Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 08 as follows:
- Has relationships with 3 project owners.
- Has relationships with 86 contractor.
- Announced 147 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 222 contractor selection plans with a total of 1298 bidding packages, of which 52 prequalification documents have not found the investment project.
- Has invited bids for 68 packages (with 70 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 223 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 178 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 970 packages that have not fully posted the contractor selection results. Of these 959 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 4.29%, Construction 82.86%, Consultancy 12.86%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 235,527,919,000 VND, of which the total winning bid value is: 232,301,569,709 VND.
- The savings rate is: 1.37%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án khu vực 08 as follows:
- Has relationships with 86 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 4.29%, Construction 82.86%, Consulting 12.86%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 235,527,919,000 VND, in which the total winning value is: 232,301,569,709 VND.
- The savings rate is: 1.37%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án khu vực 08 are as follows:
- Is the investor of 147 development investment projects.
- Is the investor of 201 contractor selection plans, of which 104 were self-published, and 97 were published by other entities.
- Is the investor of 260 Tender Notices, of which 21 were self-invited, and 239 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 02: Construction supervision consulting for Package No. 01 (construction) .
- Winning bidder: Công ty Cổ phần Long Bình Mê Kông
11/12/2025 16:21
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 (Construction): Construction of roads, drainage and ensuring traffic safety for construction .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG PHÚ GIA PHÁT
11/12/2025 16:13
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 .
- Winning bidder: TAK TRADING COMPANY LIMITED
26/11/2025 15:30
Ban Quản lý dự án khu vực 08 publishes Tender Notice Tender package No 01 (Construction): Construction of roads, drainage and ensuring traffic safety for construction in the form Open bidding .
26/11/2025 10:41
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 .
- Winning bidder: NHAT TINH ENVIRONMENT TECHNOLOGIES SOLUTION CORPORATION
14/11/2025 15:17
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 04 .
- Winning bidder: NEW TECHNOLOGY TRADING SERVICE CONSTRUCTION COMPANY LIMITED
12/11/2025 14:52
Ban Quản lý dự án khu vực 08 publishes Tender Notice Tender package No 01 in the form Open bidding .
06/11/2025 10:29
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 03 .
- Winning bidder: HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED
31/10/2025 14:26
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 02 .
- Winning bidder: QUANG MINH CONSTRUCTION TECHNOLOGY CONSULTING COMPANY LIMITED
31/10/2025 14:16
Ban Quản lý dự án khu vực 08 publishes the plan Project contractor selection plan: New construction of medical station in Xuan Bao commune, Cam My district with 10 bidding package .
23/10/2025 16:28
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực 08 publishes the plan Plan to select contractor project contractor construction infrastructure of Nhan Nghia commune with 7 bidding package .
16/07/2025 08:41
Ban Quản lý dự án khu vực 08 publishes the plan Supplementing the contractor and project selection plan: Building Hoa Sen Kindergarten Department with 2 bidding package .
01/07/2025 08:12
Ban Quản lý dự án khu vực 08 publishes the plan Plan to select contractor project contractor construction infrastructure of Nhan Nghia commune with 7 bidding package .
01/07/2025 08:07
Ban Quản lý dự án khu vực 08 publishes the plan Plan to select contractor project contractor construction infrastructure of Nhan Nghia commune with 7 bidding package .
30/06/2025 16:12
Ban Quản lý dự án khu vực 08 announced the results of the bid package Bidding package 10: Consulting on making bidding and evaluating Bid Bidding package of equipment number 09 .
- Winning bidder: QUANG MINH CONSTRUCTION TECHNOLOGY CONSULTING COMPANY LIMITED
06/06/2025 11:40
Ban Quản lý dự án khu vực 08 publishes the plan Supplementing the plan for the contractor to select the work of the work: Construction of the classroom, the function room of Hong Bang Primary School with 3 bidding package .
06/06/2025 11:31
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package 08: Consulting on setting up Bidding Documents and evaluating bids for construction and installation packages and fire protection + lightning protection equipment .
- Winning bidder: QUANG MINH CONSTRUCTION TECHNOLOGY CONSULTING COMPANY LIMITED
03/04/2025 14:58
Ban Quản lý dự án khu vực 08 announced the results of the bid package Bidding package No. 08: Consulting on preparation of E-Bidding Documents and evaluation of E-Bidding Documents for the bidding package Construction and fire protection equipment + lightning protection .
- Winning bidder: QUANG MINH CONSTRUCTION TECHNOLOGY CONSULTING COMPANY LIMITED
02/04/2025 15:40
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 06: Consulting on E-HSMT appraisal and LCNT results for Package No. 04 .
- Winning bidder: HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED
21/02/2025 15:16
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package 03: Consultancy on appraisal of bidding documents and contractor selection results for package No. 01 .
- Winning bidder: HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED
21/02/2025 15:14
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 02: Construction supervision consulting for Package No. 01 (construction) .
- Winning bidder: Công ty Cổ phần Long Bình Mê Kông
11/12/2025 16:21
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 (Construction): Construction of roads, drainage and ensuring traffic safety for construction .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG PHÚ GIA PHÁT
11/12/2025 16:13
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 .
- Winning bidder: TAK TRADING COMPANY LIMITED
26/11/2025 15:30
Ban Quản lý dự án khu vực 08 publishes Tender Notice Tender package No 01 (Construction): Construction of roads, drainage and ensuring traffic safety for construction in the form Open bidding .
26/11/2025 10:41
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 01 .
- Winning bidder: NHAT TINH ENVIRONMENT TECHNOLOGIES SOLUTION CORPORATION
14/11/2025 15:17
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 04 .
- Winning bidder: NEW TECHNOLOGY TRADING SERVICE CONSTRUCTION COMPANY LIMITED
12/11/2025 14:52
Ban Quản lý dự án khu vực 08 publishes Tender Notice Tender package No 01 in the form Open bidding .
06/11/2025 10:29
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 03 .
- Winning bidder: HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED
31/10/2025 14:26
Ban Quản lý dự án khu vực 08 announced the results of the bid package Package No. 02 .
- Winning bidder: QUANG MINH CONSTRUCTION TECHNOLOGY CONSULTING COMPANY LIMITED
31/10/2025 14:16
Ban Quản lý dự án khu vực 08 publishes the plan Project contractor selection plan: New construction of medical station in Xuan Bao commune, Cam My district with 10 bidding package .
23/10/2025 16:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án khu vực 08 has posted 222 of the contractor selection plan, which contains 1298 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án khu vực 08 has posted 70 Tender Notices in 68 bidding packages. Among these, 13 Tender Notices were self-invited, and 57 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực 08 has posted 223 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 223 package, canceled the bid 0 package (among the bidding packages above).
- There are 178 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án khu vực 08 has a relationship with 86 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án khu vực 08 has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án khu vực 08 has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects