Consulting on designing construction drawings - additional estimates of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
26/06/2025 11:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted the results of the bidding package Package 13: Construction supervision of the investor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn.
25/06/2025 21:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted 480 of the contractor selection plan, which contains 1443 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted 469 Tender Notices in 426 bidding packages. Among these, 434 Tender Notices were self-invited, and 35 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has posted 1294 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1294 package, canceled the bid 0 package (among the bidding packages above).
- There are 888 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has a relationship with 422 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has a relationship with 362 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý dự án đầu tư xây dựng huyện Sóc Sơn has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects