Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Rừng as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 14 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 73,200,000 VND, of which the total winning bid value is: 73,200,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Rừng as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 73,200,000 VND, in which the total winning value is: 73,200,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý Rừng are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 15 contractor selection plans, of which 9 were self-published, and 6 were published by other entities.
- Is the investor of 6 Tender Notices, of which 0 were self-invited, and 6 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý Rừng announced the results of the bid package Shop for Composite shells .
- Winning bidder: Công ty Trách nhiệm hữu hạn một thành viên in ấn Nguyễn Lập
15/07/2026 13:31
Ban Quản lý Rừng announced the results of the bid package Shopping for specialized forest protection force uniforms in 2026 .
- Winning bidder: 19-5 COMPANY
07/07/2026 07:42
Ban Quản lý Rừng publishes the plan Procurement of Composite shells and shell running machines with 1 bidding package .
03/07/2026 14:20
Ban Quản lý Rừng publishes the plan Shopping for specialized forest protection force uniforms in 2026 with 1 bidding package .
25/06/2026 16:53
Ban Quản lý Rừng announced the results of the bid package Carry out reduction of forest fire materials .
- Winning bidder: CÔNG TY TNHH NGUYỄN HÒA MAI
23/05/2026 07:34
Ban Quản lý Rừng publishes the plan Carry out reduction of forest fire materials with 1 bidding package .
18/05/2026 09:28
Ban Quản lý Rừng announced the results of the bid package Repair water regulation culverts to protect forests .
- Winning bidder: CÔNG TY TNHH HOÀ AN BẾN TRE
19/11/2025 08:54
Ban Quản lý Rừng announced the results of the bid package Repairing the headquarters of the Forest Management Board .
- Winning bidder: CÔNG TY TNHH HOÀ AN BẾN TRE
31/10/2025 15:35
Ban Quản lý Rừng publishes the plan Repairing the headquarters of the Forest Management Board with 1 bidding package .
27/10/2025 15:47
Ban Quản lý Rừng publishes the plan Repair water regulation culverts to protect forests with 1 bidding package .
27/10/2025 15:43
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý Rừng publishes the plan Investigation determines the status quo of forest in Ben Tre province of the Protection Forest and Special Forest Management Board with 1 bidding package .
15/08/2025 08:59
Ban Quản lý Rừng publishes the plan Investigation determines the status quo of forest in Ben Tre province of the Protection Forest and Special Forest Management Board with 1 bidding package .
19/06/2025 09:02
Ban Quản lý Rừng publishes the plan Procurement of interest shells performed forest protection for forest management and special -use forest management with 1 bidding package .
16/06/2025 10:53
Ban Quản lý Rừng publishes the plan Planting forest replaces forest areas to other purposes to implement the Ba Lai 8 Bridge construction project on the coastal road of Ben Tre province with 1 bidding package .
14/04/2025 14:58
Ban Quản lý Rừng announced the results of the bid package Repairing toilets of the Protection and Special Use Forest Management Board .
- Winning bidder: Son Ha Nam DatConstruction Investment Company Limited
11/12/2024 11:13
Ban Quản lý Rừng publishes the plan Repairing toilets of the Protection and Special Use Forest Management Board with 1 bidding package .
11/12/2024 11:10
Ban Quản lý Rừng publishes the plan Project Determining boundaries and placing additional markers on forestry planning land assigned to the Management Board of Protection and Special Use Forests for management in Ben Tre province with 4 bidding package .
05/11/2024 08:34
Ban Quản lý Rừng publishes the plan Taking care of forests in Ben Tre province in 2024 with 1 bidding package .
11/09/2024 10:14
Ban Quản lý Rừng publishes the plan Planting forests in Ben Tre province in 2024 with 3 bidding package .
23/08/2024 09:03
Ban Quản lý Rừng publishes the plan Developing a Tourism Development Plan for Eco-tourism, Relaxation, and Recreation in Forests within the Province of Ben Tre (2022-2030) with 2 bidding package .
07/02/2023 14:25
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý Rừng announced the results of the bid package Shop for Composite shells .
- Winning bidder: Công ty Trách nhiệm hữu hạn một thành viên in ấn Nguyễn Lập
15/07/2026 13:31
Ban Quản lý Rừng announced the results of the bid package Shopping for specialized forest protection force uniforms in 2026 .
- Winning bidder: 19-5 COMPANY
07/07/2026 07:42
Ban Quản lý Rừng publishes the plan Procurement of Composite shells and shell running machines with 1 bidding package .
03/07/2026 14:20
Ban Quản lý Rừng publishes the plan Shopping for specialized forest protection force uniforms in 2026 with 1 bidding package .
25/06/2026 16:53
Ban Quản lý Rừng announced the results of the bid package Carry out reduction of forest fire materials .
- Winning bidder: CÔNG TY TNHH NGUYỄN HÒA MAI
23/05/2026 07:34
Ban Quản lý Rừng publishes the plan Carry out reduction of forest fire materials with 1 bidding package .
18/05/2026 09:28
Ban Quản lý Rừng announced the results of the bid package Repair water regulation culverts to protect forests .
- Winning bidder: CÔNG TY TNHH HOÀ AN BẾN TRE
19/11/2025 08:54
Ban Quản lý Rừng announced the results of the bid package Repairing the headquarters of the Forest Management Board .
- Winning bidder: CÔNG TY TNHH HOÀ AN BẾN TRE
31/10/2025 15:35
Ban Quản lý Rừng publishes the plan Repairing the headquarters of the Forest Management Board with 1 bidding package .
27/10/2025 15:47
Ban Quản lý Rừng publishes the plan Repair water regulation culverts to protect forests with 1 bidding package .
27/10/2025 15:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý Rừng has posted 9 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý Rừng has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý Rừng has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý Rừng has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects