Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý rừng phòng hộ Kỳ Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 5 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 17 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 982,362,000 VND, of which the total winning bid value is: 982,362,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý rừng phòng hộ Kỳ Sơn as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 982,362,000 VND, in which the total winning value is: 982,362,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý rừng phòng hộ Kỳ Sơn are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 7 contractor selection plans, of which 6 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the results of the bidding package The whole construction part of the investor Ban quản lý rừng phòng hộ Kỳ Sơn.
- Winning bidder: Công ty cổ phần tư vấn đầu tư và xây dựng Phong Thành
12/09/2022 22:26
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the results of the bidding package The entire construction part of the investor Ban quản lý rừng phòng hộ Kỳ Sơn.
- Winning bidder: Công Ty Cổ Phần Đầu Tư và Phát Triển Nam Trung
12/09/2022 07:47
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:34
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:23
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:14
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station.
06/09/2022 07:00
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station.
06/09/2022 07:00
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing roads, drainage ditches and agency auxiliary items of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
30/08/2022 20:50
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing roads, drainage ditches and agency auxiliary items.
30/08/2022 07:00
The Bid solicitor Anh Duc Investment and Construction Joint Stock Company has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
09/08/2022 22:20
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý rừng phòng hộ Kỳ Sơn announced the results of the bid package The whole construction part .
- Winning bidder: Công ty cổ phần tư vấn đầu tư và xây dựng Phong Thành
12/09/2022 22:26
Ban quản lý rừng phòng hộ Kỳ Sơn announced the results of the bid package The entire construction part .
- Winning bidder: Công Ty Cổ Phần Đầu Tư và Phát Triển Nam Trung
12/09/2022 07:47
Ban quản lý rừng phòng hộ Kỳ Sơn publishes the plan Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station with 3 bidding package .
06/09/2022 08:34
Ban quản lý rừng phòng hộ Kỳ Sơn publishes the plan Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station with 3 bidding package .
06/09/2022 08:23
Ban quản lý rừng phòng hộ Kỳ Sơn publishes the plan Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station with 3 bidding package .
06/09/2022 08:14
Ban quản lý rừng phòng hộ Kỳ Sơn publishes the plan Repairing roads, drainage ditches and agency auxiliary items with 3 bidding package .
30/08/2022 20:50
Ban quản lý rừng phòng hộ Kỳ Sơn publishes Tender Notice Supply rice to support poor households in borderless villages participating in forest protection contracts under Resolution 30a, 2016 Ky Son district. (Posted on the bidding newspaper No. 224 on 11/23/2016) in the form National Competitive Bidding .
23/11/2016 07:27
Ban quản lý rừng phòng hộ Kỳ Sơn publishes Tender Notice All construction and installation works and general items in the form National Competitive Bidding .
08/07/2016 17:03
Ban quản lý rừng phòng hộ Kỳ Sơn publishes Tender Notice The entire construction and installation part he submitted and the general items in the form National Competitive Bidding .
08/07/2016 16:55
Ban quản lý rừng phòng hộ Kỳ Sơn publishes the plan Forest management and protection station in Hue Tu, Ky Son district with 4 bidding package .
08/07/2016 16:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the results of the bidding package The whole construction part of the investor Ban quản lý rừng phòng hộ Kỳ Sơn.
- Winning bidder: Công ty cổ phần tư vấn đầu tư và xây dựng Phong Thành
12/09/2022 22:26
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the results of the bidding package The entire construction part of the investor Ban quản lý rừng phòng hộ Kỳ Sơn.
- Winning bidder: Công Ty Cổ Phần Đầu Tư và Phát Triển Nam Trung
12/09/2022 07:47
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:34
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:23
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
06/09/2022 08:14
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station.
06/09/2022 07:00
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station.
06/09/2022 07:00
The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted the request Repairing roads, drainage ditches and agency auxiliary items of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
30/08/2022 20:50
Investor Ban quản lý rừng phòng hộ Kỳ Sơn has posted an investment and development project Repairing roads, drainage ditches and agency auxiliary items.
30/08/2022 07:00
The Bid solicitor Anh Duc Investment and Construction Joint Stock Company has posted the request Repairing auxiliary items and anti-slippery embankment at Na Loi NR Station of the investor Ban quản lý rừng phòng hộ Kỳ Sơn with 3 bidding package.
09/08/2022 22:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý rừng phòng hộ Kỳ Sơn has posted 6 of the contractor selection plan, which contains 17 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted 2 Tender Notices in 2 bidding packages. Among these, -1 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý rừng phòng hộ Kỳ Sơn has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban quản lý rừng phòng hộ Kỳ Sơn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects