Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban quản lý xã Dur Kmăl as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý xã Dur Kmăl as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban quản lý xã Dur Kmăl are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 2 contractor selection plans, of which 0 were self-published, and 2 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban quản lý xã Dur Kmăl announced the results of the bid package Construction insurance .
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
16/04/2026 09:28
Ban quản lý xã Dur Kmăl announced the results of the bid package Construction .
- Winning bidder: NGUYEN VU CONSULTING LIMITED COMPANY
07/04/2026 08:49
Ban quản lý xã Dur Kmăl announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN XÂY DỰNG VCM
09/02/2026 15:31
Ban quản lý xã Dur Kmăl announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG M.T
09/02/2026 14:15
Ban quản lý xã Dur Kmăl publishes Tender Notice Construction in the form Open bidding .
04/02/2026 15:29
Ban quản lý xã Dur Kmăl announced the results of the bid package Appraisal of bidding documents, appraisal of industrial engineering design .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG CAO THANH
02/02/2026 14:24
Ban quản lý xã Dur Kmăl publishes the plan Project contractor selection plan: Road from Dur Kmăl commune to Bang A Drênh commune, Krong Ana district with 6 bidding package .
02/02/2026 14:19
Ban quản lý xã Dur Kmăl announced the results of the bid package Consulting on setting up HSMT; evaluation of bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CAO NGUYÊN XANH
02/02/2026 14:14
Ban quản lý xã Dur Kmăl publishes the plan Project contractor selection plan: Road from Dur Kmăl commune to Bang A Drênh commune, Krong Ana district with 6 bidding package .
26/01/2026 10:04
Investor Ban quản lý xã Dur Kmăl has posted an investment and development project Road from Dur Kmăl commune to Bang A Drênh commune, Krong Ana district.
26/01/2026 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects