Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án ODA Quảng Trạch as follows:
- Has relationships with 1 project owners.
- Has relationships with 44 contractor.
- Announced 20 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 17 contractor selection plans with a total of 55 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 28 packages (with 32 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 52 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 16 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 30 packages that have not fully posted the contractor selection results. Of these 29 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.41 contractors.
- Breakdown by bidding field: Goods 9.38%, Construction 56.25%, Consultancy 34.38%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 233,171,045,526 VND, of which the total winning bid value is: 231,715,428,152 VND.
- The savings rate is: 0.62%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án ODA Quảng Trạch as follows:
- Has relationships with 44 contractor.
- The average number of contractors participating in each bidding package is: 1.41 contractors.
- Proportion of bidding fields: Goods 9.38%, Construction 56.25%, Consulting 34.38%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 233,171,045,526 VND, in which the total winning value is: 231,715,428,152 VND.
- The savings rate is: 0.62%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý dự án ODA Quảng Trạch are as follows:
- Is the investor of 20 development investment projects.
- Is the investor of 20 contractor selection plans, of which 12 were self-published, and 8 were published by other entities.
- Is the investor of 38 Tender Notices, of which 29 were self-invited, and 9 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 4 bidding packages with 4 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban quản lý dự án ODA Quảng Trạch publishes the plan Second contractor selection plan for project: Construction of flooded road from Quang Luu commune center to Quang Thach commune center connecting provincial road 22 with 8 bidding package .
06/01/2026 14:43
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 10 bidding package .
06/01/2026 14:03
Investor Ban quản lý dự án ODA Quảng Trạch has posted an investment and development project Construction of a flooded road from the center of Quang Luu commune to the center of Quang Thach commune connecting provincial road 22.
06/01/2026 09:09
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 03: Cadastral measurement of land acquisition .
- Winning bidder: Công ty TNHH Đo đạc Bản đồ 179
08/09/2025 10:10
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 02: Verification of TKBV-DT .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HOÀNG AN
29/08/2025 16:37
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package 1: Consulting surveys, planning of BVT-dt .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KHANG PHÚ
13/08/2025 10:48
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 3 bidding package .
08/08/2025 13:57
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 7: Construction, equipment installation and traffic safety .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG 81
05/08/2025 09:07
Ban quản lý dự án ODA Quảng Trạch publishes Tender Notice Package 1: Consulting surveys, planning of BVT-dt in the form Open bidding .
04/08/2025 11:26
The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has posted the request Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district of the investor Ban quản lý dự án ODA Quảng Trạch with 3 bidding package.
01/08/2025 13:58
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 3 bidding package .
01/08/2025 13:58
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 3 bidding package .
01/07/2025 10:00
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package 02 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT CÔNG TRÌNH XÂY DỰNG SỐ 3
27/06/2025 16:06
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package 01 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG 2-9
12/05/2025 09:19
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 05:
Public construction
submit .
- Winning bidder: ADB TRADING COMPANY LIMITED, CÔNG TY TNHH BẢO THÀNH
28/04/2025 15:05
Ban quản lý dự án ODA Quảng Trạch announced the results of the bidding package Package 02 with 1 participating contractors .
22/04/2025 09:18
Ban quản lý dự án ODA Quảng Trạch announced the results of the bidding package Package 01 with 1 participating contractors .
01/04/2025 11:04
Ban quản lý dự án ODA Quảng Trạch publishes Tender Notice Package 02 in the form Open bidding .
31/03/2025 16:42
Ban quản lý dự án ODA Quảng Trạch announced the results of the bidding package Tender package No 05:
Public construction
submit with 1 participating contractors .
26/03/2025 10:06
Ban quản lý dự án ODA Quảng Trạch publishes Tender Notice Tender package No 05:
Public construction
submit in the form Open bidding .
13/03/2025 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án ODA Quảng Trạch publishes the plan Second contractor selection plan for project: Construction of flooded road from Quang Luu commune center to Quang Thach commune center connecting provincial road 22 with 8 bidding package .
06/01/2026 14:43
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 10 bidding package .
06/01/2026 14:03
Investor Ban quản lý dự án ODA Quảng Trạch has posted an investment and development project Construction of a flooded road from the center of Quang Luu commune to the center of Quang Thach commune connecting provincial road 22.
06/01/2026 09:09
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 03: Cadastral measurement of land acquisition .
- Winning bidder: Công ty TNHH Đo đạc Bản đồ 179
08/09/2025 10:10
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 02: Verification of TKBV-DT .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HOÀNG AN
29/08/2025 16:37
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package 1: Consulting surveys, planning of BVT-dt .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KHANG PHÚ
13/08/2025 10:48
Ban quản lý dự án ODA Quảng Trạch publishes the plan Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district with 3 bidding package .
08/08/2025 13:57
Ban quản lý dự án ODA Quảng Trạch announced the results of the bid package Package No. 7: Construction, equipment installation and traffic safety .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG 81
05/08/2025 09:07
Ban quản lý dự án ODA Quảng Trạch publishes Tender Notice Package 1: Consulting surveys, planning of BVT-dt in the form Open bidding .
04/08/2025 11:26
The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has posted the request Plan to select contractor projects to build roads from the district center connecting western residential areas, the center of Quang Trach district of the investor Ban quản lý dự án ODA Quảng Trạch with 3 bidding package.
01/08/2025 13:58
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án ODA Quảng Trạch has posted 17 of the contractor selection plan, which contains 55 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has posted 32 Tender Notices in 28 bidding packages. Among these, 29 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has posted 52 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 52 package, canceled the bid 0 package (among the bidding packages above).
- There are 16 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has a relationship with 44 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án ODA Quảng Trạch has a relationship with 36 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý dự án ODA Quảng Trạch has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects