Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai as follows:
- Has relationships with 4 project owners.
- Has relationships with 448 contractor.
- Announced 80 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 422 contractor selection plans with a total of 1702 bidding packages, of which 226 prequalification documents have not found the investment project.
- Has invited bids for 496 packages (with 519 tender notices), and conducted prequalification for 1 packages.
- There are 22 bidding packages with content that needs clarification.
- Announced the results of 1247 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 831 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 639 packages that have not fully posted the contractor selection results. Of these 619 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.74 contractors.
- Breakdown by bidding field: Goods 30.44%, Construction 36.61%, Consultancy 25.82%, Non-consultancy 2.50%, Mixed 4.62%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,887,318,894,580 VND, of which the total winning bid value is: 6,687,083,664,394 VND.
- The savings rate is: 2.91%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai as follows:
- Has relationships with 448 contractor.
- The average number of contractors participating in each bidding package is: 1.74 contractors.
- Proportion of bidding fields: Goods 30.44%, Construction 36.61%, Consulting 25.82%, Non-consulting 2.50%, Mixed 4.62%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,887,318,894,580 VND, in which the total winning value is: 6,687,083,664,394 VND.
- The savings rate is: 2.91%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai are as follows:
- Is the investor of 80 development investment projects.
- Is the investor of 434 contractor selection plans, of which 397 were self-published, and 37 were published by other entities.
- Is the investor of 522 Tender Notices, of which 489 were self-invited, and 33 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Regarding the approval of the contractor selection plan for the consulting package for planning tasks under the Cam My - Xuan Que new urban general planning project with 1 bidding package .
06/01/2026 15:08
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan (phase 2) International Health Quarantine Headquarters Project at Long Thanh International Airport with 3 bidding package .
05/01/2026 11:18
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Project contractor selection plan: Renovating and repairing the office, installing file shelves at the Provincial Construction Investment Project Management Board - Base II with 2 bidding package .
30/12/2025 18:00
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Plan to select contractors for a number of bidding packages to be implemented after the basic design of the Project to upgrade and expand route DT.773 (Long Thanh - Cam My - Xuan Loc), Xuan Loc, Cam My, Long Thanh districts (now communes: Xuan Hoa, Xuan Loc, Xuan Phu, Xuan Dong, Cam My, Xuan Duong) with 5 bidding package .
26/12/2025 17:56
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted the request contractor selection plan for the project of repairing the dike surface of Ba Ky, Long Thanh district, Nhon Trach district, Dong Nai province (Project preparation phase) of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai with 4 bidding package.
25/12/2025 15:22
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Plan for selecting contractors for a number of bidding packages to be implemented after the basic design of the project: Modernizing irrigation to adapt to climate change in Binh Phuoc province with 8 bidding package .
25/12/2025 10:44
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted the request Contractor selection plan Economic and technical report on construction investment Project: Adding and replacing the drainage system of DT.764 route, section from Km1+000 to Km2+500 of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai with 1 bidding package.
19/12/2025 22:27
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan Package: Procurement and installation of equipment under the Binh Phuoc Province Social Protection Center Construction project. Symbol: TB belongs to the project to build the Social Protection Center of Binh Phuoc province with 1 bidding package .
17/12/2025 08:42
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan for investment preparation consulting packages (4th time) under component project 1-2: Compensation, support, resettlement and construction of feeder roads and roads in Dong Nai province under the investment project to build Ring Road 4 of Ho Chi Minh City with 3 bidding package .
07/12/2025 19:46
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan for investment preparation consulting packages (3rd time) under component projects 1-2: Compensation, support, resettlement and construction of feeder roads and roads in Dong Nai province under the investment project to build Ring Road 4 of Ho Chi Minh City with 4 bidding package .
27/11/2025 11:09
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan contractor selection plan for the project of repairing the dike surface of Ba Ky, Long Thanh district, Nhon Trach district, Dong Nai province (Project preparation phase) with 4 bidding package .
25/12/2025 15:22
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan Economic and technical report on construction investment Project: Adding and replacing the drainage system of DT.764 route, section from Km1+000 to Km2+500 with 1 bidding package .
19/12/2025 22:27
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The contractor selection plan for the preparation of the project to repair the headquarters of the National Assembly Delegation Building and the purchase of additional equipment. with 3 bidding package .
02/07/2025 16:37
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The contractor selection plan for the preparation of the project to renovate and repair the office of the People's Committee of Tan Mai Ward (old) and housing of 65C Ha Huy Giap Street, Trung Dung Ward. with 3 bidding package .
20/06/2025 11:00
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan (continued) Feasibility study report on construction and construction against flooding in the area with 6 bidding package .
20/06/2025 08:52
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan (continued) The reinforcement project of Dong Nai river bank (from Phuoc Lu communal house to residential area along Rach Cat River), Bien Hoa City with 1 bidding package .
17/06/2025 13:55
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The contractor selection plan for the preparation of the project under the project of renovating and repairing the office of the Department of Labor, War Invalids and Social Affairs (former) Phan Dinh Phung Street, Quang Vinh Ward. with 3 bidding package .
17/06/2025 09:53
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The contractor selection plan for the preparation of the project of the office repair project (including 9 -storey building and office building of the National Assembly delegation and the provincial People's Council) and the purchase of additional equipment with 3 bidding package .
13/06/2025 16:17
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The contractor selection plan for the preparation of the project of the office repair project (including 9 -storey building and office building of the National Assembly delegation and the provincial People's Council) and the purchase of additional equipment with 3 bidding package .
13/06/2025 16:05
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan The plan to select a project contractor replaces the air -conditioner system at the state headquarters. with 3 bidding package .
18/04/2025 15:25
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Regarding the approval of the contractor selection plan for the consulting package for planning tasks under the Cam My - Xuan Que new urban general planning project with 1 bidding package .
06/01/2026 15:08
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan (phase 2) International Health Quarantine Headquarters Project at Long Thanh International Airport with 3 bidding package .
05/01/2026 11:18
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Project contractor selection plan: Renovating and repairing the office, installing file shelves at the Provincial Construction Investment Project Management Board - Base II with 2 bidding package .
30/12/2025 18:00
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Plan to select contractors for a number of bidding packages to be implemented after the basic design of the Project to upgrade and expand route DT.773 (Long Thanh - Cam My - Xuan Loc), Xuan Loc, Cam My, Long Thanh districts (now communes: Xuan Hoa, Xuan Loc, Xuan Phu, Xuan Dong, Cam My, Xuan Duong) with 5 bidding package .
26/12/2025 17:56
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted the request contractor selection plan for the project of repairing the dike surface of Ba Ky, Long Thanh district, Nhon Trach district, Dong Nai province (Project preparation phase) of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai with 4 bidding package.
25/12/2025 15:22
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Plan for selecting contractors for a number of bidding packages to be implemented after the basic design of the project: Modernizing irrigation to adapt to climate change in Binh Phuoc province with 8 bidding package .
25/12/2025 10:44
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted the request Contractor selection plan Economic and technical report on construction investment Project: Adding and replacing the drainage system of DT.764 route, section from Km1+000 to Km2+500 of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai with 1 bidding package.
19/12/2025 22:27
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan Package: Procurement and installation of equipment under the Binh Phuoc Province Social Protection Center Construction project. Symbol: TB belongs to the project to build the Social Protection Center of Binh Phuoc province with 1 bidding package .
17/12/2025 08:42
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan for investment preparation consulting packages (4th time) under component project 1-2: Compensation, support, resettlement and construction of feeder roads and roads in Dong Nai province under the investment project to build Ring Road 4 of Ho Chi Minh City with 3 bidding package .
07/12/2025 19:46
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai publishes the plan Contractor selection plan for investment preparation consulting packages (3rd time) under component projects 1-2: Compensation, support, resettlement and construction of feeder roads and roads in Dong Nai province under the investment project to build Ring Road 4 of Ho Chi Minh City with 4 bidding package .
27/11/2025 11:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted 422 of the contractor selection plan, which contains 1702 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted 519 Tender Notices in 496 bidding packages. Among these, 490 Tender Notices were self-invited, and 29 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has posted 1247 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1247 package, canceled the bid 1 package (among the bidding packages above).
- There are 831 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has a relationship with 448 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has a relationship with 79 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects