Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ as follows:
- Has relationships with 232 contractor.
- Announced 56 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 87 contractor selection plans with a total of 381 bidding packages, of which 18 prequalification documents have not found the investment project.
- Has invited bids for 159 packages (with 184 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 267 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 116 packages with results that do not have tender notice or prequalification notice.
- There are 194 packages that have not fully posted the contractor selection results. Of these 194 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.12 contractors.
- Breakdown by bidding field: Goods 8.15%, Construction 63.04%, Consultancy 26.09%, Non-consultancy 2.72%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,021,411,455,207 VND, of which the total winning bid value is: 1,962,820,227,902 VND.
- The savings rate is: 2.90%.
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ as follows:
- Has relationships with 232 contractor.
- The average number of contractors participating in each bidding package is: 2.12 contractors.
- Proportion of bidding fields: Goods 8.15%, Construction 63.04%, Consulting 26.09%, Non-consulting 2.72%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,021,411,455,207 VND, in which the total winning value is: 1,962,820,227,902 VND.
- The savings rate is: 2.90%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 56 investment and development projects.
- As the owner of 83 Contractor selection plan in which 83 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 167 bidding packages in which 167 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 8 bidding packages, of which 8 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.31% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Trị (8)
- Has relationships with 4 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Package No. 04: Consulting on setting up construction drawing design and cost estimate of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: Restoration of Monuments and Landscape Architecture Joint Stock Company
25/10/2024 08:42
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the request Component project 3: Vinh Moc tunnel relic area (phase 1), under the project: Preserving, restoring and upgrading key revolutionary historical relics in Quang Tri province of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with 5 bidding package.
25/10/2024 08:35
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ Posted Development Investment Project Component project 3 - Vinh Moc Tunnels relic site (phase 1) under the Project: Preserving, restoring and upgrading key revolutionary historical relics in Quang Tri province.
25/10/2024 08:08
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Construction bidding package, supply and installation of construction equipment of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
19/10/2024 14:53
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Bidding package TV05: Survey consulting, preparation of project feasibility study report of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: Công ty TNHH Tư vấn Xây dựng Trường Sơn
16/10/2024 09:20
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the request Adjusting the contractor selection plan (Phase 2): Component project 1: General Secretary Le Duan memorial area, Belonging to the project: Preserving, restoring and upgrading key revolutionary historical relics in the province Quang Tri of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with 3 bidding package.
14/10/2024 08:36
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Construction bidding package, supply and installation of construction equipment of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
06/10/2024 14:49
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Bidding package No. CRIEM-TV24: Consulting on verification of construction drawing designs and estimates of Component 2 subprojects of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
04/10/2024 16:18
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Shopping for furniture of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
04/10/2024 15:43
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Construction bidding package, supply and installation of construction equipment. of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: SAOVIET ELECTRICAL MECHANICAL AND FIREFIGHTING JOINT STOCK COMPANY
04/10/2024 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ announced the results of the bid package Package No. 04: Consulting on setting up construction drawing design and cost estimate .
- Winning bidder: Restoration of Monuments and Landscape Architecture Joint Stock Company
25/10/2024 08:42
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ publishes the plan Component project 3: Vinh Moc tunnel relic area (phase 1), under the project: Preserving, restoring and upgrading key revolutionary historical relics in Quang Tri province with 5 bidding package .
25/10/2024 08:35
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ publishes Tender Notice Construction bidding package, supply and installation of construction equipment in the form Competitive Offer .
19/10/2024 14:53
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ announced the results of the bid package Bidding package TV05: Survey consulting, preparation of project feasibility study report .
- Winning bidder: Công ty TNHH Tư vấn Xây dựng Trường Sơn
16/10/2024 09:20
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ publishes the plan Adjusting the contractor selection plan (Phase 2): Component project 1: General Secretary Le Duan memorial area, Belonging to the project: Preserving, restoring and upgrading key revolutionary historical relics in the province Quang Tri with 3 bidding package .
14/10/2024 08:36
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ announced the results of the bidding package Construction bidding package, supply and installation of construction equipment with 1 participating contractors .
12/10/2024 08:34
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ announced the results of the bidding package Shopping for furniture with 2 participating contractors .
11/10/2024 17:04
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ publishes Tender Notice Construction bidding package, supply and installation of construction equipment in the form Competitive Offer .
06/10/2024 14:49
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ announced the results of the bid package Bidding package No. CRIEM-TV24: Consulting on verification of construction drawing designs and estimates of Component 2 subprojects .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
04/10/2024 16:18
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ publishes Tender Notice Shopping for furniture in the form Competitive Offer .
04/10/2024 15:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Package No. 04: Consulting on setting up construction drawing design and cost estimate of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: Restoration of Monuments and Landscape Architecture Joint Stock Company
25/10/2024 08:42
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the request Component project 3: Vinh Moc tunnel relic area (phase 1), under the project: Preserving, restoring and upgrading key revolutionary historical relics in Quang Tri province of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with 5 bidding package.
25/10/2024 08:35
BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ Posted Development Investment Project Component project 3 - Vinh Moc Tunnels relic site (phase 1) under the Project: Preserving, restoring and upgrading key revolutionary historical relics in Quang Tri province.
25/10/2024 08:08
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Construction bidding package, supply and installation of construction equipment of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
19/10/2024 14:53
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Bidding package TV05: Survey consulting, preparation of project feasibility study report of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: Công ty TNHH Tư vấn Xây dựng Trường Sơn
16/10/2024 09:20
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the request Adjusting the contractor selection plan (Phase 2): Component project 1: General Secretary Le Duan memorial area, Belonging to the project: Preserving, restoring and upgrading key revolutionary historical relics in the province Quang Tri of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with 3 bidding package.
14/10/2024 08:36
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Construction bidding package, supply and installation of construction equipment of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
06/10/2024 14:49
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Bidding package No. CRIEM-TV24: Consulting on verification of construction drawing designs and estimates of Component 2 subprojects of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
04/10/2024 16:18
Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted Tender Notice Shopping for furniture of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ with the form Competitive Offer.
04/10/2024 15:43
The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted the results of the bidding package Construction bidding package, supply and installation of construction equipment. of the investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ.
- Winning bidder: SAOVIET ELECTRICAL MECHANICAL AND FIREFIGHTING JOINT STOCK COMPANY
04/10/2024 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted 87 of the contractor selection plan, which contains 381 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted 184 Tender Notice in the 159 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has posted 267 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 267 package, canceled the bid 0 package (among the bidding packages above).
- There are 116 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has a relationship with 232 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ is the investor of 167 package, of which 167 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ is the owner of 83 contractor selection plan. In which, they self-invite 83 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ is an investor with 211 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG TỈNH QUẢNG TRỊ is the investor of 56 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register