Data analysis results of DauThau.info software for bid solicitors Bộ Tư lệnh Quân khu 9 as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 51 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 17 contractor selection plans with a total of 61 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 35 packages that have not fully posted the contractor selection results. Of these 35 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,351,093,000 VND, of which the total winning bid value is: 1,351,093,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Bộ Tư lệnh Quân khu 9 as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,351,093,000 VND, in which the total winning value is: 1,351,093,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Bộ Tư lệnh Quân khu 9 are as follows:
- Is the investor of 51 development investment projects.
- Is the investor of 18 contractor selection plans, of which 15 were self-published, and 3 were published by other entities.
- Is the investor of 33 Tender Notices, of which 0 were self-invited, and 33 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bộ Tư lệnh Quân khu 9 publishes Tender Notice Contract TV-10: Installation of GPMB and LGDB posts. in the form Open bidding .
28/08/2026 14:38
Bộ Tư lệnh Quân khu 9 publishes Tender Notice Contract TV-12: Design survey for BVTC and BVTC - DT (Construction) projects. in the form Open bidding .
28/08/2026 14:30
Bộ Tư lệnh Quân khu 9 publishes the plan Project: Border Patrol Road in the territory of Military Region 9, Component Project 2: From Point 290 to Point 294 and from Point 301 to Point 305, An Giang Province. with 15 bidding package .
25/08/2026 10:00
Investor Bộ Tư lệnh Quân khu 9 has posted an investment and development project Border patrol road in the area of Military Region 9, Component Project 2: From point 290 to point 294 and from point 301 to point 305, An Giang province..
25/08/2026 08:08
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package TV-04: Advice on making environmental impact assessment reports .
- Winning bidder: Nam Viet Technology Science and Environmental Joint Stock Company
18/12/2025 14:35
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package TV-04: Advice on making environmental impact assessment reports .
- Winning bidder: Nam Viet Technology Science and Environmental Joint Stock Company
18/12/2025 14:34
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Bidding package MS-07: Procurement of business tools; sign system, barracks board .
20/11/2025 14:50
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package MS-08: Procurement and installation of meeting room walls and curtains .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY LẮP TRÍ VIỆT
20/11/2025 14:49
Bộ Tư lệnh Quân khu 9 announced the results of the bid package TV-06 Bidding Package: Terrain survey consultancy, geology, feasibility study report .
- Winning bidder: Trung tâm quản lý nhà ở và chất lượng công trình xây dựng
30/10/2025 14:54
Bộ Tư lệnh Quân khu 9 announced the results of the bid package TV-06 Bidding Package: Terrain survey consultancy, geology, feasibility study report .
- Winning bidder: CIC GROUP JOINT STOCK COMPANY
30/10/2025 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
Bộ Tư lệnh Quân khu 9 publishes the plan Plan for contractor selection for phase 2 of the project Construction of a number of items under the Military Region 9 agency with 21 bidding package .
09/10/2025 10:32
Bộ Tư lệnh Quân khu 9 publishes the plan Plan for contractor selection for phase 2 of the project Construction of a number of items under the Military Region 9 agency with 21 bidding package .
09/10/2025 09:05
Bộ Tư lệnh Quân khu 9 publishes the plan Project: An Giang border patrol road/QK9 (period 2026-2030) with 8 bidding package .
22/04/2025 14:19
Bộ Tư lệnh Quân khu 9 publishes the plan Project: Border patrol road Kien Giang/QK9 (phase 2026-2030) with 8 bidding package .
22/04/2025 11:04
Bộ Tư lệnh Quân khu 9 publishes the plan The border patrol road of Dong Thap province/QK9 (period 2021-2025) with 6 bidding package .
22/04/2025 10:30
Bộ Tư lệnh Quân khu 9 publishes the plan The border patrol road of Dong Thap province/QK9 (period 2021-2025) with 6 bidding package .
11/02/2025 09:10
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package MS-04: Lightning protection system .
- Winning bidder: 319 CORPORATION MINISTRY OF NATIONAL DEFENCE
25/12/2024 10:16
Bộ Tư lệnh Quân khu 9 publishes the plan Package No. 01: Procurement of small construction equipment with 2 bidding package .
03/10/2024 11:05
Bộ Tư lệnh Quân khu 9 publishes the plan Package No. 01: Procurement of small construction equipment with 2 bidding package .
03/10/2024 11:04
Bộ Tư lệnh Quân khu 9 publishes the plan Plan for contractor selection for phase 2 of the project Construction of a number of items under the Military Region 9 agency with 21 bidding package .
02/10/2024 09:27
The data sheet has been partially hidden, to see the full information please Login or Register
Bộ Tư lệnh Quân khu 9 publishes Tender Notice Contract TV-10: Installation of GPMB and LGDB posts. in the form Open bidding .
28/08/2026 14:38
Bộ Tư lệnh Quân khu 9 publishes Tender Notice Contract TV-12: Design survey for BVTC and BVTC - DT (Construction) projects. in the form Open bidding .
28/08/2026 14:30
Bộ Tư lệnh Quân khu 9 publishes the plan Project: Border Patrol Road in the territory of Military Region 9, Component Project 2: From Point 290 to Point 294 and from Point 301 to Point 305, An Giang Province. with 15 bidding package .
25/08/2026 10:00
Investor Bộ Tư lệnh Quân khu 9 has posted an investment and development project Border patrol road in the area of Military Region 9, Component Project 2: From point 290 to point 294 and from point 301 to point 305, An Giang province..
25/08/2026 08:08
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package TV-04: Advice on making environmental impact assessment reports .
- Winning bidder: Nam Viet Technology Science and Environmental Joint Stock Company
18/12/2025 14:35
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package TV-04: Advice on making environmental impact assessment reports .
- Winning bidder: Nam Viet Technology Science and Environmental Joint Stock Company
18/12/2025 14:34
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Bidding package MS-07: Procurement of business tools; sign system, barracks board .
20/11/2025 14:50
Bộ Tư lệnh Quân khu 9 announced the results of the bid package Package MS-08: Procurement and installation of meeting room walls and curtains .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY LẮP TRÍ VIỆT
20/11/2025 14:49
Bộ Tư lệnh Quân khu 9 announced the results of the bid package TV-06 Bidding Package: Terrain survey consultancy, geology, feasibility study report .
- Winning bidder: Trung tâm quản lý nhà ở và chất lượng công trình xây dựng
30/10/2025 14:54
Bộ Tư lệnh Quân khu 9 announced the results of the bid package TV-06 Bidding Package: Terrain survey consultancy, geology, feasibility study report .
- Winning bidder: CIC GROUP JOINT STOCK COMPANY
30/10/2025 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Bộ Tư lệnh Quân khu 9 has posted 17 of the contractor selection plan, which contains 61 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Bộ Tư lệnh Quân khu 9 has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Bộ Tư lệnh Quân khu 9 has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Bộ Tư lệnh Quân khu 9 has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Bộ Tư lệnh Quân khu 9 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects