Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 02 as follows:
- Has relationships with 4 project owners.
- Has relationships with 211 contractor.
- Announced 187 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 415 contractor selection plans with a total of 2221 bidding packages, of which 102 prequalification documents have not found the investment project.
- Has invited bids for 167 packages (with 194 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 1297 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1147 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 820 packages that have not fully posted the contractor selection results. Of these 816 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.28 contractors.
- Breakdown by bidding field: Goods 8.25%, Construction 65.98%, Consultancy 23.71%, Non-consultancy 1.55%, Mixed 0%, Other fields 0.52%.
- The total value according to the packages with valid contractor selection results is: 1,337,175,280,158 VND, of which the total winning bid value is: 1,319,525,898,695 VND.
- The savings rate is: 1.32%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 02 as follows:
- Has relationships with 211 contractor.
- The average number of contractors participating in each bidding package is: 1.28 contractors.
- Proportion of bidding fields: Goods 8.25%, Construction 65.98%, Consulting 23.71%, Non-consulting 1.55%, Mixed 0%, Other 0.52%.
- The total value according to the bidding package with valid IMP is: 1,337,175,280,158 VND, in which the total winning value is: 1,319,525,898,695 VND.
- The savings rate is: 1.32%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án khu vực 02 are as follows:
- Is the investor of 187 development investment projects.
- Is the investor of 357 contractor selection plans, of which 325 were self-published, and 32 were published by other entities.
- Is the investor of 376 Tender Notices, of which 177 were self-invited, and 199 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 45 - Risk insurance for the Investor during the construction of Package No. 40 .
- Winning bidder: Vien Dong Assurance Corporation
05/01/2026 09:59
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 42 (Consulting) - Supervision for construction bidding packages No. 40 and No. 41 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHÚC GIA HUY
16/12/2025 09:03
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 40 (Construction and installation of additional items: Construction boundary piles, water collection ditches, bridges at DH1+188 Suoi Cai branch 2 and 02 bridges at the confluence of 2 Suoi Cai branches) .
- Winning bidder: Dong Bac Construction Co., Ltd
15/12/2025 16:13
Ban Quản lý dự án khu vực 02 publishes Tender Notice Tender package No 40 (Construction and installation of additional items: Construction boundary piles, water collection ditches, bridges at DH1+188 Suoi Cai branch 2 and 02 bridges at the confluence of 2 Suoi Cai branches) in the form Open bidding .
29/11/2025 12:02
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 44 - Evaluation of bidding documents and contractor selection results for bidding package No. 40 .
- Winning bidder: LAP XUAN CONSTRUCTION CONSULTING COMPANY LIMITED
25/11/2025 15:21
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 43 - Prepare bidding documents and evaluate bid documents for bidding package No. 40 .
- Winning bidder: CAT AN BIDDING CONSULTING COMPANY LIMITTED
25/11/2025 15:17
Ban Quản lý dự án khu vực 02 publishes the plan Contractor selection plan (continued) to serve construction work due to design changes under the authority of the Investment Decider with 7 bidding package .
24/11/2025 14:55
Ban Quản lý dự án khu vực 02 publishes the plan Contractor selection plan (continued) to serve construction work due to design changes under the authority of the Investment Decider with 7 bidding package .
24/11/2025 09:25
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 10 (Construction): Construction of lighting systems and lines, relocation of telecommunications systems, relocation of water supply systems .
- Winning bidder: DONG NHAT HUY CONSTRUCTION COMPANY LIMITED
21/10/2025 15:40
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 11 (supply, adjustment and equipment installation experiments) .
- Winning bidder: CÔNG TY CỔ PHẦN ĐIỆN ĐƯỜNG TRƯỜNG TRẠM
21/08/2025 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 19 (Construction): Construction and processing, mines and mines, explosive materials on the scope of the project .
- Winning bidder: LUNG LO CONSTRUCTION CORPORATION
20/08/2025 15:55
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 11 (Consulting): Examination of construction drawing design - estimation .
- Winning bidder: TRI DUNG CONSTRUCTION - TRANSPORTATION JOINT STOCK COMPANY
19/08/2025 15:43
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 24 (non -advice): Project insurance for package 12 .
- Winning bidder: Vien Dong Assurance Corporation
06/08/2025 11:29
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 23 (non -advice): Project insurance for package 11 .
- Winning bidder: Vien Dong Assurance Corporation
06/08/2025 11:27
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 18 (non -advice): Risk insurance of the investor in the process of implementing package 09, 10 .
- Winning bidder: PVI Insurance
01/08/2025 11:02
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 9 (Consulting): Supervision of construction of package No. 6 .
- Winning bidder: KHANG PHAT LOC COMPANY LIMITED
26/06/2025 16:50
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 10 (non -advice): Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
26/06/2025 16:48
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 12 (non -advice): Building insurance .
- Winning bidder: Vien Dong Assurance Corporation
26/06/2025 16:36
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 8 (Consulting): Construction supervision for package 5 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHÚC GIA HUY
26/06/2025 16:34
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 17 (Consulting): Evaluation E-HSMT and appraisal results of contractor selection package package package 11 .
- Winning bidder: LAP XUAN CONSTRUCTION CONSULTING COMPANY LIMITED
20/06/2025 08:57
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 45 - Risk insurance for the Investor during the construction of Package No. 40 .
- Winning bidder: Vien Dong Assurance Corporation
05/01/2026 09:59
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 42 (Consulting) - Supervision for construction bidding packages No. 40 and No. 41 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHÚC GIA HUY
16/12/2025 09:03
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package No. 40 (Construction and installation of additional items: Construction boundary piles, water collection ditches, bridges at DH1+188 Suoi Cai branch 2 and 02 bridges at the confluence of 2 Suoi Cai branches) .
- Winning bidder: Dong Bac Construction Co., Ltd
15/12/2025 16:13
Ban Quản lý dự án khu vực 02 publishes Tender Notice Tender package No 40 (Construction and installation of additional items: Construction boundary piles, water collection ditches, bridges at DH1+188 Suoi Cai branch 2 and 02 bridges at the confluence of 2 Suoi Cai branches) in the form Open bidding .
29/11/2025 12:02
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 44 - Evaluation of bidding documents and contractor selection results for bidding package No. 40 .
- Winning bidder: LAP XUAN CONSTRUCTION CONSULTING COMPANY LIMITED
25/11/2025 15:21
Ban Quản lý dự án khu vực 02 announced the results of the bid package Bidding package No. 43 - Prepare bidding documents and evaluate bid documents for bidding package No. 40 .
- Winning bidder: CAT AN BIDDING CONSULTING COMPANY LIMITTED
25/11/2025 15:17
Ban Quản lý dự án khu vực 02 publishes the plan Contractor selection plan (continued) to serve construction work due to design changes under the authority of the Investment Decider with 7 bidding package .
24/11/2025 14:55
Ban Quản lý dự án khu vực 02 publishes the plan Contractor selection plan (continued) to serve construction work due to design changes under the authority of the Investment Decider with 7 bidding package .
24/11/2025 09:25
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 10 (Construction): Construction of lighting systems and lines, relocation of telecommunications systems, relocation of water supply systems .
- Winning bidder: DONG NHAT HUY CONSTRUCTION COMPANY LIMITED
21/10/2025 15:40
Ban Quản lý dự án khu vực 02 announced the results of the bid package Package 11 (supply, adjustment and equipment installation experiments) .
- Winning bidder: CÔNG TY CỔ PHẦN ĐIỆN ĐƯỜNG TRƯỜNG TRẠM
21/08/2025 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án khu vực 02 has posted 415 of the contractor selection plan, which contains 2221 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án khu vực 02 has posted 194 Tender Notices in 167 bidding packages. Among these, 162 Tender Notices were self-invited, and 32 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực 02 has posted 1297 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1297 package, canceled the bid 0 package (among the bidding packages above).
- There are 1147 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án khu vực 02 has a relationship with 211 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực 02 has a relationship with 42 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án khu vực 02 has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects