Data analysis results of DauThau.info software for bid solicitors Ban quản lý Khu du lịch Thác Bản Giốc as follows:
- Has relationships with 9 contractor.
- Announced 8 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 51 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 37 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,159,103,720 VND, of which the total winning bid value is: 9,142,841,168 VND.
- The savings rate is: 0.18%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý Khu du lịch Thác Bản Giốc as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,159,103,720 VND, in which the total winning value is: 9,142,841,168 VND.
- The savings rate is: 0.18%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 8 investment and development projects.
- As the owner of 14 Contractor selection plan in which 14 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 2 packages are self-invited, and 2 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Construction and equipment installation of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN DỊCH VỤ KỸ THUẬT THƯƠNG MẠI VÀ CÔNG NGHỆ TẠ-MÃ
20/08/2024 16:39
Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted Tender Notice Construction and equipment installation of the investor Ban quản lý Khu du lịch Thác Bản Giốc with the form Competitive Offer.
13/08/2024 11:34
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Regarding the approval of the project contractor selection plan: Construction of temporary fences, bars, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation) of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 6 bidding package.
12/08/2024 18:08
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
12/08/2024 17:17
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
09/08/2024 15:15
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
09/08/2024 15:15
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Deploying repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: Viet Thien Advertising One Member Company Limited
08/08/2024 18:28
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Regarding: Approving the estimate and contractor selection plan for the contract package
"Implementing repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area" of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 1 bidding package.
08/08/2024 18:11
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Construction of artificial straw huts of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: Viet Thien Advertising One Member Company Limited
31/05/2024 16:42
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Approve the estimate and contractor selection plan for the package: Construction of artificial straw huts of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 1 bidding package.
31/05/2024 16:39
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý Khu du lịch Thác Bản Giốc announced the results of the bid package Construction and equipment installation .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ XÂY DỰNG NAM HỒNG, DOANH NGHIỆP TƯ NHÂN DỊCH VỤ KỸ THUẬT THƯƠNG MẠI VÀ CÔNG NGHỆ TẠ-MÃ
20/08/2024 16:39
Ban quản lý Khu du lịch Thác Bản Giốc publishes Tender Notice Construction and equipment installation in the form Competitive Offer .
13/08/2024 11:34
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Regarding the approval of the project contractor selection plan: Construction of temporary fences, bars, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation) with 6 bidding package .
12/08/2024 18:08
Ban quản lý Khu du lịch Thác Bản Giốc announced the results of the bid package Deploying repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area .
- Winning bidder: Viet Thien Advertising One Member Company Limited
08/08/2024 18:28
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Regarding: Approving the estimate and contractor selection plan for the contract package
"Implementing repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area" with 1 bidding package .
08/08/2024 18:11
Ban quản lý Khu du lịch Thác Bản Giốc announced the results of the bid package Construction of artificial straw huts .
- Winning bidder: Viet Thien Advertising One Member Company Limited
31/05/2024 16:42
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Approve the estimate and contractor selection plan for the package: Construction of artificial straw huts with 1 bidding package .
31/05/2024 16:39
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Approve the estimate and contractor selection plan for the package: Construction of artificial straw huts with 1 bidding package .
31/05/2024 16:30
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Approve the estimate and contractor selection plan for the package: Construction of artificial straw huts with 1 bidding package .
31/05/2024 16:21
Ban quản lý Khu du lịch Thác Bản Giốc publishes the plan Project contractor selection plan: Temporary promenade along the stream, area at the foot of Ban Gioc waterfall with 4 bidding package .
07/12/2023 16:32
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Construction and equipment installation of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN DỊCH VỤ KỸ THUẬT THƯƠNG MẠI VÀ CÔNG NGHỆ TẠ-MÃ
20/08/2024 16:39
Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted Tender Notice Construction and equipment installation of the investor Ban quản lý Khu du lịch Thác Bản Giốc with the form Competitive Offer.
13/08/2024 11:34
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Regarding the approval of the project contractor selection plan: Construction of temporary fences, bars, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation) of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 6 bidding package.
12/08/2024 18:08
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
12/08/2024 17:17
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
09/08/2024 15:15
Ban quản lý Khu du lịch Thác Bản Giốc Posted Development Investment Project Temporary construction of fences, barriers, control posts and other auxiliary contents at Ban Gioc waterfall landscape area (for pilot operation).
09/08/2024 15:15
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Deploying repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: Viet Thien Advertising One Member Company Limited
08/08/2024 18:28
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Regarding: Approving the estimate and contractor selection plan for the contract package
"Implementing repairs to bridge exit milestone 836 at Ban Gioc Waterfall tourist area" of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 1 bidding package.
08/08/2024 18:11
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the results of the bidding package Construction of artificial straw huts of the investor Ban quản lý Khu du lịch Thác Bản Giốc.
- Winning bidder: Viet Thien Advertising One Member Company Limited
31/05/2024 16:42
The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted the request Approve the estimate and contractor selection plan for the package: Construction of artificial straw huts of the investor Ban quản lý Khu du lịch Thác Bản Giốc with 1 bidding package.
31/05/2024 16:39
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý Khu du lịch Thác Bản Giốc has posted 15 of the contractor selection plan, which contains 51 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted 2 Tender Notice in the 2 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý Khu du lịch Thác Bản Giốc has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Thác Bản Giốc has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Thác Bản Giốc is the investor of 4 package, of which 2 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Thác Bản Giốc is the owner of 14 contractor selection plan. In which, they self-invite 14 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý Khu du lịch Thác Bản Giốc is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý Khu du lịch Thác Bản Giốc is the investor of 8 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register